Dummy text Work Center View from PP/PP-PI Locate the document in its SAP Library structure

Technical Name:2LIS_04_ARBPL

Technical Data

Type of DataSource

Transaction Data (Movement Data)

Application Component

Production Planning and Control (PP)

Available from OLTP Release

SAP R/3 4.0B

Available from Plug-In Release

PI 2000.1

RemoteCube Compatibility

No

Prerequisites

Activation of the DataSource.

Use

This structure is used to extract transaction data from the manufacturing process, with regards to order operations, as well as work center/operation information consistently to a BW system.

As of SAP R/3 4.0B, this DataSource replaces DataSource 2LIS_04_S281.

Delta Update

A Delta update is supported. Delta process: ABR – Complete delta with deletion indicators using delta queue (Cube-compatible).

Fields of Origin in the Extract Structure

Field in Extract Structure

Description of Field in the Extract Structure

Table of Origin

Field in Table of Origin

AUFNR

Order Number

 

 

BUKRS

Company Code

 

 

FTRMI

Actual Release Date

 

 

KDAUF

Sales Order Number

 

 

MATNR

Material Number

 

 

PWERK

Planning Plant for the Order

 

 

ABRUE

Scheduled Teardown Time

 

 

ARBPL

Work Center

 

 

ARUZE

Unit Teardown Time

 

 

ASVRG

Scrap Quantity Operation

 

 

A_TAB

Output Schedule Deviation

 

 

BEARZ

Scheduled Processing Time

 

 

BEAZE

Unit Processing Time

 

 

BUDAT

Posting Date of Last Confirmation

 

 

DFZEH

Unit Execution Time

 

 

DFZEXEH

Unit Execution Time (Exact)

 

 

FSAVD

Earliest Scheduled Start Time: Execute (Date)

 

 

FSEDD

Earliest Scheduled Finish Time: Execute (Date)

 

 

GMNGA

Entire Lot Size Delivered

 

 

GRUND

Cause of the Deviation

 

 

IADD

Actual Input (Date)

 

 

IEAVD

Actual Finish Time Operation (Date)

 

 

IEDD

Actual Finish Time: Execute (Date)

 

 

ILE01

Unit of Measurement for the 1st Activity to be Confirmed

 

 

ILE02

Unit of Measurement for the 2nd Activity to be Confirmed

 

 

ILE03

Unit of Measurement for the 3rd Activity to be Confirmed

 

 

ILE04

Unit of Measurement for the 4th Activity to be Confirmed

 

 

ILE05

Unit of Measurement for the 5th Activity to be Confirmed

 

 

ILE06

Unit of Measurement for the 6th Activity to be Confirmed

 

 

ISAVD

Actual Operation Start (Date)

 

 

ISDD

Actual Start Time: Execute (Date)

 

 

ISM01

Confirmed Activity, 1st Activity Type

 

 

ISM02

Confirmed Activity, 2nd Activity Type

 

 

ISM03

Confirmed Activity, 3rd Activity Type

 

 

ISM04

Confirmed Activity, 4th Activity Type

 

 

ISM05

Confirmed Activity, 5th Activity Type

 

 

ISM06

Confirmed Activity, 6th Activity Type

 

 

I_ABRUE

Actual Teardown

 

 

I_BEARZ

Actual Processing Time

 

 

I_DFZ

Actual Execution Time

 

 

I_DFZ_EX

Actual Execution Time (Exact)

 

 

I_DLZ

Actual Lead Time

 

 

I_DLZ_EX

Actual Lead Time (Exact)

 

 

I_RUEST

Actual Setup Time

 

 

KABRS

Teardown Target Capacity Requirement for Operation Segment

 

 

KBEAS

Process Target Capacity Requirement for Operation Segment

 

 

KEINH

Unit of Measure for Output of Available Capacity and Capacity Requirement

 

 

KRUES

Setup Target Capacity Requirement for Operation Segment

 

 

LIEGZ

Wait Time Scheduled

 

 

