Switching from an Info Structure with Monthly Updating to an Info Structure with Daily Updating
When you switch from one information structure that is updated on a monthly basis to an information structure that is updated daily, the period to analyze is calculated as follows:
Period to analyze, initial standard analysis: April 1995 - July 1995
Period to analyze, standard analysis to which you are changing: 1.4.1995 - 31.7.95
Switching from an Info Structure with Monthly Updating to an Info Structure with Weekly Updating
When you switch from one information structure that is updated on a monthly basis to an information structure that is updated weekly, the period to analyze is calculated as follows:
The beginning of the period to analyze should be the week in which the first day of the month occurs. The end of the period to be analyzed should be the week in which the last day of the month occurs.