Manufacturing |
Roles |
Plant Manager |
Plant Manager - Process Manufacturing - Production Analysis |
Plant Manager - Process Manufacturing - Quality Analysis |
MRP Controller |
Supervisor - Repetitive Manufacturing |
Supervisor - Order-Related Production |
Production Director |
Production Director - Process Manufacturing - Production Analysi |
Production Planner - Process Manufacturing - Production Analysis |
Production Planner - Process Manufacturing |
Production Planner - Repetitive Manufacturing |
Production Planner - Order-Related Production |
Shift Manager |
Process Engineer |
Process Engineer - Production Analysis |
Process Engineer - Quality Analysis |
Manager Benchmarking According To SCOR |
Workbooks |
Downtimes/Idle Times by Downtime Elements |
Downtimes by Downtime Categories |
Target/Net Production Times |
Build Cycle Time in Hours ( only for Repetitive Manufacturing) |
Exact Program Run and Execution Times: Request. |
Exact Program Run/ Execution Times: Work Center. |
Ext. Capacity Used, Basis Release Date, Machine Wait Time. |
Ext. Capacity Used, Distributed Requirements (>= 4.0B), Machine |
Ext. Capacity Used, Basis Confirmation Date, Machine Wait Time. |
Material Overhead Cost per Unit of Material Expenditure |
Yield ( Display View for Target/Actual Cost Comparison) |
Queries |
Detailed Order Release Deviations |
Detailed Order Delivery Date Deviations |
Order Quantities |
Order Quantities, Scrap, Planning Version Delay |
Detailed Order Start Date Deviations |
Planning Version Order Times |
Downtimes/Idle Times According to Downtime Elements |
Scrap as Percentage Over Time |
Scrap Analysis - OEE |
Demand/Supply Match Order Lead Time |
Inventory Valuation: Top 10 # Stock Values Without Stock Quantit |
Stock Range of Coverage Over Time (Days' Supply) |
Material Stock Overview |
Stock Overview Over Time |
Build Cycle Time in Hours (Repetitive Manufacturing) |
Downtimes According to Downtime Categories |
Execution Time and Scrap Deviation: Work Center View |
Execution Time Analysis |
Lead Time of Collective Order |
Production Lead Time |
Lead Time and Relative Schedule Deviation: Work Center |
Average Stock Value Over Time |
Average Delay of Manufacturing Process |
Exact Lead/Execution Times: Work Center |
Exact Lead/Execution Times: Order View |
Accuracy in Sales Planning (Re: Confirmed Delivery Quantity) |
Accuracy in Sales Planning (Re: Requested Delivery Quantity) |
Accuracy in the Production Plan |
Total Schedule and Lead Time Deviation: Order View |
Total Schedule Deviation: Order View |
Yield - OEE |
Actual Capacity Utilization |
Actual Activities |
Actual Quantities in the Work Center |
Capacity Load Utilization |
Capacity Load Utilization |
Capacity Utilization for Work Centers |
Capacity Utilization Over Time |
Capacity Load Utilization (Distributed Requirements) |
Capacity Utilization (Distributed Requirements) - Extended |
Capacity Utilization (Distributed Requirements) Over Time |
Capacity Utilization (Distributed Requirements) Work Centers |
Sales Order Quantities of a Single Planning Version |
Sales Order Quantities of Multiple Planning Versions |
Target/Actual Activities |
Target/Actual Activity Deviations |
Delivery Performance Production Data |
Material Overhead Cost per Unit of Material Expenditure |
Material Consumption |
Material Consumption Repetitive Manufacturing |
Target/Actual Material Consumption |
Target/Actual Material Consumption - Extended |
Quantity/Scrap/Lead Time Deviation: Order View |
Negative and Positive Schedule Deviation: Order View |
Open Manufacturing Orders - Number and Quantity |
Open Production Order Stock from the Previous Week |
Overall Equipment Effectiveness |
Performance Analysis - OEE |
Plan Realization |
Plan Realization - Extended |
Production Flexibility |
Production Flexibility - Extended |
Available Resource/Res. Requirements: Single Planning Version |
