Start of Content Area

Process documentation Assignment of Personnel Costs to the Receiver Object Locate the document in its SAP Library structure

Purpose

In this data entry scenario, you assign the personnel costs for the working times entered in the time sheet to the receiver object of an activity.

The personnel costs are determined in Payroll. If you enter a confirmation using this scenario, the system does not determine the costs for the activities in Logistics. The receiver object is only debited with the personnel costs.

Use this scenario if you:

This scenario is equivalent to entering cost assignment specifications in Human Resources when processing an attendance or absence, or employee remuneration information.

Prerequisites

Process flow

This graphic is explained in the accompanying text

  1. You enter the receiver object of an activity, and an attendance/absence type or wage type in the time sheet.
  2. In Human Resources, the system writes the information on the receiver object and on working time to the Attendances (2002) or Absences (2001), or EE Remuneration Info (2010) infotypes.
  3. The Payroll component determines the personnel costs for the times.
  4. In Controlling, the receiver object is debited with the personnel costs.

 

 

End of Content Area