Cost Object Controlling (CO-PC-OBJ) |
Cost Object Controlling |
Integration of Cost Object Controlling |
Terminology in Product Cost Controlling |
Sequence of Steps in Cost Object Controlling: Scenario |
Basic Decisions in Cost Object Controlling |
Cost Objects |
Costing Object Controlling from an Accounting Point of View |
Cost Object Controlling: Make-to-Stock Production |
Quantity and Value Flow in Make-to-Stock Production |
Cost Object Controlling: Sales-Order-Related Production |
Cost Analysis in Mass Production on the Basis of Sales Orders |
Cost Analysis in Complex Make-to-Order Production |
Selected Logistical Processes and Cost Objects |
Product Cost by Period or Product Cost by Order? |
Recommendations and Notes for Repetitive Manufacturing Environme |
Master Data of CO in Cost Object Controlling |
Master Data of PP in Product Cost Controlling |
Checking the Production Planning Master Data Before Costing |
Master Data of PP-PI in Product Cost Controlling |
Control Parameters in Cost Object Controlling |
Transfer Prices in Cost Object Controlling |
Transaction Codes in Cost Object Controlling |
Performance in Product Cost Controlling |
Product Cost by Period |
Product Cost Collector |
Product Cost Collector Material/Production Plant/Planning Plant: |
Product Cost Collectors in Sales-Order-Related Production |
Status Management for Product Cost Collectors |
Creating, Changing, and Displaying Product Cost Collectors |
Editing Product Cost Collectors |
Product Cost Collectors: Collective Entry for Repetitive Manufac |
Displaying a List of Product Cost Collectors and CO Production O |
Converting Production Cost Collectors into Product Cost Collecto |
Linking Manufacturing Orders to Product Cost Collectors |
Production Orders in Cost Object Controlling |
Process Orders in Cost Object Controlling |
Production Version in Cost Object Controlling |
Cost Object Hierarchy |
Cost Object Node |
Basic Information on Cost Object Hierarchies |
Examples for Cost Object Hierarchies |
Settlement Rules for Cost Object Hierarchies |
Creation of a Cost Object Hierarchy: Scenario |
Creating, Changing, and Displaying Cost Object Hierarchies |
Using the Fast Entry Function for Cost Object Hierarchies |
Edit Cost Object Hierarchy |
Displaying/Finding Cost Object Hierarchies |
Conversion of Cost Object Hierarchies |
Production Process |
Creating a Production Process for a Cost Object Hierarchy |
Controlling Level |
Special Requirements in Joint Production |
Product Cost by Period: Scenario |
Overhead |
Applied Overhead |
Costing Sheet |
Overhead Key |
Process Costs |
Template |
Process Cost Planning |
Preliminary Costing of Product Cost Collectors |
Creating Preliminary Cost Estimates for Product Cost Collectors |
Itemization |
Costed Multilevel BOM |
Message Logs |
Editing and Printing the Log |
User-Defined Error Management in Cost Object Controlling |
Displaying Messages of User-Defined Error Management |
Updating the Preliminary Cost Estimate |
Actual Costs in Cost Object Controlling |
Reposting Costs and Revenues Manually |
Reposting Line Items |
Time Sheets in Cost Object Controlling |
Direct Activity Allocation |
Reposting Internal Activity Allocation |
Entering Sender Activities |
Manual Actual Price |
Manual Cost Allocation |
Entering Statistical Key Figures |
Reporting Point Backflush in Repetitive Manufacturing |
Valuation with Reporting Point Backflushes |
Flexible Reporting Points |
Updating the Preliminary Cost Estimate |
Goods Receipts in Cost Object Controlling |
Transfer of External CO Actual Transaction Data to the SAP Syste |
Transferring Data |
Postprocessing The Data Transfer |
Reversing The Data Transfer |
Data Transfer Log |
Period-End Closing in Product Cost by Period |
Period-End Closing for Product Cost Collectors |
Period-End Closing for Cost Object Hierarchies Without Distribut |
Period-End Closing for Cost Object Hierarchies With Distribution |
Schedule Manager (CA) |
Individual Functions of the Schedule Manager |
Using the Scheduler |
Task List |
