Plant Maintenance (PM) |
Overview of Plant Maintenance (PM) |
Plant Maintenance |
Technical Objects (CS-BD/PM-EQM) |
Equipment (CS-BD/PM-EQM-FL) |
Functional Locations (CS-BD/PM-EQM-FL) |
Configuration Control |
Object Networking (CS-BD/PM-EQM-ON) |
Maintenance Bills of Material (CS-BD/PM-EQM-BM) |
Additional Functions |
Measuring Points and Counters (CS-IB-MC / PM-EQM-SF-MPC) |
Warranties (CS-AG-WA/PM-EQM-SF) |
Permits (CS-SE/PM-EQM-SF) |
Preventive Maintenance |
Task Lists (CS-AG/PM-PRM-TL) |
Maintenance Planning (CS-AG/PM-PRM-MP) |
Maintenance Processing |
Maintenance Notifications (PM-WOC-MN) |
Orders (CS-SE/PM-WOC-MO) |
Capacity Requirements Planning in Plant Maintenance (PM-WOC-CP) |
Completion Confirmations (CS-SE-CON/PM-WOC-JC) |
Maintenance History (PM-WOC-MH) |
Maintenance Projects |
Project Structure (Plant Maintenance) |
Networks (Plant Maintenance) |
Project Management (Plant Maintenance) |
Budget Planning for Plant Maintenance and Customer Service (MCB) |
Work Clearance Management (PM-WCM) |
Information System |
Reporting |
Planning |
Interface to Logistics Information Library |
Data Collection |
Early Warning System |
Equipment and Technical Objects (PM-EQM) |
Technical Objects (CS-BD/PM-EQM) |
Functional Locations (CS-BD/PM-EQM-FL) |
Functional location |
Reference Functional Location |
Creating a Reference Functional Location |
Copying a Reference Functional Location |
Changing and Displaying a Reference Functional Location |
Activating/Deactivating Reference Functional Locat |
Flagging a Reference Functional Location for Delet |
Structure Indicator |
Creation Functions for Functional Locations |
Creating a Functional Location |
Creating a Functional Location for the Reference Location |
Creating a Functional Location Using a Copy Reference |
Assigning a Superior Functional Location |
Changing and Displaying a Functional Location |
Renaming Functional Locations |
Changing the Maintenance Plant in a Functional Loc |
Activating/Deactivating Functional Locations |
Flagging a Functional Location for Deletion |
Alternative Labeling Systems |
Configuring a Required Labeling System |
Assigning an Alternative Label to a Functional Loc |
Displaying Alternative Labels for a Functional Loc |
Representing the Structure of a Whole System |
Displaying Location Structures |
List Editing for Functional and Reference Function |
Creating Location Master Records Using List Editin |
Creating Similar Structures |
List Editing Using a Copy Reference |
Replacing Location Labels |
List Editing Using a Reference Functional Location |
Consistency Check for Functional Location Data |
Performing a Consistency Check |
Equipment (CS-BD/PM-EQM-FL) |
Equipment |
Creating a Piece of Equipment |
Using List Editing for Equipment |
Changing a Piece of Equipment |
Changing the Maintenance Plant |
Change View Selection |
Displaying an Equipment Master Record |
Activating/Deactivating Equipment |
Flagging a Piece of Equipment for Deletion |
Displaying Usage Times |
Displaying the Structure List and the Structure Gr |
Equipment at Functional Locations |
Installing/Dismantling Equipment from the Function |
Installing Equipment |
Dismantling Equipment |
Replacing Equipment |
Change of the Actual Configuration |
Installing/Dismantling from the Equipment Master R |
Installing Equipment |
Dismantling Equipment |
Exchanging Equipment |
Change of the Actual Configuration |
Hierarchical Equipment Structure |
Hierarchy System for Equipment |
Installing Sub-Equipment in a Piece of Equipment |
Installing Equipment in a Superior Piece of Equipment |
Changing the Equipment Hierarchy |
Changing the Hierarchy in the Superior Equipment Master Record |
Installing Further Sub-Equipment |
Deleting Pieces of Sub-Equipment |
Replacing Sub-Equipment |
Changing the Position Number |
Changing the Hierarchy in the Sub-Equipment Master |
Hierarchy Display for Equipment |
Displaying the Whole Hierarchy |
Displaying the Sub-Equipment Structure of an Indiv |
Production Resources/Tools as Equipment |
Creating Production Resources/Tools as Equipment |
Creating PRT Usage Counters for Equipment |
Releasing/Locking Production Resources/Tools |
Fleet Object as Equipment |
Fleet Management |
Creating a Fleet Object as Equipment |
Calculating the Consumption Data for Vehicles |
Calculating the Consumption Data for Miles per Gallon |
Consumption-Relevant Counter-Reading Recording |
Selection of Vehicles |
Equipment as Units of Tangible Assets |
Allocating Equipment to an Asset |
Synchronizing Fixed Assets and Equipment |
Configuration Data |
Configuring a Piece of Equipment as a Variant |
Copying and Changing an Existing Configuration |
Creating a New Configuration |
Changing an Equipment History |
Event |
Interim Status |
Conversion Log |
Phase 1: Replacing an Actual History with a Target History |
Checks |
Change Documents |
Structure Gaps |
Goods Movements |
Synchronizing Fixed Assets and Equipment |
CRM Coupling |
Phase 2: Create Relationships for Measurement Reading Transfers |
Phase 3: Adjustment of Notifications |
Tips for Changing an Equipment History |
Comparison: Equipment - Functional Location |
Functions of Technical Objects |
Synchronization of Construction Type and Material Number |
Automatic Creation of Equipment Master Records |
Technical Objects Search |
Material Where-Used List |
Multiplying Out Quantities |
Find Material Using Classes |
Find by Replacement Equipment/-Components |
Data Transfer |
Hierarchical Data Transfer |
Horizontal Data Transfer |
Data Transfer By System Rules |
Individually-Defined Data Transfer |
Data Transfer Sequence |
Transferring Data from Dependent Fields |
Transferring Data When Objects are Locked |
Processing the Objects Immediately |
Processing the Objects Later |
Data Transfer for Subsequent Structure Changes |
Data Transfer |
Transferring Data From the Superior Equipment or L |
Transferring Data From Installed Equipment |
Displaying and Changing Data Origin |
Displaying and Changing Data for Locations |
Displaying Data Origin for Locations |
Changing Data Origin for Locations |
Displaying and Changing Data Origin for Equipment |
Displaying Data Origin for Pieces of Equipment |
Classification of Technical Objects |
Creating and Changing Characteristics and Classes |
Classifying Reference Functional Locations |
Classifying Functional Locations |
Classifying Equipment |
Changing the Classification |
Document Management for Technical Objects |
Linking Master Records to Documents |
Displaying Documents |
Creating Multilingual Texts for Technical Objects |
Entering Multilingual Short Texts |
Entering Multilingual Long Texts |
Administrative Information for Technical Objects |
Displaying Administrative Information |
Displaying the Action Log |
Object Information |
Calling up Object Information |
Permit |
Creating Data for the Permit |
Assigning a Permit |
Partner |
Customizing for Partners |
Partner Transfer |
Creating a Partner for the Technical Object |
Status Management |
System Status |
User Status |
Displaying the Status and Transactions Allowed |
Setting a User Status |
Deactivating a User Status |
Flagging Master Records for Deletion |
Deactivating Master Records |
Management of Technical Objects |
Comparison: Structural Display – Product Structure Browser |
Defining a Display Filter |
Creating a Structure |
Processing a Structure |
Showing Environment Data |
Hiding Object Dependencies |
Managing Structural Changes |
Information About Structural Changes |
Configuration Control |
Configuration Control Workbench |
Preparatory Activities for the Configuration Check |
Actual Configuration |
Structure Gaps |
Creating and Deleting Structure Gaps |
Function Identifier |
Creating a Function Identifier |
Linking Equipment with iPPE Access Nodes |
Displaying the Actual Configuration |
Master Parts List |
Cancel-Part Relationships |
Processing Cancel-Part Relationships |
Overall Configuration Check |
Quantity Check |
Performing a Configuration Check |
Configuration Check Log |
Business Add-Ins |
Change of the Actual Configuration |
User-Specific and User-Group-Specific Settings |
Preparatory Activities for Using Part Statuses |
Installation of Equipment |
Installing Equipment with Simultaneous Goods Movement |
Removing Material from Storage Without Updating Hierarchy |
Dismantling of Equipment |
Dismantling Equipment with Simultaneous Goods Movement |
Placing Material into Storage Without Updating Hierarchy |
Movement and Special Stock Types for Installation and Dismantlin |
Exchange of Equipment |
Exchanging Equipment |
Local Configuration Check |
Business Add-Ins |
Object Networking (CS-BD/PM-EQM-ON) |
Types of Object Link |
Object Link Master Record |
Creating an Object Link |
Creating a Link in the Graphic |
Creating Nodes in the Graphic |
Changing an Object Link |
Calling up Change Documents |
Displaying an Object Link |
Selection of Object Links |
Selecting an Object Link |
Evaluation of Object Links |
Object Network Display with Network Breakdown and |
Displaying an Object Network as a Graphic |
Displaying the Object Network in List Form |
Example: Object Network in List Form |
Evaluation of Particular Types of Link |
Displaying Particular Types of Link as a Graphic |
Displaying Particular Types of Link in List Form |
Evaluation of Linked and Link Objects |
Generating a List of Linked Objects |
Generating a List of Link Objects |
Maintenance Bills of Material (CS-BD/PM-EQM-BM) |
Bill of Material (BOM) Categories in Plant Maintenance |
Bill of Material Usage |
Validity of Bills of Material |
Bill of Material Header |