Available Resource/Res. Requirements: Multiple Planning Versions |
Resource: Setup or Processing Reqmnts of one Planning Version |
Resource: Setup/Processing Reqmnts of Multiple Planning Versions |
Backlog Overview in Production |
Service Level (Work Center or Work Center Group) |
The Case of Delayed Order |
Target/Net Production Times |
Schedule and Scrap Deviation Order View |
Schedule and Lead Time Deviation: Order View |
Schedule and Quantity Deviations Work Center View |
Schedule Deviations: Work Center View |
Availability - OEE |
Comparison of Multiple Planning Versions |
Operation Quantities |
Operation Quantities, Planning Version Scrap |
Operation Times |
Detailed Operation Times |
Goods Receipt Quantity and Scrap |
Goods Receipt Quantity and Scrap Over Time |
Goods Receipt Quantity and Scrap - Extended |
Goods Receipts Repetitive Manufacturing |
Goods Being Processed (Quantity) |
Goods Being Processed (Value) |
Yield (SCOR) |
Performance Efficiency Rate |
InfoCubes |
Special Features when Using PP-PI |
APO Order Assignment/Customer Assignment |
APO Order Data |
APO Resource and Operation Data |
Downtimes |
Capacity Load Utilization |
Period-Specific Order/Material View |
Period-Specific Operation/Work Center View |
Period-Specific Material Consumption |
Plan /Actual Comparison Order/Material View |
Plan/Actual Comparison of Production Quantities |
Plan/Actual Comparison Material Consumption |
Plan/Actual Comparison Operation/Work Center View |
Production Monitoring |
Backlogged Production Orders |
Repetitive Manufacturing Material consumption |
Repetitive Manufacturing / Goods Receipts |
Status of Manufacturing Orders |
ODS Objects |
Collective Order |
Planned Sales Quantities |
Material Prices |
Plan/Actual Comparison for Material |
Work in Process (Quantity) |
Work in Process (Value) |
InfoSources |
Work Center View from PP/PP-PI (from 4.0B) |
Special Features During Shift From PP-PI |
Order Assignment Transaction Data |
Order Transaction Data |
Resource Transaction Data |
Operation Transaction Data |
Resource Downtime |
Production Order Header and Item (to 4.0B) |
Component View from PP/PP-PI (from 4.0B) |
Material View from PP/PP-PI (from 4.0B) |
Material Consumption (to 4.0A) |
Material Consumption in Repetitive Manufacturing (from 4.0B) |
Material Consumption in Repetitive Manufacturing (to 4.0B) |
MRP: Business Info Warehouse |
PP(PI) Work Center Capacity |
Operation Data (to 4.0A) |
Goods Receipts in Repetitive Manufacturing (from 4.0B) |
Goods Receipts Repetitive Manufacturing (to 4.0B) |
Reporting Points in Repetitive Manufacturing (from 4.0B) |
Key Figures |
Deviation of the Account Quantity Delivered in Relation to the A |
+ Release Deviation |
- Release Deviation |
+ Delivery Date Deviation |
- Delivery Date Deviation |
+ Start Deviation |
- Start Deviation |
Standardized Tgt/Act. Deviation of Goods Issue Qty |
Standardized Tgt/Act. Deviation of Goods Issue Qty in percent |
Execution Time Quota in Relation to Lead Time |
Number of Orders from SAP APO |
Number of Collective Orders |
Number of Manufacturing Orders with Correct Final Delivery |
Number of Manufacturing Orders Without Planned Order |
Number of Manufacturing Orders with Too-Early Final Delivery |
Number of Manufacturing Orders with Too-Late Final Delivery |
Number of Overdelivered Manufacturing Orders |
Number of Manufacturing Orders with Underdelivery |
Order Scheduled Completely |
Order Partially Scheduled |
Scrap in Percent |
Scrap in Percent |
Scrap, in Percent |
Build Cycle Time (SCOR) |
Resource Downtime |
End Date/Time of Collective Order |
Exact Actual Execution Time |
Exact Actual Execution Time |
Exact Actual Lead Time |
Exact Actual Lead Time |
Exact Target Execution Time |
Exact Target Execution Time |
Exact Target Lead Time |
Exact Target Lead Time |
Planned Sales Quantities |
Planned Sales Value |
Entire Release Deviation |
Total Delivery Date Deviation |
Total Deviation Start |
