Show TOC

 Updating the Preliminary Cost Estimate

Prerequisites

Changes have been made to the routing.

Procedure

  1. Choose Start of the navigation path Accounting Next navigation step Controlling Next navigation step Product Cost Controlling Next navigation step Product Cost by Period Next navigation step Planning Next navigation step Preliminary Costing for Product Cost Collector End of the navigation path

  2. The screen Creation of Preliminary Cost Estimates for Product Cost Collectors appears.

  3. Enter data as required.

  4. Choose Start of the navigation path Program Next navigation step Execute End of the navigation path .

Result

The system updates the preliminary cost estimate in accordance with the data you entered in the selection screen.

The reporting point backflushes of the current period are converted.

See also:

For detailed information on conversion with changes reporting point structures, see the following section:

Flexible Reporting Points

For general information on the preliminary costing for product cost collectors, see the following section:

Preliminary Cost Estimates for Product Cost Collectors