Work Center View from PP/PP-PI 
Technical Name:2LIS_04_ARBPL
|
Type of DataSource |
Transaction Data (Movement Data) |
|
Application Component |
Production Planning and Control (PP) |
|
Available from OLTP Release |
SAP R/3 4.0B |
|
Available from Plug-In Release |
PI 2000.1 |
|
RemoteCube Compatibility |
No |
Activation of the DataSource.
This structure is used to extract transaction data from the manufacturing process, with regards to order operations, as well as work center/operation information consistently to a BW system.
As of SAP R/3 4.0B, this DataSource replaces DataSource 2LIS_04_S281.
A Delta update is supported. Delta process: ABR – Complete delta with deletion indicators using delta queue (Cube-compatible).
|
Field in Extract Structure |
Description of Field in the Extract Structure |
Table of Origin |
Field in Table of Origin |
|
AUFNR |
Order Number |
|
|
|
BUKRS |
Company Code |
|
|
|
FTRMI |
Actual Release Date |
|
|
|
KDAUF |
Sales Order Number |
|
|
|
MATNR |
Material Number |
|
|
|
PWERK |
Planning Plant for the Order |
|
|
|
ABRUE |
Scheduled Teardown Time |
|
|
|
ARBPL |
Work Center |
|
|
|
ARUZE |
Unit Teardown Time |
|
|
|
ASVRG |
Scrap Quantity Operation |
|
|
|
A_TAB |
Output Schedule Deviation |
|
|
|
BEARZ |
Scheduled Processing Time |
|
|
|
BEAZE |
Unit Processing Time |
|
|
|
BUDAT |
Posting Date of Last Confirmation |
|
|
|
DFZEH |
Unit Execution Time |
|
|
|
DFZEXEH |
Unit Execution Time (Exact) |
|
|
|
FSAVD |
Earliest Scheduled Start Time: Execute (Date) |
|
|
|
FSEDD |
Earliest Scheduled Finish Time: Execute (Date) |
|
|
|
GMNGA |
Entire Lot Size Delivered |
|
|
|
GRUND |
Cause of the Deviation |
|
|
|
IADD |
Actual Input (Date) |
|
|
|
IEAVD |
Actual Finish Time Operation (Date) |
|
|
|
IEDD |
Actual Finish Time: Execute (Date) |
|
|
|
ILE01 |
Unit of Measurement for the 1st Activity to be Confirmed |
|
|
|
ILE02 |
Unit of Measurement for the 2nd Activity to be Confirmed |
|
|
|
ILE03 |
Unit of Measurement for the 3rd Activity to be Confirmed |
|
|
|
ILE04 |
Unit of Measurement for the 4th Activity to be Confirmed |
|
|
|
ILE05 |
Unit of Measurement for the 5th Activity to be Confirmed |
|
|
|
ILE06 |
Unit of Measurement for the 6th Activity to be Confirmed |
|
|
|
ISAVD |
Actual Operation Start (Date) |
|
|
|
ISDD |
Actual Start Time: Execute (Date) |
|
|
|
ISM01 |
Confirmed Activity, 1st Activity Type |
|
|
|
ISM02 |
Confirmed Activity, 2nd Activity Type |
|
|
|
ISM03 |
Confirmed Activity, 3rd Activity Type |
|
|
|
ISM04 |
Confirmed Activity, 4th Activity Type |
|
|
|
ISM05 |
Confirmed Activity, 5th Activity Type |
|
|
|
ISM06 |
Confirmed Activity, 6th Activity Type |
|
|
|
I_ABRUE |
Actual Teardown |
|
|
|
I_BEARZ |
Actual Processing Time |
|
|
|
I_DFZ |
Actual Execution Time |
|
|
|
I_DFZ_EX |
Actual Execution Time (Exact) |
|
|
|
I_DLZ |
Actual Lead Time |
|
|
|
I_DLZ_EX |
Actual Lead Time (Exact) |
|
|
|
I_RUEST |
Actual Setup Time |
|
|
|
KABRS |
Teardown Target Capacity Requirement for Operation Segment |
|
|
|
KBEAS |
Process Target Capacity Requirement for Operation Segment |
|
|
|
KEINH |
Unit of Measure for Output of Available Capacity and Capacity Requirement |
|
|
|
KRUES |
Setup Target Capacity Requirement for Operation Segment |
