Prerequisites
You can assign a
pooled capacity to a work centerPooled capacities can only be created independently from the work center in capacity maintenance. If you want to make a work center independent capacity a pooled capacity, set the Pooled capacity indicator in the General data section of the screen and then choose Enter
Procedure
Enter in the required capacity category in the
capacity overview of the work center the name of the pooled capacity.If the