Bill of Material Item |
Creating Bills of Material |
Creating a BOM Using a Reference |
Creating Variant Bills of Material |
Changes to the Bill of Material |
Displaying Change Documents |
Displaying Changes Using the Change Master Record |
Changing Bills of Material |
Changing Variant Bills of Material |
Performing Mass Changes |
Displaying Bills of Material and Variant BOMs |
Displaying Variant Bills of Material |
Displaying a BOM Using the Structural Display |
Evaluation of Bills of Material |
Creating Where-Used Lists |
Allocating a Bill of Material to a Plant |
Changing the Plant Allocation |
Displaying the Plant Allocation |
Measuring Points and Counters (CS-IB-MC / PM-EQM-SF-MPC) |
Measuring Point |
Counter |
Measurement Documents |
Counter-Based Maintenance |
Condition-Based Maintenance |
Customer Exit IMRC0001 |
Calling up Documentation for the Exit |
Entering Measurement and Counter Readings |
 Entering Measurement and Counter Readings in the Internet (PM-EQ |
Entering Measurement and Counter Readings as Barcodes |
Basic Functions |
Creating Measuring Points and Counters |
Creating Measuring Points When Processing a Technical Object |
Creating a Measuring Point Directly |
Creating Counters When Processing a Technical Object |
Creating a Counter Directly |
Classifying a Measuring Point/Counter |
Defining a Measurement Range |
Processing Measuring Points and Counters |
Creating Measurement Documents |
Editing Measurement Documents |
Example for Reversing a Measurement Document |
Additional Functions |
Transfer of Measurement and Counter Readings |
Defining Data for a Measurement/Counter Reading Transfer |
Repeating a Measurement or Counter Reading Transfer |
Defining a Measurement/Counter Reading Transfer for Copied Locat |
Displaying the Transfer Hierarchy for a Key Date |
Generation of Interval Documents |
Working With a Measurement Reading Entry List |
Setting the Total Counter Reading Externally |
Representing Counter Replacement |
Converting Units of Measurement |
Using the Conversion Function |
Consumption-Relevant Counter-Reading Recording |
Graphics for Measurement Documents |
Reference Measuring Points |
Reference Measuring Point |
Working with Reference Measuring Points |
Processing Reference Measuring Points |
Setting and Displaying Functions in the Measuring Point |
Permits (CS-SE/PM-EQM-SF) |
Working with Permits |
Creating, Changing and Deleting a Permit as Master Data |
Assignment of Permits |
Assigning Permits |
Displaying a Permit List |
Changing an Assignment of Permits |
Canceling an Assignment of Permits |
Entering, Issuing and Canceling a Permit |
Warranties (CS-AG-WA/PM-EQM-SF) |
Warranty |
Master Warranty |
Defining a Warranty Counter |
Creating a Master Warranty |
Warranty Management |
Warranty Check |
Warranty Claim Processing (LO-WTY) |
Transactions |
Processes in Warranty Claim Processing |
Processing with Postcrediting/Precrediting |
Processing with Authorized Goodwill |
Processing with Recalls/Technical Campaigns |
Processing with Claim Split |
Processing with Parts to be Returned |
Warranty Check |
Posting in Accounting (FI/CO) |
Grouping of Credit Memos |
Warranty Claim: Header, Version/Category, Item/Item Type |
Processing Warranty Claims |
Warranty Claim: Standard Layout |
Available Screen Groups for Screen Layouts |
Creating Customer-Specific Fields |
Including Customer-Specific Screens in Header Area |
Including Customer-Specific Screens on Tab Pages |
Create Warranty Claim Manually |
Find Warranty Claim |
Archiving |
Mass Processing |
Mass Processing: Security Measures |
Mass Processing: Operations |
Defining and Executing Mass Processing Jobs |
Mass Processing: Customer Exits |
Mass Processing: Logging Messages |
Evaluation of Warranty Claim Data |
Online Reporting |
BW Reporting |
Master Data |
Warranty Objects |
Materials |
Partners |
Partner Profiles |
Master Warranties |
Reference Objects |
Catalogs |
Control |
Warranty Claim Types |
Pricing |
Message Determination |
Revenue Account Determination |
CO Account Determination |
Copying Control |
VSR Checks |
Action Controls |
Actions |
Program Flow when Calling Actions |
Creating and Including Customer-Specific Actions |
Business Add-Ins (BAdIs) |
PM-PCS Interface (PM-EQM-SF-MPC) |
Technical Objects |
Transfer, measurement and counter readings |
Master Data Call via User Interface |
Converting the Object Key |
Implementation |
Notes about the Function Modules |
Function Module MEASUREM_DOCUM_RFC_SINGLE_001 |
Function Module MEASUREM_DOCUM_RFC_SINGLE_002 |
Function Module MEASUREM_POINT_RFC_SINGLE_002 |
Function Module FUNC_LOCATION_RFC_002 |
Data Elements |
Preventive Maintenance (PM-PRM) |
Task Lists (CS-AG/PM-PRM-TL) |
Maintenance Task Lists |
Task List Group |
Equipment Task List |
Task List for Functional Location |
General Maintenance Task List |
Operation |
Sub-Operations |
Internally Processed Operations |
External Processing Operations |
Control Key |
Maintenance Task Lists for Planned Maintenance |
Assignment of a Task List to a Notification |
Number Assignment for Maintenance Task Lists |
Copying Data in Technical Objects |
Creation of a Profile |
Determination of Validity |
Creation of a Maintenance Task List |
Creating Maintenance Task Lists |
Entering Header Data |
Creating a Maintenance Task List Using a Reference |
Creating an Operation |
Entering Detail Data in Operations |
Including User Data in Operations/Sub-Operations |
Creating Ext. Ops. With Service Specification Ref. |
Assigning Maintenance Packages |
Creating a Sub-Operation |
Entering Dates in Sub-Operations |
Including Detail Data in Sub-Operations |
Including User Data in Operations/Sub-Operations |
Documentation of Changes |
Reasons for Documenting Changes |
Changing Maintenance Task Lists |
Displaying the Change Master Record |
Displaying Change Documents |
Processing Maintenance Task Lists |
Printing Maintenance Task Lists |
Changing Maintenance Task Lists |
Assigning Maintenance Packages |
Deletion of Maintenance Task Lists |
Deleting at Maintenance Task List Level |
Setting a Deletion Flag in the Task List Header |
Operation |
Creating an Operation |
Subsequently Entering Operations |
Entering Detail Data in Operations |
Entering QM Data for the Operation |
Including User Data in Operations/Sub-Operations |
Creating Ext. Ops. With Service Specification Ref. |
Deleting Operations/Sub-Operations |
Internal Service Packages for the Operation |
Sub-Operations |
Features of the Sub-Operation |
Creating a Sub-Operation |
Entering Dates in Sub-Operations |
Including Detail Data in Sub-Operations |
Including User Data in Operations/Sub-Operations |
Deleting Operations/Sub-Operations |
Material Components |
Assignment of Material Components |
Assigning Material Components |
Sorting Material Components |
Working With the Structure Graphic |
Displaying Material Where-Used Lists |
Catalog Interface (OCI - Open Catalog Interface) |
Production Resources and Tools |
Creating Material for Production Resources/Tools |
Creating Production Resources/Tools (Other) |
Creating Documents for Production Resources/Tools |
Creating Equipment Production Resources/Tools |
Creating PRTs Using a Reference |
Changing Production Resources/Tools |
Displaying Production Resources/Tools |
Assigning Production Resources/Tools to Operations |
Deleting the Production Resources/Tools Assignment |
Deleting Production Resources/Tools |
Assigning a Deletion Flag to “Material” PRTs |
Deleting Production Resources/Tools (Other) |
Assigning Deletion Flag to “Other“ / “Docu.“ PRTs |
Assigning a Deletion Flag or PRTs “Equipment“ |
Bulk Functions for Work Centers and PRTs |
Pre-Setting Overview Variants |
Creating Where-Used Lists for Production Resources/Tools |
Replacing Production Resources/Tools |
Replacing Work Centers |
Creating Where-Used Lists for Work Centers |
Relationships |
Time Intervals in Relationships |
Prerequisites for Creating Relationships |
Creating Relationships |
Creating a Relationship in the Graphic |
Creating a Relationship in the List |
Creating an Operation in the Graphic |
Changing Relationships |
Displaying Relationships |
Deleting Relationships |
Loop Analysis |
Cost Analysis |
Analyzing Costs |
Creating a Log for Cost Analysis |
Configurable General Maintenance Task Lists |
Configuration Profile |
Creation of Configurable General Maintenance Task Lists |
Creating Configurable General Maintenance Task Lists |
Creating Config. Profile for Gen. Maint. Task List |
Service Packages in Configurable General Maintenance Task Lists |
Maintenance Planning (CS-AG/PM-PRM-MP) |
Maintenance Plan |
Single Cycle Plan and Strategy Plan |
Multiple Counter Plan |
Additional Functions for Multiple Counter Plans (Master Data) |
Maint. Plan with Reference to an Outline Agreement |
Maintenance Plan for Service Procurement |
Maintenance Plan and Sales Document Item |
Example 1: Maintenance Plan |
Example 3: Maintenance Plan |
Example 2: Maintenance Plan |
Process for Maintenance Planning |
Maintenance Plan Type |
Time-Based Maintenance Plan |
Performance-Based Maintenance Plan |
Maintenance Plan Category |
Maintenance Call Object |
Practical Functions and Utilities |
Optimizing the Maintenance Plan |
Worklist for Notifications |
Creating and Processing a Worklist for Notifications |
Deleting of Notifications Including Operations from Order |
Display/Change Operational Assignment of Object List Entries |
Assignment of a Task List to a Notification |
Configurable Equipment as a Reference Object |
Defining a Default Value for a Maintenance Plan Ca |
