See Specification Status , “Prerequisites.”
Before you can choose the
Status
tab, all data must be saved.
In the specification header data, choose the
Status
tab.
Enter data as required. Note the following:
Field |
Note |
---|---|
|
To switch a status to the next follow-on status, you have the following options:
|
|
If you work without change numbers, a status entry is valid from 01/01/0001 through 12/31/9999. If you change an entry in the
PUBLIC / DE / IP / valid from 01/01/0001 / valid through 12/31/9999 is changed to: PUBLIC / DE / IP / valid from 01/01/1998 / valid through 12/31/9999 Confirm your entries and choose
PUBLIC / DE / IP / valid from 01/01/0001 / valid through 12/31/1997 PUBLIC / DE / IP / valid from 01/01/1998 / valid through 12/31/9999 |
Confirm and save your entries.
Note
You must save each time you move on.
To exit the
Status
tab page, you must have saved the data unless you choose
Cancel
.
If you have chosen
Confirm
, the
Rating
and
Validity area
fields are no longer ready for input.
If a data record for the specification has an active usage for which a status entry applies that does not permit changes, the icon is displayed for the data record and the data record can no longer be edited.
Note
For an active usage, a status entry applies if there is a status entry on at least one day of its validity interval that has the same rating and overlaps with the validity area of the usage (see also Change Not Permitted ).