Show TOC

 Examples of DTUC for Length-Based Materials

If you want to use the examples in this document in the system, you must meet the following prerequisites.

You have read the document http://aiokeh.wdf.sap.corp:1080/SAPIKS2/logonFromUrl.sap?_LOIO=E168843E56723E44E10000000A114084&TMP_IWB_TASK=PREVIEW2&RELEASE=500&IWB_INDUSTRY=ECC-DIMP&LANGUAGE=EN&_CLASS=IWB_EXTHLPINDUSTRY=ECC-DIMP&LANGUAGE=EN&_CLASS=IWB_EXTHLPCharacteristics for SAP for Mill ProductsInformation published on non-SAP site .

You must make the settings described under “Prerequisites“ in the document Delivery-Related Trading Unit Change.

Cutting

Cutting is required if the length of the assigned batch is 4000 m in the outbound delivery but the sales order calls for 4x1000 m. In this situation, the system compares the values of the Individual length characteristic in the sales order with those of the assigned batch. In DTUC processing, the system then generates four new batches, each with a length of 1000 m, as receiving items .

Spooling/Lagging/Additional Packaging

In all other characteristic changes, such as spooling, lagging, and additional packaging, the system copies and updates the batches of the batch split items as receiving items in DTUC processing.