Sort Field for the Maintenance Plan |
Priority for Maintenance Item |
Automatic Task Determination for Notifications |
Automatic Generation of WCM Objects |
Profile for a General Maintenance Task List |
Creating a Profile for a Maintenance Task List and |
Cycle Set |
Creating a Cycle Set |
Creation of a Maintenance Plan |
Creating a Single Cycle Plan |
Creating a Time-Based Strategy Plan |
Creating a Performance-Based Strategy Plan |
Creating a Multiple Counter Plan |
Creating a Maint. Plan for Service Procurement |
Creating a Maint. Plan for an Outline Agreement |
Processing Maintenance Plans |
Change Documents |
Display of Task List and Packages for Key Date |
Setting a Deletion Flag for Several Maint. Plans |
Creating a Maintenance Item in the Maintenance Plan |
Maintenance Cycle and Maintenance Package |
Creating/Changing Maint. Cycles in MultCntr Plans |
Maintenance Item |
Creating a Maintenance Item in the Maintenance Plan |
Creating a Maintenance Item Without Assignment |
Assigning a Maintenance Item to a Maintenance Plan |
Processing a Maintenance Item |
Changing a Reference Object of a Maintenance Item |
Object List |
Rules for Processing an Object List |
Processing an Object List |
Assignment of Task Lists to a Maintenance Item |
Assigning a Functional Location Task List or Equip |
Creating a Task List from the Maintenance Item |
Assigning a General Maintenance Task List |
Choosing a General Maintenance Task List Using an |
Choosing a General Maintenance Task List Using an |
Choosing a General Maintenance Task List Using Gen |
Maintenance Task Lists |
Change Status of Task Lists and Effect |
Creating a Task List from the Maintenance Item |
Assignment of Task Lists to a Maintenance Item |
Assigning a Functional Location Task List or Equip |
Assigning a General Maintenance Task List |
Choosing a General Maintenance Task List Using an |
Choosing a General Maintenance Task List Using an |
Choosing a General Maintenance Task List Using Gen |
Profile for a General Maintenance Task List |
Creating a Profile for a Maintenance Task List and |
Maintenance Strategy |
Creating a Maintenance Strategy |
Changing a Maintenance Strategy |
Adding Maintenance Packages |
Copying Maintenance Packages |
Reactivating Processed Maintenance Packages |
Deleting a Maintenance Strategy |
Reactivating a Deleted Maintenance Strategy |
Displaying Package Sequence: Maint. Strategy |
Displaying Uses for a Maintenance Strategy |
Scheduling |
Scheduling a Maintenance Plan Automatically |
Additional Functions for Multiple Counter Plans (Scheduling) |
Completion of Call Dates |
Separate Completion of Maintenance Call Dates |
Scheduling Parameters |
Changing the Scheduling Parameters |
Scheduling Indicators |
Time-Based Scheduling |
Scheduling Based on a Key Date |
Scheduling by Factory Calendar |
Performance-Based Scheduling |
Shift Factor |
Tolerance |
Cycle Modification Factor |
Call Horizon |
Scheduling Period |
Completion Requirement |
Preliminary Buffer |
Follow-up Buffer |
Link Type |
Maintenance Package Hierarchy |
Optimizing the Scheduling |
Example Customer Exit IPRM0005 |
Example Customer Exit IPRM0002 (1) |
Example Customer Exit IPRM0002 (2) |
Example Customer Exit IPRM0002 (3) |
Example Function Module MEASUREM_POINT_UPD_PYEAR |
Displaying Maintenance Call Objects |
Displaying Orders or Notifications |
Displaying a Service Entry Sheet |
Displaying Objects for an Outline Agreement |
Scheduling Functions |
First-Time Scheduling |
Scheduling a Time-Based Maintenance Plan for the F |
Scheduling a Performance-Based Maintenance Plan fo |
Scheduling a Multiple Counter Plan for the First T |
Rescheduling |
Restarting Scheduling |
Rescheduling a Maintenance Plan |
Canceling Scheduling |
Starting Scheduling in the Current Cycle |
Creating a Maintenance Call Manually |
Changing the Status of a Call |
Adapting a Planned Date Individually |
Scheduling Overview and Simulation |
Process Scheduling Overview and Simulation |
Calling Up a Call History |
Changing the Status of a Call |
Displaying a Scheduling Algorithm for a Maintenance Call |
Displaying Scheduling Overview or Simulation Directly |
Displaying a Scheduling Overview from the Maintenance Plan |
Displaying a Scheduling Overview Using List Editing |
Maintaining Variants for Scheduling Overview |
Scheduling Overview and Simulation: Simulate Changes |
Scheduling Overview and Simulation: Working with the Graphic |
Scheduling Overview and Simulation: Shift Call in Graphic |
Scheduling Overview and Simulation: Change Call in Graphic |
Maintenance Plan Costing |
Costing Maintenance Plans |
Example of Maintenance Plan Costing |
Status Management |
Displaying Status Information |
Document Flow |
Document selection |
Displaying Document Flow for Notifications or Orders |
Obtaining Maintenance Contract Info from the Document Flow |
Maintenance Order Management (PM-WOC) |
Notifications (CS-CM-SN/PM-WOC-MN) |
Maintenance Notifications (PM-WOC-MN) |
Maintenance Notification |
Malfunction Report |
Maintenance Request |
Activity Report |
User-Specific Notification Types |
Maintenance Processing for Unplanned Tasks |
Service Notifications (CS-CM-SN) |
Service Notification |
Customer Notification |
Activity Report |
Service Request |
User-Specific Notification Types |
Special Functions in the Service Notification |
Entry of Partner Data in a Service Notification |
Transfer of One-Time Customer Data |
Credit Limit Check |
Incoming Calls |
Outgoing Calls |
Task Determination and Notification Monitoring |
Parameters for Task Determination |
Automatic Determination of Tasks |
Example: Automatic Determination of Tasks |
Notification Monitoring |
Monitoring of Response Time |
Service Notifications in the Internet (CS-CM-SN) |
Process Flow (Service Notifications) |
Application Example (Service Notifications) |
Creating, Changing and Displaying a Notification |
Configuration of User Default Values |
Entering a Notification Header Text |
Entering Items |
Data from the Copy Model |
Assignment of a Task List to a Notification |
Cause |
Entering Causes for an Item |
Processing Different Notification Data |
Entering Breakdown Data and Duration |
Specifying a Priority |
Entering Measurement Documents |
Linking a Document from Document Management |
Perform Mass Change |
Displaying the Action Log for a Notification |
Displaying Changes in Notifications |
Displaying an Installed Base from the Notification |
Partner |
Customizing for Partners |
Partner Transfer |
Creating a Partner for the Notification |
Calling Up Partner Information |
Reference Object |
Specifying and Changing Reference Objects |
Calling up Object Information |
Time Zones |
Task |
Entering Tasks |
Status Management for Tasks |
Automatic Determination of Tasks |
Example: Automatic Determination of Tasks |
Follow-Up Actions for Tasks |
Activity |
Entering Activities |
Catalog Profile |
Copying Another Catalog Profile |
Changing the Catalog Profile |
Action Box |
Standard Follow-Up Functions (Activities) |
Standard Follow-Up Functions (Tasks) |
Shop Papers for Notifications |
Settings for Printing Shop Papers |
Delta Printing |
Print Programs and Forms |
Technical Properties of Shop Papers |
Printing and Faxing of Shop Papers |
Printing a Maintenance Notification in Full |
Printing a Notification Item |
Printing/Faxing Shop Papers for Several Notifications |
Faxing Shop Papers |
Viewing the Print Log |
Archiving Shop Papers in ArchiveLink |
Downloading a Notification |
Sending of Short Messages Using Paging |
Sending of Messages Using the Internet and SAPoffice® |
Use of Standard Texts |
Putting Notifications in Process |
Assignment of Notifications to Orders |
Worklist for Notifications |
Creating and Processing a Worklist for Notifications |
Deleting of Notifications Including Operations from Order |
Display/Change Operational Assignment of Object List Entries |
Assignment of a Task List to a Notification |
Creating an Order from a Notification in the Background |
Creating an Order Directly from a Notification |
Assigning an Order to a Notification |
Assigning a Notification to an Order |
Creating a Notification for the Order |
Deleting an Assignment Between Notification and Order |
Postponement of Notifications |
Notification Completion |
Notification History |
Completing a Notification Directly |
Completing a Notification from the Order |
Putting a Notification in Process Again |
Entering Technical Findings |
Deletion of Notifications |
Selection of Notifications |
Execution of Functions for Several Notifications |
Creating an Order for Several Notifications |
Selecting Items, Tasks and Activities |
Displaying the Portfolio |
Calling up Graphics |
Document Flow |
Displaying Document Flow for Notifications or Orders |
Document selection |
Obtaining Maintenance Contract Info from the Document Flow |
Evaluation of Notifications |
Status Management in Notifications |
Displaying a Status |
Assigning System Statuses Automatically |
Setting/Resetting User Status |
Entering Responsibilities (Workflow Connection) |
Orders (CS-SE/PM-WOC-MO) |
Order Types |
Maintenance Order |
Service Order |
Investment Order |
Calibration Order |
Refurbishment Order |
Spare Parts Order |
Order Processing: Internal Processing |
Creation of an Order |
Use of Default Values for the Order |
Creating an Order |
Creating an Order for the Notification |
Creating an Order Directly from a Notification |
Creating an Order and Notification Together |
Detach/Replace Header Notification of Order |
Creating an Order with Different Planning Plant |
Creating an Investment Order |