Task Types |
Creating a Task List |
Inserting Tasks/Task Groups into the Task List |
Storing Task Documentation |
Scheduling Tasks in the Daily Overview |
Using the Monitor |
Using the Flow Definition |
Creating a Flow Definition |
Flow Step Types |
Multilevel Worklist |
Multilevel Worklist: Process Flow |
Monitor - Working with the Object List |
Processing Worklists |
Processing Status of Objects |
Scenarios for the Schedule Manager |
Starting Transactions/Reports Online, Scheduling/ Monitoring Job |
Starting Transactions/Reports Online, Scheduling Jobs/Job Chains |
Starting Transactions/Reports Online, Scheduling Jobs and Job Ch |
Template Allocation in Actual |
Template-Allocation for Cost Objects |
Template for Cost Objects and Costing |
Assigning Templates for Cost Objects and Calculations |
Performing Template Allocation |
Revaluation at Actual Prices |
Revaluating at Actual Prices |
Actual Cost Distribution in Cost Object Hierarchies |
Target Cost Versions in Actual Cost Distribution |
Example for Actual Cost Distribution |
Distributing Actual Costs in a Cost Object Hierarchy |
User-Defined Error Management in Cost Object Controlling |
Displaying Messages of User-Defined Error Management |
Actual Overhead in Cost Object Controlling |
Calculating Overhead |
Preliminary Settlement for Co-Products, Rework |
Preliminary Settlement for Co-Products |
Preliminary Settlement of Rework |
Performing Preliminary Settlement for Co-Products, Rework |
Apportionment Structure |
Maintaining the Apportionment Structure in the Material Master R |
Source Structure |
Example: Preliminary Settlement and Settlement in Joint Producti |
Work in Process in Product Cost by Period |
Example: Value Flow with Work in Process at Target Costs |
Example for Work in Process That Can Be Capitalized |
Example for Reporting Point Backflush and Work in Process |
Checking the Results Analysis Key in Product Cost by Order or Pe |
Changing the Cutoff Period |
Calculating Work in Process |
User-Defined Error Management in Cost Object Controlling |
Displaying Messages of User-Defined Error Management |
Variance Calculation |
Types of Variance Calculation |
Variance Categories |
Scrap Variance |
Addendum: Scrap in Product Cost Controlling |
Target Cost Versions in Variance Calculation |
Calculation of Target Costs |
Calculation of Control Costs |
Variances with a Valuated Sales Order Stock |
Variance Calculation: Process Flow |
Example for Variance Calculation |
Periodic Variance Calculation: Value Flow |
Calculating Variances |
User-Defined Error Management in Cost Object Controlling |
Displaying Messages of User-Defined Error Management |
Settlement in Product Cost by Order or Period |
Distribution Rule |
Interaction Between Settlement and Material Master |
Example for Settlement in Case of Stock Shortage |
Example for Settlement of Scrap |
User-Defined Error Management in Cost Object Controlling |
Settlement of Cost Object Hierarchies: Scenario |
Example for Settlement Without Actual Cost Distribution |
Defining Settlement Rules for Cost Object Hierarchies |
Displaying a New Distribution Rule for a Cost Object Hierarchy |
Performing Settlement |
Separation of Value Calculation from Goods Movements: Effects on |
Reorganization of Product Cost Collectors |
Archiving Cost Object Hierarchies |
Cost Object Controlling: Information System |
Key Figures in Cost Object Controlling |
Cost Analysis |
Information System for Product Cost by Period |
Key Figures in Product Cost by Period |
Summarized Analysis |
Background Information on Summarized Analysis |
Differences in the Summarization Methods |
Product Drilldowns |
Product Groups in Product Drilldowns |
Creating a CO Product Group |
Data Collection for Product Drilldown |
Collecting Data for a Product Drilldown |
Variance Analysis |
Target / Actual / Production Variances |
Target / Actual Comparison |
Variance Categories |
Work in Process |
Actual Costs |
Summarization Hierarchies |
Maintain Summarization Hierarchies |
