Start of Content Area

Background documentation Roadmap Steps Locate the document in its SAP Library structure

Each Roadmap Step aggregates Navigation Links, each of which points to exactly one target Roadmap Step.

In addition to the simple Roadmap, where one step has to be executed after the other, the following enhancements are possible:

·        A Roadmap Step may have many Sub-Roadmaps

     It is possible to omit the Review step of the Roadmap and jump directly to the Confirmation Roadmap Step

     Roadmap steps which have already been visited may be selected directly.

The Navigation Links connect the various Roadmap Steps can be classified as one of the following:

     Move to the right (‘Next Step’)

     Move to the left (‘Previous Step’ or one of the previous steps)

     Move down (open Sub-Roadmap)

     Move up (close Sub-Roadmap)

When the Roadmaps are defined with the help of the Structure linkFPM Application Editor, the semantics of the navigation links are used to perform consistency checks on the structure of the Roadmap.

End of Content Area