Updating for Standard Analyses: Requirement/Stock and Parameters ControllingUpdating the key figures for the standard analyses of requirement/stock (current, long-term planning) and parameters controlling does not take place continually and must therefore be initialized via a report, which you can find using the menu. This report can also run in the background.
The information structure S094 provides the basis for the standard analyses requirement/stock. On the one hand, the data relating to the requirements and stock situation flows from MRP into this information structure (data basis for the standard analysis of the current stock/requirements situation) and on the other hand, data flows into a separate planning version from long-term planning (data basis for the standard analysis long-term planning).
The parameters controlling analysis is based on the data that is updated to the information structures S031 and S032. Updating of the information structure S031 must therefore reflect the current status for the key figures
Stock at receipt
and
Value of stock at receipt
.
You can activate the update of the standard analysis requirement/stock for long-term planning in the long-term planning menu. Use the information system menu to update the standard analyses of the current requirement/stock and of parameters controlling.
Caution
If you want to carry out an ad hoc standard analysis for requirement/stock or parameters controlling and do not want to initialize an update, select the field
Ad-hoc evaluation
from the selection screen of the standard analysis in question. The data is then read directly.
Activating the Update for Standard Analyses: Requirement/Stock - Current and Parameters Controlling
To activate the update for the analysis of stock/requirement - current and parameters controlling, proceed as follows:
From the Inventory Controlling menu, select
or
The selection screen of the report for updating appears.
Specify the selection parameters you require. You can use the system help functions to help you.
Select
Activating the Update for Standard Analysis: Stock/Requirements - Long-Term Planning
From the R/3 system menu, select
The long-term planning menu appears.
Select
The selection screen of the report for updating appears.
Specify the desired selection parameters. You can use the system help functions to help you.
Select