Function Module Exits for Summarization |
Maintaining Texts for Summarization Objects |
Data Collection for Summarization Hierarchy |
Executing Data Collection for Summarization Hierarchy |
Cost Object Hierarchy |
Cost Object Hierarchies in the Information System |
Collecting Data for a Cost Object Hierarchy |
Object Lists |
Order Selection |
Selection Parameters for Order Selection |
Display Fields in the Results List |
Order Hierarchy and Order Selection with Classification |
Overview of Summarization Hierarchies |
Overview of Cost Object Hierarchies |
Displaying/Finding Cost Object Hierarchies |
Detailed Reports |
Detailed Reports on Product Cost Collectors |
Cost Object Hierarchy: Detailed Reports for Data Entry Objects |
Object Comparisons |
Order vs. Order Plan/Actual Comparison |
Summarization Hierarchies: Plan / Actual Comparison |
More Reports: Line Items |
Product Cost by Order |
Cost Objects in Product Cost by Order |
Production Orders in Cost Object Controlling |
Production Orders Without Quantity Structure |
Creating a Production Order Without a Quantity Structure |
Displaying a List of Product Cost Collectors and CO Production O |
Process Orders in Cost Object Controlling |
Collective Order |
Collective Orders with Automatic Goods Movements |
Collective Orders with Automatic Goods Movements: Scenario |
Collective Orders Without Automatic Goods Movements |
Collective Orders Without Automatic Goods Movements: Scenario |
Viewing the Settlement Hierarchy for a Collective Order Without |
Product Cost by Order: Scenario |
Example for Product Cost by Order |
Special Requirements in Joint Production |
Planning and Analysis of Campaign Costs |
Rework in Cost Object Controlling |
Order Split in Cost Object Controlling |
System Activities When a Manufacturing Order Is Created |
Overhead |
Applied Overhead |
Costing Sheet |
Overhead Key |
Process Costs |
Template |
Process Cost Planning |
Preliminary Costing of Manufacturing Orders |
Creating a Preliminary Cost Estimate for a Manufacturing Order |
User-Defined Error Management in Cost Object Controlling |
Displaying Messages of User-Defined Error Management |
Preliminary Costing of CO Production Orders |
Unit Costing |
Creating a Preliminary Cost Estimate for a CO Production Order |
Actual Costs in Cost Object Controlling |
Releasing Manufacturing Orders |
Reposting Costs and Revenues Manually |
Reposting Line Items |
Time Sheets in Cost Object Controlling |
Direct Activity Allocation |
Reposting Internal Activity Allocation |
Entering Sender Activities |
Manual Actual Price |
Manual Cost Allocation |
Entering Statistical Key Figures |
Goods Receipts in Cost Object Controlling |
Viewing Actual Costs in Manufacturing Orders |
Transfer of External CO Actual Transaction Data to the SAP Syste |
Transferring Data |
Postprocessing The Data Transfer |
Reversing The Data Transfer |
Data Transfer Log |
Period-End Closing in Product Cost by Order: Scenario |
Schedule Manager (CA) |
Individual Functions of the Schedule Manager |
Using the Scheduler |
Task List |
Task Types |
Creating a Task List |
Inserting Tasks/Task Groups into the Task List |
Storing Task Documentation |
Scheduling Tasks in the Daily Overview |
Using the Monitor |
Using the Flow Definition |
Creating a Flow Definition |
Flow Step Types |
Multilevel Worklist |
Multilevel Worklist: Process Flow |
Monitor - Working with the Object List |
Processing Worklists |
Processing Status of Objects |
Scenarios for the Schedule Manager |
Starting Transactions/Reports Online, Scheduling/ Monitoring Job |
Starting Transactions/Reports Online, Scheduling Jobs/Job Chains |
Starting Transactions/Reports Online, Scheduling Jobs and Job Ch |
Template Allocation in Actual |
Template-Allocation for Cost Objects |
Template for Cost Objects and Costing |
Assigning Templates for Cost Objects and Calculations |
Performing Template Allocation |
Revaluation at Actual Prices |
Revaluating at Actual Prices |
Actual Overhead in Cost Object Controlling |
Calculating Overhead |