Creation of a Calibration Order |
Calling Up the Initial Screen for Creating an Order |
Calling Up an Order in Change Mode |
Calling Up an Order in Display Mode |
Worklist for Notifications |
Creating and Processing a Worklist for Notifications |
Deleting of Notifications Including Operations from Order |
Display/Change Operational Assignment of Object List Entries |
Assignment of a Task List to a Notification |
Planning of an Order |
Establishment of Reference Object Data |
Operation |
Use of Operations and Sub-Operations |
Description of the Operations |
Describing an Operation |
Control Key |
Work Center |
Use of Performing Work Centers in the Operation |
Enhanced Work Center Search |
Materials Planning |
Requirements Planning |
Change of Purchase Requisition |
Work Scheduling Using Bills of Material |
Scheduling and Displaying Bill of Material Components |
Find by Replacement Equipment/-Components |
Find Material Using Classes |
Material Where-Used List |
Specifying an Assembly |
Planning Stock Material |
Planning Non-Stock Material |
Planning Variable-Size Items |
Planning Material Using a Description |
Displaying, Changing and Deleting Material |
Personnel Planning |
Settlement Rule |
Creating or Generating a Settlement Rule |
Settlement Receiver |
Object List |
Editing the Object List for an Order |
Display/Change Operational Assignment of Object List Entries |
Scheduling |
Scheduling Data |
Changing Scheduling Data |
Scheduling an Order |
Copying Project Dates as Basic Order Dates |
Displaying and Creating Dates |
Working with Task Lists |
Using Task Lists |
Selecting Operations for a Task List |
Selection of Operations |
Copying Task List Default Values |
Selecting a Task List |
Changing and Displaying a Task List |
Selecting a General Task List |
Assignment of a Task List to a Notification |
Use of Service Specifications |
Procurement Using an External Procurement System |
Transfer a PReq to an External Procurement System |
Catalog Interface (OCI - Open Catalog Interface) |
Costs |
Estimation of Costs |
Estimation of Planned Costs |
Additional Planning Functions |
Use of Relationships |
Relationship |
Networking Orders Using Relationships |
Creating Relationships Using the Graphics Function |
Creating Relationships Using the List Function |
Displaying, Changing and Deleting Relationships |
Creating Operations for Relationships Using the Graphics Functio |
Performing a Loop Analysis |
Shutdown Planning with External Systems |
Order Hierarchy |
Creating and Displaying a Sub-Order |
Use of Order Assignments |
Assignment to Profit Centers |
Assigning an Order to a Revision |
Assigning an Order to a Project |
Assigning an Order to an Investment Program Position |
Assigning an Order to Funds Management |
Assigning an Order to a Real Estate Object |
Assigning an Order to a Joint Venture |
Execution Factor |
Changing an Execution Factor |
Use of User Data |
Entering User Data |
Budget Management |
Use of Production Resources/Tools |
Assigning PRTs to an Operation |
Deleting PRTs from an Operation |
Scheduling PRTs |
Using Quantity Management for PRTs |
Using Status Management for PRTs |
Capacity Planning |
 Capacity Requirements Planning in Customer Service and Plant Mai |
Partner |
Customizing for Partners |
Partner Transfer |
Entering Partner Data |
Control of an Order |
Material Availability Check |
Checking Stock Material Availability |
Availability Check for PRTs |
Checking Availability of PRTs |
Order Release |
Releasing an Order |
Putting an Order in Process |
Loading Order Data from the SAP System to the PC |
Shop Papers for Orders |
Settings for Printing Shop Papers |
Delta Printing |
Print Programs and Forms |
Technical Properties of Shop Papers |
Printing and Faxing of Shop Papers |
Printing Shop Papers |
Printing Shop Papers for Several Orders |
Delta Printing |
Calling Up a Print Preview and Print Log |
Faxing Shop Papers |
Displaying and Archiving Shop Papers |
Sending of Messages Using the Internet and SAPoffice® |
Sending of Short Messages Using Paging |
Use of Standard Texts |
Execution of an Order |
Use of Stock and Non-Stock Material |
Withdrawing Stock Material |
Displaying Goods Movements |
Find by Replacement Equipment/-Components |
Material Where-Used List |
Completion of an Order |
Completing an Order |
Completion Confirmations (CS-SE-CON/PM-WOC-JC) |
Completion Confirmation |
Entry of Completion Confirmations for Orders |
Entry Options |
Overall Completion Confirmation |
Using the Overall Completion Confirmation |
Individual Setting of Overall Completion Confirmation |
Data for the Operation |
Screen Areas for Confirmation Data |
Individual Time Confirmation |
Individual Time Confirmation Using Order/Operation Number |
Individual Time Confirmation Using Confirmation Number |
Individual Time Confirmation for a Standing Order |
Collective Time Confirmation |
Using the Collective Time Confirmation with Selection |
Using the Collective Time Confirmation Without Selection |
Using the Pool Function |
Proposing Actual Data |
Time Sheet |
PDC Systems |
Time Completion Confirmation |
Confirming Time Data |
Entering a Completion Confirmation for Individual Capacities |
Entering General Data on Attendance and Absence |
List Entry of Time and Additional Data in Time Management |
Time collation |
Confirmation of Material Used |
Confirming Material Used |
Entering Used Material in Inventory Management |
Confirmation of Measurement and Counter Readings |
Entering Measurement and Counter Readings |
Confirmation of Installation and Dismantling Information |
Confirming Installation/Dismantling Information |
Goods Receipt for Refurbished Material |
Technical Completion Confirmation |
Entering Notification Data Valid for the Whole Order |
Entering Notification Data Valid for the Order |
Entering Notification Data for an Object in the Object List |
Assigning an Existing Notification and Confirming Data |
When are Notification Screens Ready for Input? |
Operation Notification or Header Notification? |
Confirmation of Services |
Confirming Services |
Confirmation of External Services or External Material |
Cancellation of a Time Completion Confirmation |
Cancelling a Completion Confirmation with Known Number |
Cancelling a Completion Confirmation with Unknown Number |
Mass Cancellation |
Display of Completion Confirmations |
Displaying Completion Confirmations for an Order |
Displaying Completion Confirmations Generally |
Processing of Incorrect Completion Confirmations |
Cost Determination and Display of Actual Costs |
Accounting Indicator in the Completion Confirmation |
Displaying Key Figure Values |
Example of Key Figure Value Display |
Decoupling of the Completion Confirmation Processes |
Resource-Related Billing |
Dynamic Items |
Further Settings for Resource-Related Billing |
Billing Process (CS) |
Resource-Related Billing (CS) |
Billing Scenarios |
Billing - Scenario 1 (CS) |
Billing - Scenario 2 (CS) |
Billing - Scenario 3 (CS) |
Billing - Scenario 4 (CS) |
Billing - Scenario 5 (CS) |
Billing - Scenario 6 (CS) |
Reposting the Accounting Indicator |
Billing Process (PS) |
Billing - Scenario 7 (PS) |
Processing the Expenditure View |
Editing the Sales Price View |
Settings: Sales Pricing and Billing |
Billing Options |
Billing Request |
Creating Billing Requests |
Changing Billing Requests |
Canceling a Billing Request |
Billing Between Company Codes |
Configuration |
Billing Between Company Codes |
Integration of the Billing Plan and the Resource-Related Billing |
Technical Completion of an Order |
Performing a Technical Completion |
Canceling a Technical Completion |
Settlement of an Order |
Settling an Order and Order Group |
Settlement: Example |
Creating an Order Group for the Settlement |
Creating a Selection Variant for Collective Settlement |
Displaying Costs |
Business Completion of an Order |
Performing a Business Completion |
Canceling a Business Completion |
Issuing the System Status “Not Executed” |
Display and Processing of Special Order Data |
Material Where-Used List |
Screen Monitoring with Traffic Light Display |
Display of the Action Log |
Document Flow |
Document selection |
Displaying Document Flow for Notifications or Orders |
Obtaining Maintenance Contract Info from the Document Flow |
System Status for Orders |
Setting a User Status |
Processing Orders Collectively |
Changing and Displaying Order and Operation Lists |
Perform Mass Change |
Order Processing: External Processing |
Processing with an External Company as Work Center |
Processing with an Individual Purchase Order |
Processing with Service Specifications |
Procurement Using an External Procurement System |
Transfer a PReq to an External Procurement System |
Catalog Interface (OCI - Open Catalog Interface) |
Processing Operations Externally |
Order Processing: Refurbishment of Repairable Spares |
Repairable Spare |
Creating a Refurbishment Order |
Posting a Goods Receipt for Refurbished Material |
Posting a Goods Issue for Material to be Refurbished |
Capacity Requirements Planning in Customer Service and Plant Mai |
Capacity Requirements Planning in Customer Service (CS-SE) |
Process for Capacity Requirements Planning in Customer Service |
Reconciliation of Capacity and Scheduling |
Inclusion of External Operations in Scheduling |
Consideration of Shift Breaks When Planning |
Available Capacity Versions in the Work Center |
Consideration of Existing Capacity Loads |
Capacity Load Records for the Production Work Center |
Calling Up The Planning Table |
Creating Employee Requirements Records (Splits) |
