 Shift Factor

There are two shift factors in the Maintenance Planning component. These are shift factors for the following cases:

  • Premature completion

  • Delayed completion

You can define the shift factor specifically for your maintenance plan by specifying the shift percentage to be taken into account when calculating the next due date.

The shift factor only applies once the maintenance plan has already been scheduled, and when the difference between the planned date and actual date lies outside the tolerance range.

Example Example

The planned date for your maintenance order was 01.08.05, but it was confirmed 15 days too late, namely on 16.08.05. The next planned date may now be on a different date since this is dependent on the shift factors entered. Three possible shift factors are shown in the table below:

End of the example.

Shift Factors

Planned Date

Confirmed

on the

Next

Planned Date

Shift

Factor

01.08.2005

16.08.2005

01.09.2005

0 %

16.09.2005

100 %

08.09.2005

50 %