Preliminary Settlement for Co-Products, Rework |
Preliminary Settlement for Co-Products |
Preliminary Settlement of Rework |
Performing Preliminary Settlement for Co-Products, Rework |
Apportionment Structure |
Maintaining the Apportionment Structure in the Material Master R |
Source Structure |
Example: Preliminary Settlement and Settlement in Joint Producti |
Work in Process in Product Cost by Order |
Example: Value Flow with Work in Process at Actual Costs |
Example for Work in Process That Can Be Capitalized |
Checking the Results Analysis Key in Product Cost by Order or Pe |
Changing the Cutoff Period |
Calculating Work in Process |
WIP Calculation Using the Object Class |
User-Defined Error Management in Cost Object Controlling |
Variance Calculation |
Types of Variance Calculation |
Variance Categories |
Scrap Variance |
Addendum: Scrap in Product Cost Controlling |
Target Cost Versions in Variance Calculation |
Calculation of Target Costs |
Calculation of Control Costs |
Variances with a Valuated Sales Order Stock |
Variance Calculation: Process Flow |
Example for Variance Calculation |
Calculating Variances |
User-Defined Error Management in Cost Object Controlling |
Displaying Messages of User-Defined Error Management |
Settlement in Product Cost by Order or Period |
Distribution Rule |
Interaction Between Settlement and Material Master |
Example for Settlement in Case of Stock Shortage |
Example for Settlement of Scrap |
User-Defined Error Management in Cost Object Controlling |
Performing Settlement |
Separation of Value Calculation from Goods Movements: Effects on |
Reorganization of Manufacturing Orders |
Archiving of Settlement Documents |
Cost Object Controlling: Information System |
Key Figures in Cost Object Controlling |
Cost Analysis |
Information System for Product Cost by Order |
Key Figures in Product Cost by Order |
Summarized Analysis |
Background Information on Summarized Analysis |
Differences in the Summarization Methods |
Summarization Hierarchies |
Maintain Summarization Hierarchies |
Function Module Exits for Summarization |
Maintaining Texts for Summarization Objects |
Data Collection for Summarization Hierarchy |
Executing Data Collection for Summarization Hierarchy |
Product Drilldowns |
Product Groups in Product Drilldowns |
Creating a CO Product Group |
Data Collection for Product Drilldown |
Collecting Data for a Product Drilldown |
Variance Analysis |
Target / Actual / Production Variances |
Target / Actual Comparison |
Plan / Actual Comparison |
Variance Categories |
Work in Process |
Planned Costs |
Actual Costs |
Object Lists |
Order Selection |
Selection Parameters for Order Selection |
Display Fields in the Results List |
Order Hierarchy and Order Selection with Classification |
Overview of Summarization Hierarchies |
Detailed Reports |
Detailed Reports for Orders |
Collective Orders in the Information System |
Object Comparisons |
Material Cost Estimate vs. Preliminary Order Cost Estimate |
Order vs. Order Plan/Actual Comparison |
Summarization Hierarchies: Plan / Actual Comparison |
More Reports: Line Items |
Product Cost by Sales Order |
Sales Order Items That Carry Costs and Revenues |
Valuated Sales Order Stock |
Update of Valuated Sales Order Stock |
Standard Price with Valuated Sales Order Stocks |
Viewing Valuated Special Stocks |
Example for Valuated Sales Order Stock Without Product Cost by S |
Product Cost Collectors in Sales-Order-Related Production |
Variances with a Valuated Sales Order Stock |
Product Cost by Sales Order: Scenario |
Example for Product Cost by Sales Order with Valuated Sales Orde |
Special Case: Nonvaluated Sales Order Stock |
Nonvaluated Sales Order Stock: Valuation |
Nonvaluated Sales Order Stock: Scenario |
Example: Nonvaluated Sales Order Stock |
Nonvaluated Sales Order Stock: Constraints |
General Information on Nonvaluated Sales Order Stocks |
Checklist for Cost Object Controlling with Sales-Order-Related P |
Control of Requirements Type Determination |
Checking the Requirements Type in the Sales Order |