Splitting and Scheduling an Individual Operation |
Creating Employee Requirements Records Automatically Using the S |
Changing Employee Requirements Records Created Automatically |
Dispatching of Requirements |
Deallocation of Requirements |
Deallocating Individual Operation Splits in the Order |
Change of the Order |
Display and Change of the Available Capacity |
Graphical Monitor |
Capacity Requirements Planning in Plant Maintenance (PM-WOC-CP) |
Process for Capacity Requirements Planning in Plant Maintenance |
Reconciliation of Capacity and Scheduling |
Inclusion of External Operations in Scheduling |
Consideration of Shift Breaks When Planning |
Available Capacity Versions in the Work Center |
Consideration of Existing Capacity Loads |
Capacity Load Records for the Production Work Center |
Call up the planning table |
Creating Employee Requirements Records (Splits) |
Splitting and Scheduling an Individual Operation |
Let the system create employee requirement records automatically |
Changing Employee Requirements Records Created Automatically |
Dispatching of Requirements |
Deallocation of Requirements |
Deallocating Individual Operation Splits in the Order |
Change of the Order |
Display and Change of the Available Capacity |
Graphical Monitor |
CS-SDL Interface (CS-SE-SD) |
External Scheduling |
External Scheduling in the Order |
External Scheduling in the Completion Confirmation |
External Scheduling in Maintenance Planning |
External Scheduling in the Graphical Monitor |
Notes on Function Modules |
Function Module PM_ORDER_EXTERN_SCHED_DIALOG |
Function Module PM_ORDER_EXTERN_SCHED_DEFAULT |
Function Module PM_ORDER_EXTERN_SCHED_APPOINT |
Function Module PM_ORDER_EXTERN_BOOK_DEFAULT |
Function Module READ_WORKLOAD |
Function Module PM_ORDER_EXTERN_MASTER_DATA |
Scheduling an Order Externally |
Completion Confirmations (CS-SE-CON/PM-WOC-JC) |
Completion Confirmation |
Entry of Completion Confirmations for Orders |
Entry Options |
Overall Completion Confirmation |
Using the Overall Completion Confirmation |
Individual Setting of Overall Completion Confirmation |
Data for the Operation |
Screen Areas for Confirmation Data |
Individual Time Confirmation |
Individual Time Confirmation Using Order/Operation Number |
Individual Time Confirmation Using Confirmation Number |
Individual Time Confirmation for a Standing Order |
Collective Time Confirmation |
Using the Collective Time Confirmation with Selection |
Using the Collective Time Confirmation Without Selection |
Using the Pool Function |
Proposing Actual Data |
Time Sheet |
PDC Systems |
Time Completion Confirmation |
Confirming Time Data |
Entering a Completion Confirmation for Individual Capacities |
Entering General Data on Attendance and Absence |
List Entry of Time and Additional Data in Time Management |
Time collation |
Confirmation of Material Used |
Confirming Material Used |
Entering Used Material in Inventory Management |
Confirmation of Measurement and Counter Readings |
Entering Measurement and Counter Readings |
Confirmation of Installation and Dismantling Information |
Confirming Installation/Dismantling Information |
Goods Receipt for Refurbished Material |
Technical Completion Confirmation |
Entering Notification Data Valid for the Whole Order |
Entering Notification Data Valid for the Order |
Entering Notification Data for an Object in the Object List |
Assigning an Existing Notification and Confirming Data |
When are Notification Screens Ready for Input? |
Operation Notification or Header Notification? |
Confirmation of Services |
Confirming Services |
Confirmation of External Services or External Material |
Cancellation of a Time Completion Confirmation |
Cancelling a Completion Confirmation with Known Number |
Cancelling a Completion Confirmation with Unknown Number |
Mass Cancellation |
Display of Completion Confirmations |
Displaying Completion Confirmations for an Order |
Displaying Completion Confirmations Generally |
Processing of Incorrect Completion Confirmations |
Cost Determination and Display of Actual Costs |
Accounting Indicator in the Completion Confirmation |
Displaying Key Figure Values |
Example of Key Figure Value Display |
Decoupling of the Completion Confirmation Processes |
Work Clearance Management (PM-WCM) |
Architecture |
Standard Model |
Enhanced Model |
Order |
Operations |
WCM Object |
Work Approval |
Application |
Work Clearance Application |
Additional Applications |
Work Clearance Document |
WCD Template |
Operational WCD |
Lockout/Tagout |
Operational Cycle |
Check/Simulation |
Check: Tagged or Untagged |
Check: Completeness and Correctness |
Check: Test Cycle |
Check: Untagging |
Check: Time Frame |
Check: Reference Object |
Check: Conflict |
Conflict Rules |
Operational Protection |
Adjust Untagging |
Clipboard |
List Comparison |
Graphic WCM Planning |
Mobile Processing |
Data Flow |
Assignments |
Approvals |
Partner |
Document |
Catalog |
Reference Object and Object List |
Object Services |
Authorizations |
Electronic Signature |
Printing |
Printing the Work Permit |
Printing Operational Lists |
Printing Operational Tags |
Multiple Usage of Operational Tags |
User-Specific Settings |
List Processing Using Selection Variants |
Order Processing with Work Clearance Management |
Activation of Work Clearance Management for Orders |
Valuation |
Order Processing Without Valuation |
Order Processing with Valuation |
Order Processing with WCM-Relevant Operations |
Automatic Generation of WCM Objects |
Mobile Scenarios |
Mobile Asset Management |
Process: Mobile Asset Management |
Making Settings in Customizing |
Order Processing with Mobile Devices |
Notification Processing with Mobile Devices |
Entering Measurement Readings on Mobile Devices |
Inspection Data Entry |
Stock Processing with Mobile Devices |
Management of Technical Objects |
RFID Integration |
Information System (PM-IS) |
Components of the Logistics Information System (LIS) |
Purchasing Information System |
Purchasing Information System: Information Structu |
Updating: Purchasing Information System |
Events: Purchasing Information System |
Item Categories and Document Types: Purchasing Inf |
Updating Standard Analyses for Long-Term Planning: |
Type of Updating |
Period Units in Updating: Purchasing Information S |
Update of Quantities and Currency Amounts: Purchas |
Updating Check |
Standard Analyses: Purchasing Information System |
Standard Analyses for Long-term Planning: Comparin |
Characteristics and Key Figures: Purchasing Inform |
Purchasing Group |
Vendor, Material Group |
Material |
Vendor Evaluation |
Subsequent Settlement |
Long-term Planning |
How the Key Figures are Calculated: Purchasing Inf |
Quantities/Values |
Frequency |
Quantity Delivered/(Scheduled) Delivery Date Devia |
Key Figures Calculated at Runtime |
Example: Calculating the Value of Goods Received |
Vendor Evaluation |
Smoothed |
Subsequent Settlement |
Subsequent Settlement: Amounts |
Examples: Income Final Settlement / Income Conditi |
Subsequent Settlement: Quantities |
Inventory Controlling |
Inventory Controlling: Information Structures |
Updating: Inventory Controlling |
Events: Inventory Controlling |
Updating Quantities and Currencies: Inventory Cont |
Updating for Standard Analyses: Requirement/Stock |
Period Units in Updating: Inventory Controlling |
Standard Analyses: Inventory Controlling |
Inventory Controlling: Parameters Controlling |
Characteristics and Key Figures: Inventory Control |
Plant/Storage Location/Material/Parameters Control |
Batches |
Standard Analyses to Material Groups |
Standard Analyses on Warehouse Management |
Stock/Requirements - Current and - Long-term Plan |
How the Key Figures are Calculated: Inventory Cont |
Stocks |
Usage |
Receipts |
Issues |
Range of Coverage |
Inventory Turnovers |
Key Figures for Movements |
Key Figures From MRP and Long-Term Planning |
Key Figures for Warehouse Management |
Key Figures for Stock Placement/Removal |
Key Figures for Flow of Quantities |
Inventory Controlling: Detailed Information |
Sales Information System |
Sales Information System: Information Structures |
Updating: Sales Information System |
Events: Sales Information System |
Updating in the Sales Information System |
Factors That Influence Updating: Sales Information |
Period Units in Updating: Sales Information System |
Updating for Configurable Materials |
Special Features of Multi-Level Configurable Mater |
Standard Analyses: Sales Information System |
Characteristics and Key Figures: Sales Information |
Customer, Material |
Sales Organization |
Shipping Point |
Sales Employee |
Sales Office |
Variant Configuration |
How the Key Figures are Calculated: Sales Informat |
Key Figures for Incoming Orders and Returns |
Key Figures for Invoiced Sales and Credit Memos |
Key Figures for Gross/Net1/Net2/Freight/PrSub5/PrS |
Cost |
Open Sales Order Value/Open Sales Order Quantity |
Deliveries on Hand |
Key Figures for Variant Configuration |
Shop Floor Information System |
Shop Floor Information System: Information Structu |
Updating: Shop Floor Information System |
Events: Shop Floor Information System |
Views: Shop Floor Information System |
Conditions: Shop Floor Information System |
Updating for Repetitive Manufacturing Analysis: Sh |
Updating Quantities and Currencies: Shop Floor Inf |
Period Units in Updating: Shop Floor Information S |
Standard Analyses: Shop Floor Information System |
Shop Floor Information System: Gantt Diagram |
Shop Floor Information System: Input/Output Diagra |
Characteristics and Key Figures: Shop Floor Inform |