EnEntire Actual Activity Total |
Entire Actual Activity |
Entire Target Activity |
Entire Target/Actual Activity Deviation |
Entire Target/Actual Activity Deviation in Percent |
Help Key Figure Downtime Counter |
Actual Execution Time |
Actual Execution Time |
Actual Lead Time |
Actual Lead Time |
Actual Opening Date of Order |
Actual Deviation Quantity in Percent |
Actual Performance Efficiency Rate 1 |
Actual Performance Efficiency Rate 2 |
Actual Performance Efficiency Rate 3 |
Item / Product Changeover Time SCOR |
Capacity Load Utilization |
Correctly Delivered Production Quantity |
Delivery Status of Manufacturing Order |
Machine Wait Time (SCOR) |
Material Overhead Cost per Material Expenditure (SCOR) |
Maximum WIP Factor for Material Withdrawal |
Maximum WIP Factor for Confirmed Operations |
Quantity Reliability |
Planned/Actual + Release Deviation |
Planned/Actual – Release Deviation |
Planned/Actual + Start Deviation |
Planned/Actual – Start Deviation |
Planned/Act. Lead Time Deviation in Percent |
Planned/Actual + Delivery Date Deviation |
Planned/Actual – Delivery Date Deviation |
Planned/Target + Release Deviation |
Planned/Target – Release Deviation |
Planned/Target + Delivery Date Deviation |
Planned/Target – Delivery Date Deviation |
Planned/Target + Start Deviation |
Planned/Target – Start Deviation |
Ratio of Actual to Theoretical Cycle Time (SCOR) |
Relative Target/Actual Schedule Deviation |
Relative Target/Actual Schedule Deviation + |
- Relative Target/Actual Schedule Deviation |
Target Teardown Time |
Target Processing Time |
Target Execution Time |
Target Lead Time |
Target Lead Time |
Target Capacity Load Utilization |
Target Capacity Load Utilization |
Target Capacity Requirements |
Target Capacity Requirements |
Target Capacity Requirements |
Target Wait Time |
Target Goods Receipt Quantity |
Target Setup Time |
Target Transportation Time |
Target Operation Segment |
Target Queue Time |
Target Performance Efficiency Rate 1 |
Target Performance Efficiency Rate 2 |
Target Performance Efficiency Rate 3 |
Target/Actual Scrap Deviation |
Tgt/Act. Execution Time Deviation in Percent |
Target/Actual Lead Time Deviation |
Target/Actual Lead Time Deviation |
Tgt/Act. Lead Time Deviation in Percent |
Target/Actual Finish Deviation |
Target/Actual Deviation Finish + |
Target/Actual – Finish Deviation |
Target/Actual Release Deviation |
Target/Actual + Release Deviation |
Target/Actual – Release Deviation |
Target/Actual Deviation: Activity 1 |
Target/Act. Deviation of Activity 1 in Percent |
Target/Actual Deviation: Activity 2 |
Target/Act. Deviation of Activity 2 in Percent |
Target/Actual Deviation: Activity 3 |
Target/Act. Deviation of Activity 3 in Percent |
Target/Actual Delivery Date Deviation |
Target/Actual + Delivery Date Deviation |
Target/Actual Delivery Date Deviation |
Target/Actual Start Deviation |
Target/Actual Deviation: Start + |
Target/Actual – Start Deviation |
Target/Actual Start Deviation |
Target/Actual Deviation Start + |
Target/Actual – Start Deviation |
Tgt/Act. Deviation of Goods Issue Quantity |
Tgt/Act. Quantity of Goods Issue Deviation in Percent |
Tgt/Act. Deviation of Goods Issue Quantity |
Tgt/Act. Quantity of Goods Issue Deviation in Percent |
Target/Actual Scrap Deviation in Percent |
Start Date/Time of Collective Order |
Status for Creation of Manufacturing Order |
Status for Release of Manufacturing Order |
Status for Start of Manufacturing Order |
Delay in Creation of Manufacturing Order |
Delay in Release of Manufacturing Order |
Delay in Manufacturing Order Delivery |
Delay in Start of Manufacturing Order |
Goods Being Processed (Quantity) |
Work in Process (Value) |
Production Quantity with Early Delivery |
Production Quantity Delivered Too Late |
Overdelivered Production Quantity |
Underdelivered Production Quantity |
Yield (SCOR) |
Time Segment of the Target Execution Time |
