Entering content frame

Procedure documentation Assigning Work Centers to Subsystems Locate the document in its SAP Library structure

Prerequisites

You can transfer work center data to a subsystem (external application) for plant data collection (PDC) by entering the subsystem within work center maintenance.

Procedure

  1. From the Basic Data screen in the work center choose Extras ® Subsystem link.
  2. The dialog box Subsystem grouping is displayed.

  3. Enter the subsystems to which the work center data should be sent.

 

Leaving content frame