Work Center |
Operation |
Material |
Production Order |
Material Usage |
Product Costs |
Run Schedule Header |
Reporting Point Statistics |
Kanban |
How the Key Figures are Calculated: Shop Floor Inf |
Calculating Material-Based Key Figures (S021, S023 |
Calculating Work-Center-Based Key Figures (S022, S |
Key Figures for Repetitive Manufacturing (S025/S02 |
Key Figures for Material Usage (S026) |
Key Figures for Product Costs (S027) |
Key Figures for Kanban (S029) |
Number of Status Messages in KANBAN |
Sequence of the Status Changes in KANBAN |
Time Sequence of the Process |
Master Data |
Quantity Control |
Plant Maintenance Information System |
Information Structures |
Updating: Plant Maintenance Information System |
Events |
Update Group: Plant Maintenance Information System |
Updating Currencies: Plant Maintenance Information |
Period Units in Updating: Plant Maintenance |
Standard Analyses: Plant Maintenance |
Characteristics and Key Figures |
Object Class and Manufacturer |
Location |
Planning Group |
Damage analysis |
Object Statistics |
Breakdown Analysis |
Cost Analysis |
Customer notifications |
Vehicle consumption analysis: |
MTTR/MTBR Evaluation |
How the Key Figures are Calculated |
Key Figures for Notifications |
Key Figures for Object Statistics |
Key Figures for Error Statistics |
Key Figures for Damage Description |
Key Figures for Breakdown Statistics |
Key Figures for Order Management |
Key Figures for Order Costs |
Key Figures for Vehicle Consumption Analysis |
Quality Management Information System |
Quality Management Information System: Information |
Updating: Quality Management Information System |
Time of the Update |
Factors That Influence Updating the Information St |
Updating Quantities: Quality Management Informatio |
Period Units in Updating: Quality Management Infor |
Standard Analyses: Quality Management Information System |
Characteristics and Key Figures: Quality Management Information |
Standard Analyses for Lots |
Standard Analyses for Errors |
Standard Analyses for Notifications |
Standard Analyses for Notification Problems |
Standard Analyses for Inspection Results |
How the Key Figures are Calculated: Quality Manage |
Auxiliary and Supplementary Key Figures |
Calculating the Supplementary Key Figures for Information Struct |
Calculating the Supplementary Key Figures for Info |
Calculating the Supplementary Key Figures for Information Struct |
Retail Information System (RIS) |
RIS Information Structures |
Updating - Overview |
Events |
Updating Definition |
Update Groups |
Update Rules |
Updating Control |
Type of Updating |
Period Unit |
Update Check |
Cancellations |
Posting Quantities and Currencies |
POS Interface |
Standard Analyses in RIS |
Procedures in Limit Planning |
Exceptions |
Characteristics and Key Figures |
STRPS |
Purchasing |
Subsequent Settlement |
Article |
Article/Add-On |
Promotion |
Season |
Customer/Merchandise Category |
Customer/Article |
Article Aggregation - POS |
Cashier |
Sales As Per Receipts |
POS Balancing |
Receipt |
Receipt/Article |
Open-To-Buy |
Perishables |
Physical Inventory |
Additionals |
Rough Workload Preview: General Overview |
Rough Workload Estimate: Goods Receipt/Put Away |
Rough Workload Estimate: Customer/Store Returns |
Rough Workload Preview: Picking/Goods Issue |
Rough Workload Preview: Vendor Returns |
Further Selection Criteria |
Abbreviations |
How Key Figures are Calculated |
Key Figures: Purchasing |
Key Figures: Subsequent Settlement |
Income Fin. Settlemt / Cond. Rec'd / Totl Income Cond. Rec'd |
Subsequent Settlement: Quantities |
Subsequent Settlement: Amounts |
Key Figures: Inventory Management |
Key Figures: Sales and Distribution |
Key Figures: Sales Audit |
Key Figures: Market-Basket Analysis |
Key Figures Calculated at Runtime |
Key Figures: Physical Inventory |
Key Figures: Additionals |
Key Figures: Rough Workload Estimate |
Key Figures: Open to Buy |
Transport Information System (TIS) |
Documentation not Available in Release 4.6B |
Updating: TIS |
Events: TIS |
Updating: TIS |
Function Enhancements: TIS |
Factors That Influence Updating: TIS |
Statistics Groups: TIS |
Update Groups: TIS |
Update Type: TIS |
Period Units in Updating: TIS |
Special Features: TIS |
Updating Check: TIS |
Standard Analysis: TIS |
Documentation not Available in Release 4.6B |
Transport |
Documentation not Available in Release 4.6B |
Transport method |
Documentation not Available in Release 4.6B |
Documentation not Available in Release 4.6B |
Documentation not Available in Release 4.6B |
Note on Calculating Key Figures |
Key Figures for Transports |
Key Figures for Deliveries |
Entry-dependent Key Figures |
Average Key Figures |
Updating of Cost and Quantity Key Figures (PM-IS) |
Example: Cost Distribution on Time Axis and in PMIS/SMIS |
Defining Data Elements |
Extending the Communication Structure |
Definition of Field Catalogs and Info. Structures |
Definition of Update Rules |
Defining Update Formulas |
Defining Update Rules for a Formula |
Workflow Scenarios (PM/CS) |
PM/CS - Plant Maintenance & Customer Service: Workflow Scenarios |
Maintenance Notifications (PM-WOC-MN) |
Processing of a Maintenance Notification (PM-WOC-MN) |
Technical Realization (PM-WOC-MN) |
Process for Workflow Template WS20000317 |
Preparation and Customizing (PM-WOC-MN) |
Operation and Link to Application Functions (PM-WOC-MN) |
Completion of a Task (PM-WOC-MN) |
Technical Realization (PM-WOC-MN / Completing a Task) |
Process for Workflow (PM-WOC-MN / Completing a Task) |
Preparation and Customizing (PM-WOC-MN / Completing a Task) |
Operation/Link to Application Functions (PM-WOC-MN/Complete Task |
Processing an Outstanding Maintenance Notification (PM-WOC-MN) |
Technical Realization (PM-WOC-MN / Outstanding Maintenance Notif |
Object Type BUS2038 (Maintenance Notification) |
Standard Task TS00008314 (Process Outstanding PM N |
Workflow Template WS00200065 (PM: Processing a Notification) |
Steps in a Workflow |
Preparation and Customizing (PM-WOC-MN / Outstanding Maintenance |
Processing the Organizational Structure |
Perform Task-Specific Customizing |
Activate Event-Receiver Linkage |
Operation and Link to Application Functionality (P |
Processing an "In Process" Maintenance Notification (PM-WOC-MN) |
Technical Realization (PM-WOC-MN / Maintenance Notification in P |
Object Type BUS2038 (PM Notification) |
Standard Task TS00008314 (PM Task Process Notifica |
Workflow Template WS00200095 (PM: Putting a Notification in Proc |
Steps in a Workflow |
Preparation and Customizing (PM-WOC-MN / Maintenance Notificatio |
Processing the Organizational Structure |
Perform Task-Specific Customizing |
Activate Event-Receiver Linkage |
Operation and Link to Application Functionality (P |
Completing a Maintenance Notification (PM-WOC-MN) |
Technical Realization (PM-WOC-MN / Completing a Maintenance Noti |
Object Type BUS2038 (Maintenance Notification) |
Standard Task TS00008316 (Complete) |
Workflow Template WS00200075 (PM: Completing a Notification) |
Steps in a Workflow |
Preparation and Customizing (PM-WOC-MN / Completing a Maintenanc |
Processing the Organizational Structure |
Perform Task-Specific Customizing |
Activate Event-Receiver Linkage |
Operation and Link to Application Functionality (P |
Maintenance and Service Orders (PM-WOC-MO / CS-SE) |
Purchase Order Change (PM-WOC-MO / CS-SE) |
Technical Realization (PM-WOC-MO / CS-SE) |
Preparation and Customizing (PM-WOC-MO / CS-SE Purchase Order Ch |
Operation & Link to Application Functions (PM-WOC-MO / CS-SE Pur |
Notifying the Order Creator (PM-WOC-MO) |
Technical Realization (PM-WOC-MO / Notiifcation of the Order Cre |
Object Type BUS2007 (Maintenance Order) |
Standard Task TS20000004 (PMO Order Created) |
Standard Task TS20000005 (PMO Order Released) |
Standard Task TS20000006 (PMO Order Completely Con |
Standard Task TS20000007 (PMO Order Technically Co |
Standard Task TS20000031 (Business Completion for |
Workflow Template WS20000021 (PMO Author) |
Scenario Procedure |
Preparation and Customizing (PM-WOC-MO / Notification of Order C |
Processing the Organizational Structure |
Performing Task-Specific Customizing |
Activating Event-Receiver Linkage |
Operation and Link to Application Functionality (P |
Notifying the Employee Responsible (PM-WOC-MO) |
Technical Realization (PM-WOC-MO / Notification of the Employee |
Object Type BUS2007 (Maintenance Order) |
Standard Task TS20000064 (PMO Order is Released by |
Workflow Template WS20000014 (PM: PMO Maintenance Planner) |
Scenario Procedure |
Preparation and Customizing (PM-WOC-MO / Notification of Employe |
Processing the Organizational Structure |
Performing Task-Specific Customizing |
Activate Event-Receiver Linkage |
Operation and Link to Application Functionality (P |
Notifying the Work Centers Involved (PM-WOC-MO) |
Technical Realization (PM-WOC-MO / Notifying the Work Centers In |
Object Type AFVC_PM (Maintenance Order Operation) |
Standard Task TS20000015 (PMO Order Released) |
Standard Task TS20000056 (PMO Operation Completely |
Standard Task TS20000016 (PMO Operation Completely |
Workflow Template WS20000031 (PMO Operation) |
Scenario Procedure |
Preparation and Customizing (PM-WOC-MO / Notification of Work Ce |
Processing the Organizational Structure |
Performing Task-Specific Customizing |
Activate Event-Receiver Linkage |
Operation and Link to Application Functionality (P |
Service Notifications (CS-PM-SN) |
Processing of a Service Notification (CS-CM-SN) |
Technical Realization (CS-CM-SN) |