|
|
|
LIEGZ |
Wait Time Scheduled |
|
|
|
LIGZE |
Wait Time Unit |
|
|
|
LMNGA |
Entire Lot Size Confirmed |
|
|
|
LOGRP |
Wage Group |
|
|
|
MEINH |
Operation Units |
|
|
|
MGVRG |
Operation Quantity |
|
|
|
PERNR |
Personnel Number |
|
|
|
QUALF |
Suitability |
|
|
|
RMNGA |
Rework Quantity Confirmed Collectively |
|
|
|
RSTZE |
Unit Setup Time |
|
|
|
RUEST |
Scheduled Setup Time |
|
|
|
R_TAB |
Relative Schedule Deviation |
|
|
|
SMNG1 |
Quantity to be Confirmed for the 1st Activity Type |
|
|
|
SMNG2 |
Quantity to be Confirmed for the 2nd Activity Type |
|
|
|
SMNG3 |
Quantity to be Confirmed for the 3rd Activity Type |
|
|
|
SMNG4 |
Quantity to be Confirmed for the 4th Activity Type |
|
|
|
SMNG5 |
Quantity to be Confirmed for the 5th Activity Type |
|
|
|
SMNG6 |
Quantity to be Confirmed for the 6th Activity Type |
|
|
|
SSADD |
Latest Target Input (Date) |
|
|
|
SSAVD |
Latest Scheduled Start Time: Execute (Date) |
|
|
|
SSEDD |
Latest Scheduled Finish Time: Execute (Date) |
|
|
|
S_DFZ |
Target Execution Time |
|
|
|
S_DFZ_EX |
Target Execution Time (Exact) |
|
|
|
S_DLZ |
Target Lead Time |
|
|
|
S_DLZ_EX |
Target Lead Time (Exact) |
|
|
|
TRANZ |
Move Time Used for Scheduling |
|
|
|
TRAZE |
Move Time Unit |
|
|
|
UVORN |
Suboperation |
|
|
|
VGE01 |
Unit of Measurement of the 1st Standard Value |
|
|
|
VGE02 |
Unit of Measurement of 2nd Standard Value |
|
|
|
VGE03 |
Unit of Measurement of 3rd Standard Value |
|
|
|
VGE04 |
Unit of Measurement of 4th Standard Value |
|
|
|
VGE05 |
Unit of Measurement of 5th Standard Value |
|
|
|
VGE06 |
Unit of Measurement of 6th Standard Value |
|
|
|
VORNR |
Operation Number |
|
|
|
WARTZ |
Queue Time Scheduled |
|
|
|
WERKS |
Plant |
|
|
|
WTRZE |
Queue Time Unit |
|
|
|
XMNGA |
Total Scrap Confirmed |
|
|
|
ZGR01 |
Target Performance Efficiency Rate of 1st Activity Type. |
|
|
|
ZGR02 |
Target Performance Efficiency Rate of 2nd Activity Type |
|
|
|
ZGR03 |
Target Performance Efficiency Rate of 3rd Activity Type |
|
|
|
ZGR04 |
Target Performance Efficiency Rate of 4th Activity Type |
|
|
|
ZGR05 |
Target Performance Efficiency Rate of 5th Activity Type |
|
|
|
ZGR06 |
Target Performance Efficiency Rate of 6th Activity Type |
|
|
|
ZMNG1 |
Target Quantity of 1st Activity Type |
|
|
|
ZMNG1OZ |
Target Quantity of 1st Activity Type without Performance Efficiency Rate |
|
|
|
ZMNG2 |
Target Quantity of 2nd Activity Type |
|
|
|
ZMNG2OZ |
Target Quantity of 2nd Activity Type without Performance Efficiency Rate |
|
|
|
ZMNG3 |
Target Quantity of 3rd Activity Type |
|
|
|
ZMNG3OZ |
Target Quantity of 3rd Activity Type without Performance Efficiency Rate |
|
|
|
ZMNG4 |
Target Quantity of 4th Activity Type |
|
|
|
ZMNG4OZ |
Target Quantity of 4th Activity Type without Performance Efficiency Rate |
|
|
|
ZMNG5 |
Target Quantity of 5th Activity Type |
|
|
|
ZMNG5OZ |
Target Quantity of 5th Activity Type without Performance Efficiency Rate |
|
|
|
ZMNG6 |
Target Quantity of 6th Activity Type |
|
|
|
ZMNG6OZ |
Target Quantity of 6th Activity Type without Performance Efficiency Rate |
|
|
|
Z_TAB |
Input Schedule Deviation |
|
|
|
ZEITP |
Result to which an Update Should Lead |
|
|
|
ROCANCEL |
Cancellation of Data Record |
BW Enrichment |
|