APO Available Production Capacity |
APO Order Converted |
APO Order Scrap Quantity |
APO Timely Order Assignment |
APO Delayed Order Assignment |
APO Operation Scrap |
APO Assembly Scrap / % |
APO Processing Time of Reference Operation (Seconds) |
APO Activity Processing Time |
APO Order Processing Time |
APO Customer Requirement Quantity |
APO Product Procurement Costs |
APO Purchase Order Quantity Rounding Value |
APO Order Lead Time |
APO Fixed Lot Size |
APO Free Capacity % |
APO Free Available Capacity in the Period |
APO Latitude |
APO Longitude |
APO Planned Yield - Operation |
APO Total Capacity Requirement % |
APO Entire Available Capacity in the Period |
APO Production Costs |
APO Actual (Confirmed) Quantity Operation |
APO Bucket Resource Capacity |
APO Resource Capacity |
APO Capacity Requirement Production/Waiting |
APO Capacity Requirement Setup/Tear Down |
APO Capacity Split Quantity (Multi-Activity Resource) |
APO Input Node Indicator |
APO Output Node Indicator |
APO Fixed Components |
APO Service Level |
APO Order Wait Time |
APO Maximum Storage Capacity |
APO Maximum Lot Size |
APO Maximum Lot Size PPM |
APO Maximum Overlap of Two Activities |
APO Maximum Stock on Hand - Resource |
APO Reorder Point |
APO Reorder Days' Supply |
APO Minimum Lot Size |
APO Minimum Lot Size PPM |
APO Minimum Resource Replenishment Quantity |
APO Minimum Stock on Hand - Resource |
APO Negative Date Variance for the Sales Order |
APO Rate of Resource Utilization |
APO Open Order Quantity |
APO Open Order Quantity Including Scrap |
APO Open Operation Quantity |
APO Order Output is Fixed |
APO Planned Scrap % |
APO Planned Delivery Time (Days) |
APO Planned Quantity for Operation (Including Scrap) |
APO Planned Quantity Including Scrap/Order (Original Quantity) |
APO Order Planning Type |
APO Positive Date Variance for the Sales Order |
APO Location Priority |
APO Location Product Priority |
APO Product-Dependent Storage Costs |
APO Production Capacity % |
APO Resource-dependent Time Buffer |
APO Confirmed Yield |
APO Activity Set Up Time |
APO Setup Capacity % |
APO Order Setup Time |
APO Shelf Life |
APO Shelf Life Maturity Date |
APO Safety Stock (Product Master) |
APO Status 'Started' |
APO Status 'Deallocated' |
APO Status 'Delivery Completed' |
APO Status 'Finally Confirmed' |
APO Status 'Fixed' |
APO Status 'Released' |
APO Status 'Partially Delivered' |
APO Status 'Partially Confirmed' |
APO Safety Stock Penalty Costs |
APO Total of Capacity Requirements in the Period |
APO Sales Order Date Variance |
APO Underdelivery Tolerance |
APO Overdelivery Tolerance |
APO Consumption of the Handling Capacity in Goods Issue |
APO Consumption of the Handling Capacity in Goods Receipt |
APO Consumption of Warehouse Capacity (SNP) |
APO Consumption of Production Capacity |
APO Order Delay |
APO VMI Promotional Lead Time |
APO Fixed Operation |
APO Operation – Confirmed Scrap |
APO Operation Duration (Gross) |
APO Net Operation Duration |
APO Operation Quantity |
APO Goods Issue Processing Time |
APO Goods Receipt Processing Time |
APO Order Wait Time |
APO WIP Order Duration |
APO WIP Duration % |
APO Target Days' Supply |
APO Operation Counters in the Order |
Characteristics |
Schedule Line Number |
Consignment Indicator |
Subcontracting Indicator |
Header of Leading Manufacturing Order |
Material Number of Leading Order in Collective Order |
Source Location |
Source Location Type |
Item Number for I/O Node |
SAP APO Means of Transport |
Higher-Level Manufacturing Order |
Process Chains |
Process Chain: Initial Data Loading |
Process Chain: Delta Data Loading |
DataSources |
Work Center View from PP/PP-PI |
Resource Downtimes |
Component View from PP/PP-PI |
Component View: Repetitive Manufacturing |
Material View from PP/PP-PI |
Material View Repetitive Manufacturing |
MRP: Business Info Warehouse |
PP(PI) Work Center Capacity |
Reporting Points in Repetitive Manufacturing |