Automatic release of an order takes place when the order is created. You can use this function if you do not need time for preparatory activities between creating and releasing an order.
You can use the production scheduling profile to define that an order is automatically released when it is created. You maintain the production scheduling profile in Customizing for
Shop Floor Control
, by choosing
The assignment of the production scheduling profile to the order is made via the material master record of the material to be produced (tab page
Work scheduling
). There, you can either directly enter the profile or carry out indirect assignment via the production scheduler (you define the production scheduler in Customizing for Shop Floor Control by choosing
With automatic release, the order and all its operations are released.