You can pass on the following project IMG status information, i.e. pass the status values of a node to all its lower level structure nodes:
You can also delete a status value for all subnodes of a node.
Prerequisites
Status information is maintained for a structure node in the project IMG.
Procedure
Result
The status values are passed on to all lower-level structure nodes.