Capacity Leveling (PP-CRP-LVL)
Functions in Capacity Leveling
Dispatching Operations
Date Determination in Dispatching and Rescheduling
Defining the Dispatching Sequence
Planning Taking Account of the Sequence
Carrying out Checks for Dates and Work Centers
Finite Scheduling
Midpoint Scheduling
Scheduling Dispatched Activities in the Network
Display Strategy, Changing
Use Operation and Order Floats for Dispatching
Insert Operation
Taking the Whole Capacity Load into Account
Dispatch at Earliest Point in Time
Planning in Non-Work Periods
Fixing Time Periods
Dispatching with Automatic Change of Planning Dire
Rescheduling Planned Orders Taking Production Vers
Automatic Dispatching of Planned Orders Taking Pro
Changing Production Versions of Planned Orders
Displaying Information on the Capacity Commitment
Splitting and Allocating
Planning Tables
Capacity planning table
Working with the Capacity Planning Table
Selecting Objects
Selecting or Highlighting Ops. Belonging Together
Defining How Operations Belong Together
Changing Size of Planning Table
Changing the Relative Sizes of Screen Sections
Changing the Sort Sequence
Changing Increment for Time Display
Changing Time Scale
Positioning on the Time Scale
Inserting Date Markers
Displaying the Shift Calendar
Hiding Non-work Periods
Zooming
Hiding and Showing the Time-Now Line
Functions in the Capacity Planning Table
Displaying Objects (order, work center...)
Creating an Order
Changing an Order
Planning Capacity Requirements
Dispatching Operations Manually
Manually Dispatch, Deallocate and Reschedule Operation Groups
Dispatching Operations Automatically
Rescheduling Operations
Deallocating Operations
Splitting and Allocating Capacity Requirements
Changing Capacity Requirements
Changing the Available Capacity
Printing
Displaying Multiple Commitments
Displaying Profiles
Displaying Logs
Saving Planning
Planning to Period Split
Consider Setup Time When Dispatching
Changing the Standard Value for Setup Manually
Adjust the setup time automatically
Setup time optimization
Dispatching at the Best Time for Setup
Setup matrix
Setup Group Category and Setup Group Key
Displaying Material Stock Curves
Material Availability Check (ATP) on the Capacity
Planning Table (tabular form)
Functions in the Planning Table (tabular form)
Dispatching Requirements
Deallocating Requirements
Splitting Requirements
Consider Setup Time When Dispatching
Changing the Standard Value for Setup Manually
Adjust the setup time automatically
Setup time optimization
Dispatching at the Best Time for Setup
Setup matrix
Setup Group Category and Setup Group Key
Changing/Displaying Data for Operation, Order or C
Maintaining Sequence Numbers
Displaying Profiles
Further Display Functionality
Changing View in the Capacity Planning Table (tabu
Creating an Order
Changing an Order
Displaying Logs
Saving Planning
Executing Capacity Leveling/Planning Table Modes
Capacity Availability Check
Checks in the Capacity Availability Check
Finite Scheduling in the Availability Check
Considering the Backlog
Determination of Basic Load
Determination of Basic Load (Report RCCYLOAD)
Checking the Capacity Availability Online
Overall Profile for the Capacity Availability Check
Mass Processing
Defining Parameters for Mass Processing
Saving Parameters for Mass Processing
Starting or Scheduling Mass Processing
Calling up the Log for Mass Processing
Create, Change Variant for Mass Processing Report
Event-Driven Mass Processing
User Exits
Settings and Profiles for Capacity Leveling
Overall Profile
Control Profile
Selection Profile
Time Profile
Changing the Time Profile on the Initial Screen of
Evaluation Profile
Strategy Profile
Period Profile
Profile for the Planning Table (tabular form)
Profile for Capacity Planning Table
List profile
Set
Field Selection
Check Report for Analyzing the Overall Profile for
Examples of General Settings