LIGZE

Wait Time Unit

 

 

LMNGA

Entire Lot Size Confirmed

 

 

LOGRP

Wage Group

 

 

MEINH

Operation Units

 

 

MGVRG

Operation Quantity

 

 

PERNR

Personnel Number

 

 

QUALF

Suitability

 

 

RMNGA

Rework Quantity Confirmed Collectively

 

 

RSTZE

Unit Setup Time

 

 

RUEST

Scheduled Setup Time

 

 

R_TAB

Relative Schedule Deviation

 

 

SMNG1

Quantity to be Confirmed for the 1st Activity Type

 

 

SMNG2

Quantity to be Confirmed for the 2nd Activity Type

 

 

SMNG3

Quantity to be Confirmed for the 3rd Activity Type

 

 

SMNG4

Quantity to be Confirmed for the 4th Activity Type

 

 

SMNG5

Quantity to be Confirmed for the 5th Activity Type

 

 

SMNG6

Quantity to be Confirmed for the 6th Activity Type

 

 

SSADD

Latest Target Input (Date)

 

 

SSAVD

Latest Scheduled Start Time: Execute (Date)

 

 

SSEDD

Latest Scheduled Finish Time: Execute (Date)

 

 

S_DFZ

Target Execution Time

 

 

S_DFZ_EX

Target Execution Time (Exact)

 

 

S_DLZ

Target Lead Time

 

 

S_DLZ_EX

Target Lead Time (Exact)

 

 

TRANZ

Move Time Used for Scheduling

 

 

TRAZE

Move Time Unit

 

 

UVORN

Suboperation

 

 

VGE01

Unit of Measurement of the 1st Standard Value

 

 

VGE02

Unit of Measurement of 2nd Standard Value

 

 

VGE03

Unit of Measurement of 3rd Standard Value

 

 

VGE04

Unit of Measurement of 4th Standard Value

 

 

VGE05

Unit of Measurement of 5th Standard Value

 

 

VGE06

Unit of Measurement of 6th Standard Value

 

 

VORNR

Operation Number

 

 

WARTZ

Queue Time Scheduled

 

 

WERKS

Plant

 

 

WTRZE

Queue Time Unit

 

 

XMNGA

Total Scrap Confirmed

 

 

ZGR01

Target Performance Efficiency Rate of 1st Activity Type.

 

 

ZGR02

Target Performance Efficiency Rate of 2nd Activity Type

 

 

ZGR03

Target Performance Efficiency Rate of 3rd Activity Type

 

 

ZGR04

Target Performance Efficiency Rate of 4th Activity Type

 

 

ZGR05

Target Performance Efficiency Rate of 5th Activity Type

 

 

ZGR06

Target Performance Efficiency Rate of 6th Activity Type

 

 

ZMNG1

Target Quantity of 1st Activity Type

 

 

ZMNG1OZ

Target Quantity of 1st Activity Type without Performance Efficiency Rate

 

 

ZMNG2

Target Quantity of 2nd Activity Type

 

 

ZMNG2OZ

Target Quantity of 2nd Activity Type without Performance Efficiency Rate

 

 

ZMNG3

Target Quantity of 3rd Activity Type

 

 

ZMNG3OZ

Target Quantity of 3rd Activity Type without Performance Efficiency Rate

 

 

ZMNG4

Target Quantity of 4th Activity Type

 

 

ZMNG4OZ

Target Quantity of 4th Activity Type without Performance Efficiency Rate

 

 

ZMNG5

Target Quantity of 5th Activity Type

 

 

ZMNG5OZ

Target Quantity of 5th Activity Type without Performance Efficiency Rate

 

 

ZMNG6

Target Quantity of 6th Activity Type

 

 

ZMNG6OZ

Target Quantity of 6th Activity Type without Performance Efficiency Rate

 

 

Z_TAB

Input Schedule Deviation

 

 

ZEITP

Result to which an Update Should Lead

 

 

ROCANCEL

Cancellation of Data Record

BW Enrichment

 

 

 