Process for Workflow Template WS20000318 |
Preparation and Customizing (CS-CM-SN) |
Operation and Link to Application Functions (CS-CM-SN) |
Completion of a Task (CS-CM-SN) |
Technical Realization (CS-CM-SN/ Completing a Task) |
Process for Workflow (CS-CM-SN / Completing a Task) |
Preparation and Customizing (CS-CM-SN / Completing a Task) |
Operation and Link to Application Functions (CS-CM-SN / Completi |
Processing an Outstanding Service Notification (CS-CM-SN) |
Technical Realization (CS-CM-SN/ Outstanding Service Notificatio |
Object Type BUS2080 (Service Notification) |
Standard Task TS00008336 (Process Outstanding Serv |
Workflow Template WS00200096 (Processing a Service Notification) |
Steps in a Workflow |
Preparation and Customizing (CS-CM-SN / Outstanding Service Noti |
Processing the Organizational Structure |
Perform Task-Specific Customizing |
Activate Event-Receiver Linkage |
Operation and Link to Application Functionality (P |
Processing a Service Notification in Process (CS-CM-SN) |
Technical Realization (CS-CM-SN/ Service Notification in Process |
Object Type BUS2080 (Service Notification) |
Standard Task TS00008336 (Process Service Notifica |
Workflow Template WS00200099 (Putting a Service Notification in |
Steps in a Workflow |
Preparation and Customizing (CS-CM-SN / Service Notification in |
Processing the Organizational Structure |
Perform Task-Specific Customizing |
Activate Event-Receiver Linkage |
Operation and Link to Application Functionality (P |
Completing a Service Notification (CS-CM-SN) |
Technical Realization (CS-CM-SN/ Completing a Service Notificati |
Object Type BUS2080 (Service Notification) |
Standard Task TS00008338 (Complete Service Notific |
Workflow Template WS00200098 (Completing a Service Notification) |
Steps in a Workflow |
Preparation and Customizing (CS-CM-SN / Completing a Service Not |
Processing the Organizational Structure |
Perform Task-Specific Customizing |
Activate Event-Receiver Linkage |
Operation and Link to Application Functionality (P |
SAP ArchiveLink - Storage Scenarios PM |
Storage of Outgoing Documents (PM-WOC-MO) |
Business Background (PM-WOC-MO) |
Storage of Incoming Documents (PM-WOC-MO) |
Business Background (PM-WOC-MO) |
Process Flow for Storage for Subsequent Entry (PM-WOC-MO) |
Storage of Incoming Documents (PM-SMA-SC) |
Business Background (PM-SMA-SC) |
Process Flow for Storage for Subsequent Entry (PM-SMA-SC) |
Storage of Outgoing Documents (PM-SMA-SC) |
Business Background (PM-SMA-SC) |
Storage of Incoming Documents (PM-WOC-MN) |
Business Background (PM-WOC-MN) |
Process Flow for Storage for Subsequent Entry (PM-WOC-MN) |
Storage of Outgoing Documents (PM-WOC-MN) |
Business Background (PM-WOC-MN) |
Archive (PM/CS) |
Plant Maintenance and Customer Service (PM/CS) |
 Introduction to Data Archiving (CA-ARC) |
Archiving of Equipment (CS-BD/PM-EQM-EQ) |
Application-Specific Features (CS-BD/PM-EQM-EQ) |
Checks (CS-BD/PM-EQM-EQ) |
Application Customizing (CS-BD/PM-EQM-EQ) |
Dependencies (CS-BD/PM-EQM-EQ) |
Residence Time (CS-BD/PM-EQM-EQ) |
Authorizations (CS-BD/PM-EQM-EQ) |
Calling Up Equipment Archiving (CS-BD/PM-EQM-EQ) |
Displaying Where-Used Lists for Equipment (CS-BD/PM-EQM-EQ) |
Displaying Archived Equipment (CS-BD/PM-EQM-EQ) |
Initial Run Log for Equipment (CS-BD/PM-EQM-EQ) |
Archiving Log for Equipment (CS-BD/PM-EQM-EQ) |
Deletion Program Log for Equipment (CS-BD/PM-EQM-EQ) |
Archiving of Functional Locations (CS-BD/PM-EQM-FL) |
Application-Specific Features (CS-BD/PM-EQM-FL) |
Checks (CS-BD/PM-EQM-FL) |
Dependencies (CS-BD/PM-EQM-FL) |
Residence Time (CS-BD/PM-EQM-FL) |
Application Customizing (CS-BD/PM-EQM-FL) |
Authorizations (CS-BD/PM-EQM-FL) |
Calling Up Functional Location Archiving (CS-BD/PM-EQM-FL) |
Displaying Where-Used Lists for Functional Locations (CS-BD/PM-E |
Performing Matchcode Setup - Functional Locations (CS-BD/PM-EQM- |
Displaying Archived Functional Locations (CS-BD/PM-EQM-FL) |
Initial Run Log for Functional Locations (CS-BD/PM-EQM-FL) |
Archiving Log for Functional Locations (CS-BD/PM-EQM-FL) |
Deletion Program Log for Functional Locations (CS-BD/PM-EQM-FL) |
Archiving of Installed Bases (CS-IB) |
Archiving of Serial Number History (LO-MD-SN) |
Application-Specific Features (LO-MD-SN) |
Checks (LO-MD-SN) |
Application Customizing (LO-MD-SN) |
Dependencies (LO-MD-SN) |
Calling up Serial Number History Archiving (LO-MD-SN) |
Displaying Archived Serial Number Histories (LO-MD-SN) |
Archiving of Measurement Documents (CS-IB-MC/PM-EQM-SF-MPC) |
Application-Specific Features (CS-IB-MC/PM-EQM-SF-MPC) |
Application Customizing (CS-IB-MC/PM-EQM-SF-MPC) |
Dependencies (CS-BD/PM-EQM-SF-MPC) |
Variant Settings for the Initial Run (CS-IB-MC/PM-EQM-SF-MPC) |
Variant Settings for Archiving (CS-IB-MC/PM-EQM-SF-MPC) |
Authorizations (CS-IB-MC/PM-EQM-SF-MPC) |
Calling up Measurement Document Archiving (CS-IB-MC/PM-EQM-SF-MP |
Displaying Deletion Flags (CS-IB-MC/PM-EQM-SF-MPC) |
Displaying Archived Measurement Documents (CS-IB-MC/PM-EQM-SF-MP |
Initial Run Log for Measurement Documents (CS-IB-MC/PM-EQM-SF-MP |
Archiving Log for Measurement Documents (CS-IB-MC/PM-EQM-SF-MPC) |
Archiving Maintenance Notifications (PM-WOC-MN) |
Application-Specific Features (PM-WOC-MN) |
Presettings (PM-WOC-MN) |
Checks (PM-WOC-MN) |
Application Customizing (PM-WOC-MN) |
Dependencies (PM-WOC-MN) |
Residence Time (PM-WOC-MN) |
Authorizations (PM-WOC-MN) |
Calling Up Archiving for Maintenance Notifications (PM-WOC-MN) |
Initial Run Log for Maintenance Notifications (PM-WOC-MN) |
Archiving Log for Maintenance Notifications (PM-WOC-MN) |
Deletion Log for Maintenance Notifications (PM-WOC-MN) |
Archiving of Service Notifications (PM-SMA-SC) |
Application-Specific Features (PM-SMA-SC/PM-WOC-MO) |
Presettings (PM-SMA-SC) |
Checks (PM-SMA-SC) |
Application Customizing (PM-SMA-SC) |
Dependencies (PM-SMA-SC) |
Residence Time (PM-SMA-SC) |
Authorizations (PM-SMA-SC) |
Calling Up Archiving for Service Notifications (PM-SMA-SC) |
Initial Run Log for Service Notifications (PM-SMA-SC) |
Archiving Log for Service Notifications (PM-SMA-SC) |
Deletion Log for Service Notifications (PM-SMA-SC) |
Archiving Maintenance and Service Orders (PM-SMA-SC/PM-WOC-MO) |
Application-Specific Features (PM-SMA-SC/PM-WOC-MO) |
Dependencies (PM-SMA-SC/PM-WOC-MO) |
Technical Data (PM-SMA-SC/PM-WOC-MO) |
Application Customizing (PM-SMA-SC/PM-WOC-MO) |
Setting Deletion Flags/Indicators in the Background - Orders (PM |
Setting Deletion Flags Online - Orders (PM-SMA-SC/PM-WOC-MO) |
Checks (PM-SMA-SC/PM-WOC-MO) |
Authorizations (PM-SMA-SC/PM-WOC-MO) |
Calling up Order Archiving (PM-SMA-SC/PM-WOC-MO) |
Displaying Archived Orders (PM-SMA-SC/PM-WOC-MO) |
Deleting Historical Orders |
Archiving of Task Lists (CS-AG/PM-PRM-TL) |
Application-Specific Features (CS-AG/PM-PRM-TL) |
Technical Data (CS-AG/PM-PRM-TL) |
Checks (CS-AG/PM-PRM-TL) |
Change Statuses of Task Lists (CS-AG/PM-PRM-TL) |
Task Lists with Several Change Statuses (CS-AG/PM-PRM-TL) |
Maintenance Task Lists from Previous SAP Releases (CS-AG/PM-PRM- |
Dependencies (CS-AG/PM-PRM-TL) |
Authorizations (CS-AG/PM-PRM-TL) |
Calling Up Task List Archiving (CS-AG/PM-PRM-TL) |
Deleting Task Lists (CS-AG/PM-PRM-TL) |
Deleting Task Lists Without Archiving (CS-AG/PM-PRM-TL) |
Archiving of Maintenance Plans (CS-AG/PM-PRM-MP) |
Application-Specific Features (CS-AG/PM-PRM-MP) |
Setting or Resetting a Deletion Flag |
Setting a Deletion Flag for Several Maint. Plans |
Variant Settings for the Initial Run (CS-AG/PM-PRM-MP) |
Dependencies (CS-AG/PM-PRM-MP) |
Authorizations (CS-AG/PM-PRM-MP) |
Calling up Maintenance Plan Archiving (CS-AG/PM-PRM-MP) |
Log (CS-AG/PM-PRM-MP) |
Displaying Archived Maintenance Plans (CS-AG/PM-PRM-MP) |
Archiving Work Approvals (PM-WCM) |
Application-Specific Features (PM-WCM) |
Application Customizing (PM-WCM) |
Authorizations (PM-WCM) |
Displaying Archived Work Clearance Management Objects (PM-WCM) |
Archiving Applications (PM-WCM) |
Application-Specific Features (PM-WCM) |
Application Customizing (PM-WCM) |
Authorizations (PM-WCM) |
Displaying Archived Work Clearance Management Objects (PM-WCM) |
Archiving Work Clearance Documents (PM-WCM) |
Application-Specific Features (PM-WCM) |
Application Customizing (PM-WCM) |
Authorizations (PM-WCM) |
Displaying Archived Work Clearance Management Objects (PM-WCM) |
Data Transfer (PM/CS) |
PM/CS - Data Transfer in Plant Maintenance and Customer Service |
PM/CS: Data Transfer |
Cross-Application Time Sheet (CATS) |
Time Recording Scenarios and User Interfaces for the Cross-Appli |
Task Type, Component, and Level |
Example: Distribution of Working Time for One Day |
Example: Recording for Whole Days |
User Interfaces |
CATS classic |
Recording Working Times in CATS classic |
Data Entry View |
The Data Entry View, Release View, and Variable View |
Default Values for Sender Cost Center and Activity Type |
Worklist |
Creation of Personal Templates |
Sorting and Merging of Account Assignment Rows |
Example: Merging of Account Assignment Rows |
Customizing the Data Entry View |
Changing the Data Entry Period |
Displaying the Weekday or Date |
Changing the Position of Columns |
Hiding and Reducing Columns |
Showing and Enlarging Columns |
Saving Your Personal Column Settings |
Data Entry |
Calling CATS classic for One Personnel Number |
Calling CATS classic Single Entry for Several Personnel Numbers |
Calling CATS classic List Entry for Several Personnel Numbers |
Record Working Times |
Resetting Entries |
Copying Rows |
Splitting Rows |
Copying Working Time Attributes from the Previous Period |
