Entering navigation tree
Entering Level 1 Node Carrying Out the Planning Run (PP-MRP-PR)Carrying Out the Planning Run (PP-MRP-PR)Leaving Level 1 Node Carrying Out the Planning Run (PP-MRP-PR)
   Entering Level 2 Node Control Parameters for the Planning RunControl Parameters for the Planning RunLeaving Level 2 Node Control Parameters for the Planning Run
      Entering Level 3 Node Planning Run Type in the Initial ScreenPlanning Run Type in the Initial ScreenLeaving Level 3 Node Planning Run Type in the Initial Screen
      Entering Level 3 Node Creation IndicatorCreation IndicatorLeaving Level 3 Node Creation Indicator
      Entering Level 3 Node Creation Indicators in the Initial Screen and the MRP GroupCreation Indicators in the Initial Screen and the MRP GroupLeaving Level 3 Node Creation Indicators in the Initial Screen and the MRP Group
      Entering Level 3 Node Planning Mode in the Initial ScreenPlanning Mode in the Initial ScreenLeaving Level 3 Node Planning Mode in the Initial Screen
      Entering Level 3 Node Scheduling Control in the Initial ScreenScheduling Control in the Initial ScreenLeaving Level 3 Node Scheduling Control in the Initial Screen
   Entering Level 2 Node Total PlanningTotal PlanningLeaving Level 2 Node Total Planning
      Entering Level 3 Node Carry Out Total Planning OnlineCarry Out Total Planning OnlineLeaving Level 3 Node Carry Out Total Planning Online
      Entering Level 3 Node Execute Total Planning in Background ModeExecute Total Planning in Background ModeLeaving Level 3 Node Execute Total Planning in Background Mode
      Entering Level 3 Node User Exit: Material Selection for the Total Planning RunUser Exit: Material Selection for the Total Planning RunLeaving Level 3 Node User Exit: Material Selection for the Total Planning Run
      Entering Level 3 Node Parallel ProcessingParallel ProcessingLeaving Level 3 Node Parallel Processing
   Entering Level 2 Node Carrying Out Single-Item, Single-Level PlanningCarrying Out Single-Item, Single-Level PlanningLeaving Level 2 Node Carrying Out Single-Item, Single-Level Planning
   Entering Level 2 Node Single-Item, Multi-Level PlanningSingle-Item, Multi-Level PlanningLeaving Level 2 Node Single-Item, Multi-Level Planning
      Entering Level 3 Node Starting Single-Item, Multi-Level PlanningStarting Single-Item, Multi-Level PlanningLeaving Level 3 Node Starting Single-Item, Multi-Level Planning
      Entering Level 3 Node Working with the Material ListWorking with the Material ListLeaving Level 3 Node Working with the Material List
      Entering Level 3 Node Working with the Planning ResultWorking with the Planning ResultLeaving Level 3 Node Working with the Planning Result
         Entering Level 4 Node Planning with/without Stopping PointsPlanning with/without Stopping PointsLeaving Level 4 Node Planning with/without Stopping Points
      Entering Level 3 Node Simulation ModeSimulation ModeLeaving Level 3 Node Simulation Mode
         Entering Level 4 Node Plan in Simulation ModePlan in Simulation ModeLeaving Level 4 Node Plan in Simulation Mode
   Entering Level 2 Node Interactive PlanningInteractive PlanningLeaving Level 2 Node Interactive Planning
   Entering Level 2 Node Multi-Level, Sales Order PlanningMulti-Level, Sales Order PlanningLeaving Level 2 Node Multi-Level, Sales Order Planning