Prerequisites
You have opened an IMG structure in change mode.
An IMG activity can only be inserted below a structure node, or at the same level, below another IMG activity.
Procedure
To insert the IMG activity one level lower, choose Edit ® Node ® Insert IMG activity ® As subnode, or choose the pushbutton.
The name should concisely indicate the IMG activity. This IMG activity name appears in the structure. The ID can be shown in the structure display with Additional information ® Additional information ® Show key ® IMG activity.
IMG activity ID and name example
IMG activity ID: SIMG_CFMENUSAPCOY05, Name: Maintain calendar
You can also insert existing IMG activities in the structure. Click on the Assign other activity icon to the right of the ID input field. Enter the ID of the existing IMG activity or other search criteria in the following dialog box, and choose Search (Continue).
Mark an activity and choose Copy.
An existing IMG activity is already linked to a document, attributes and a maintenance object. This link is retained when you choose the IMG activity.
See also
Organizational activity example: Create calculation rules for averages
Result
You can then assign or create documents, maintain attributes and create a maintenance object.