If a routing exists for the material to be produced, components can be assigned to specific operations in the routing.
If necessary, the following indicator is copied from the operations in a routing:
Backflushing
: If the
Backflushing
indicator is set for a component, the withdrawal posting for the component is carried out automatically with the completion confirmation of the operation to which the component is assigned. You can set this indicator on the
General data
screen of the component (see
Changing Component Data
.)
Note
The
Backflushing
indicator can also be set in the work center and in the material master (see
Goods Movements During Confirmation
).