Distributing Hours Over Several Days in a Period |
Displaying Days Off |
Copying Information from the Worklist |
Canceling Approved Records |
Changing Rejected Records |
Branching to Trip Costs and Material Withdrawals |
Posting a Material Withdrawal |
Entering Basic Trip Data |
Entry of Additional Information |
Entering a Short Text for a Record |
Entering a Long Text for a Record |
Entering Information on a Confirmation |
System Checks and Messages During Data Entry |
Checking Your Entries |
Processing Errors and Warnings |
Release of Data |
Releasing Data on Saving |
Releasing Data Using the Release View |
Information on Working Times Recorded |
Obtaining Information on Icons and Colors |
Obtaining Information on the Processing Status, Document Number, |
Calling the Variable View |
Displaying the Short Text |
Displaying the Long Text |
Displaying Confirmation Information |
Displaying the Predecessor of a Data Record |
Displaying Detailed Information |
Displaying Detailed Information on Working Time Attributes |
Displaying Follow-on Documents and Outstanding Postings |
Settings and Customizing |
Customizing Settings for Data Entry Profiles |
Prerequisites for Time Sheet Users |
Implementing User Parameters |
Assigning an SAP User ID to a Personnel Number |
CATS regular (ITS) |
Recording Working Times in CATS regular |
Example: Recording Working Times |
Data Entry Screen |
Default Values for Sender Cost Center and Activity Type |
Worklist |
Creation of Personal Templates |
Sorting and Merging of Account Assignment Rows |
Example: Merging of Account Assignment Rows |
Data Entry |
Changing the Data Entry Period |
Selecting a Data Entry Profile |
Finding Working Time Attributes |
Switching Between Weekday Display and Date Display |
Entering Information on a Confirmation |
Entering Clock Times |
Displaying the Processing Status and Rejection Reason |
Copying Data from the Previous Period |
Copying Data from the Worklist |
Data Checks |
Printing Time Sheets |
Settings and Customizing |
Customizing Settings for Data Entry Profiles |
Prerequisites for Time Sheet Users |
Implementing User Parameters |
Assigning an SAP User ID to a Personnel Number |
CATS regular/Record Working Time (Web Dynpro) |
Services for CATS regular (Web Dynpro) |
Example: Recording Working Times |
Default Values for Sender Cost Center and Activity Type |
Worklist |
Creation of Personal Templates |
Sorting and Merging of Account Assignment Rows |
Example: Merging of Account Assignment Rows |
Customizing Settings for Data Entry Profiles |
CATS for service providers |
Recording of Working Times with CATS for Service Providers |
Data Entry Screen |
Global Settings (Customizing) |
Personal Settings (Automatic) |
Personal Settings (Manual) |
Data Entry |
Recording Working Times |
Entering Working Time for Your Own Personnel Number |
Entering Working Time for Other Personnel Numbers |
Entering a Sender Cost Center |
Entry of Detailed Information |
Copying Rows |
Entry of Long Texts |
Undoing Actions |
Utilities |
Infocenter |
My Account Assignments |
Calendar Functions |
History/Worklist Screen Area |
History |
Copying Data Records |
Changing Data Records |
Deleting Data Records |
Document Flow |
Worklist |
Copying Information |
Clipboard |
Displaying Travel Expenses |
Posting a Material Withdrawal |
Default Values for Sender Cost Center and Activity Type |
Data Checks |
Checking Data and Processing Messages |
Release of Data |
Releasing Data in the Clipboard |
Settings |
Prerequisites for Time Sheet Users |
Assigning an SAP User ID to a Personnel Number |
Mobile Time Sheet |
Recording Working Times in Mobile Time Sheet |
Data Entry |
Selecting a Data Entry Period |
Selecting Working Time Attributes |
Using Filters in Picklists |
Creating Personal Templates |
Sorting and Merging of Account Assignment Rows |
Example: Merging of Account Assignment Rows |
Entering Times |
Deleting Times |
Copying or Moving Rows |
Using the Detail View |
Entering Long Texts |
Saving Data |
Data Checks |
Release of Data |
Synchronization |
Handling of Conflicts |
Online/Offline Conflict |
Offline/Offline Conflict |
Error Handling |
Message Processing |
Processing Messages |
Overview: Technical Details |
Approval Process for the Time Sheet |
Deciding on the Approval Process |
Special Approval |
Approval Based on Recorded Working Time Attributes |
Approver Selection |
Applications for Approving Working Times |
Approve Working Times |
General User Interface Functions |
Collective Approval Screen |
Individual Approval Screen |
Connection of the Web Dynpro Applications to the Portal |
Approve Working Times (Report RCATS_APPROVE_ACTIVITIES) |
Approve Working Times and Travel Expenses |
Workflow: Approve Working Times (CATS) |
Standard Task TS31000004: CATS Approval |
Standard Task TS31000006: CATS Approval by Time Administrator |
Standard Task TS31000007: CATS Approval by Supervisor |
Workflow (Out-of-Date): Issuing Approvals (CA-TS) |
Approving Data Using SAP Business Workflow |
Technical Implementation of the SAP Business Workflow for Issuin |
Preparation and Customizing of the Approval Workflow |
Using and Linking to Application Functions |
Transfer of Time Sheet Data to the Target Components |
General Information About Data Transfer to Target Components |
Data Transfer to Multiple Components |
Using Target Hours |
Showing or Hiding Target Hours |
Copying Target Hours |
Documenting Remaining Hours |
Data Transfer to Controlling (CO) |
Transfer to Controlling |
Entry of Statistical Key Figures |
Time Sheets in Cost Object Controlling |
Actual Cost Determination for Time Sheet Hours |
Data Transfer to Plant Maintenance/Customer Service (PM/CS) |
Transfer to Plant Maintenance and Customer Service |
PS/PM/CS: Creating an Index for Table AFRU |
PS/PM/CS: Postprocessing Transferred Data |
Data Transfer to Project System (PS) |
Transfer to Project System |
PS/PM/CS: Creating an Index for Table AFRU |
PS/PM/CS: Postprocessing Transferred Data |
Data Transfer to cProjects |
Recording Working Times for cProjects |
Technical Details for Data Transfer to cProjects |
Data Transfer to Materials Management (MM-SRV) |
Master Data Maintenance for External Employees |
Service Entry with Reference to an Operation |
Data Transfer to Human Resources (HR) |
Transferring Time Data to Human Resources |
Immediate Transfer to HR |
Entry of Attendances and Absences for HR Time Management |
Extended Functions for Users of HR Time Management |
Extended Checks for Users of HR Time Management |
Determining a Different Payment |
Entry of Employee Remuneration Information |
For Users of HR: Cost Accounting Scenarios |
Assignment of Personnel Costs to the Master Cost Center |
Assignment of Personnel Costs to the Receiver Object |
Assignment of Personnel Costs to the Sender |
Activity Allocation Between Master and Sender Cost Center |
Reorganization of Interface Tables |
Reorganizing Interface Tables |
Information System |
Processing Status |
Reports: Information on Time Sheet Data |
Displaying Time Sheet Data |
Displaying Reports |
Display Working Times |
Display Working Times and Tasks |
Display Working Times and Tasks: Display Details |
Displaying Records Using the Document Display Report |
Time Sheet: Time Leveling (RCATSCMP) |
Examples: Checking Time Sheets |
Time Sheet Data Archiving |
Technical Background Information |
The Database Table for the Time Sheet (CATSDB) |
The Interface Tables for the Time Sheet |
Processing Status |
Cancellation of Time Sheet Data |
Example: Recording Attendances for Human Resources |
SAP Enhancements and Business Add-Ins |
Assignment of Authorizations |
Example: HR Authorizations for Entering Data in the Time Sheet |
Single Roles in Plant Maintenance |
Plant Maintenance (PM) |
Processing of Work Centers |
Displaying of Work Centers |
Evaluation of Work Centers |
Data Transfer / Download Structures |
Technical Objects (PM-EQM) |
Processing of Functional Location |
Displaying of Functional Location |
Processing of Reference Location |
Processing of Equipment |
Displaying of Equipment |
Processing of Bill of Material |
Displaying of Bill of Material |
Processing of Production Resources/Tools |
Displaying of Production Resources/Tools |
Processing of Measuring Points |
Displaying of Measuring Points |
Processing of Measurement Reading Entry List |
Displaying of Measurement Reading Entry List |
Processing of Serial Numbers |
Displaying of Serial Numbers |
Processing of Permits |
Processing of Object Links |
Maintenance Processing (PM-WOC) |
Creation of Notification |
Processing of Notification |
Displaying of Notification |
Processing of Order |
Displaying of Order |
Scheduling of Order |
Processing of Historical Orders |
Processing of Refurbishment Order |
Displaying of Historical Orders |
Processing and Canceling of Completion Confirmation |
Displaying of Completion Confirmation |
Postprocessing of Completion Confirmation |
Resource Planning |
Processing of Measurement Documents |
Displaying of Measurement Documents |
Issuing and Displaying of Permits |
Work Management in Plant Maintenance and Customer Service |
Preventive Maintenance (PM-PRM) |
Processing of Maintenance Plans and Revisions |
Scheduling of Maintenance Plans |
Displaying of Maintenance Plans |
Processing of Task Lists |
Displaying of Task Lists |
Information System (PM-IS) |
Performing of Analyses |
Configuration of Information System |
Work Clearance Management (PM-WCM) |
Work Clearance Requester |
Work Clearance Planner |
Information Functions for Work Clearance Management |
Safety Engineer |