System Activities When a Sales Order Is Created |
Checking the Sales Order Item |
Overhead |
Applied Overhead |
Costing Sheet |
Overhead Key |
Process Costs |
Template |
Process Cost Planning |
Overhead in Sales-Order-Related Production |
Calculation of Planned Values in Product Cost by Sales Order |
Revenue Planning |
Viewing Conditions and Condition Types |
Sales Order Costing |
Product Cost Estimates for Sales Order Items |
Manually Creating a Product Cost Estimate for a Sales Order Item |
Unit Cost Estimates for Sales Order Items |
Unit Costing |
Creating a Unit Cost Estimate for a Sales Order Item |
Postprocessing of Product Cost Estimates with Unit Costing |
Modifying a Product Cost Estimate with Unit Costing |
Order BOM Cost Estimates |
Creating and Marking an Order BOM Cost Estimate |
Mass Costing for Sales Document Items |
Planned Costs in Variant Manufacturing |
Simulating a Cost Estimate (Configuration Simulation) |
Standard Cost Estimate for Configurable Material |
Update of Planned Costs |
Itemization |
Costed Multilevel BOM |
Message Logs |
Editing and Printing the Log |
User-Defined Error Management in Cost Object Controlling |
Displaying Messages of User-Defined Error Management |
Actual Costs and Funds Commitments in Product Cost by Sales Orde |
Commitments |
Actual Costs in Cost Object Controlling |
Actual Costs in Product Cost by Sales Order: Scenario |
Reposting Costs and Revenues Manually |
Reposting Line Items |
Time Sheets in Cost Object Controlling |
Direct Activity Allocation |
Reposting Internal Activity Allocation |
Entering Sender Activities |
Manual Actual Price |
Manual Cost Allocation |
Entering Statistical Key Figures |
Reporting of Funds Commitments in Inventory |
Actual Revenue in Product Cost by Sales Order |
Transfer of External CO Actual Transaction Data to the SAP Syste |
Transferring Data |
Postprocessing The Data Transfer |
Reversing The Data Transfer |
Data Transfer Log |
Period-End Closing in Product Cost by Sales Order: Scenario |
Schedule Manager (CA) |
Individual Functions of the Schedule Manager |
Using the Scheduler |
Task List |
Task Types |
Creating a Task List |
Inserting Tasks/Task Groups into the Task List |
Storing Task Documentation |
Scheduling Tasks in the Daily Overview |
Using the Monitor |
Using the Flow Definition |
Creating a Flow Definition |
Flow Step Types |
Scenarios for the Schedule Manager |
Starting Transactions/Reports Online, Scheduling/ Monitoring Job |
Starting Transactions/Reports Online, Scheduling Jobs/Job Chains |
Template Allocation in Actual |
Template-Allocation for Cost Objects |
Template for Cost Objects and Costing |
Assigning Templates for Cost Objects and Calculations |
Performing Template Allocation |
Revaluation at Actual Prices |
Revaluating at Actual Prices |
Single-Level Worklists in Product Cost by Sales Order |
Actual Overhead in Cost Object Controlling |
Calculating Overhead |
Single-Level Worklists in Product Cost by Sales Order |
Using the Single-Level Worklist of Overhead Calculation |
Results Analysis |
Status Codes in Results Analysis |
Setting the Status for a Sales Order Item |
Results Analysis Methods |
Assignment of Results Analysis Methods to Objects |
(01) Revenue-Based Method with Profit Realization |
(02) Revenue-Based Method Without Profit Realization |
(03) Cost-Based POC Method |
(04) Quantity-Based Method |
(05) Quantity-Based POC Method |
(06) POC Method on Basis of Revenue Planned by Period |
(07) POC Method Using Progress Version |
(08) COS from “Old” Resource-Related Billing |
(09) Completed Contract Method |
(10) Inventory Determination, Without Planned Costs, Without Mil |
(11) Inventory Determination, Without Planned Costs, With Milest |
(12) Inventory Determination, Reserves for Follow-Up Costs, With |
(13) Inventory Determination “WIP at Actual Costs” |
(14) COS from Resource-Related Billing of Dynamic Items |
(15) Revenue from Resource-Related Billing and Simulation of Dyn |
Changing the Cutoff Period |
Performing Results Analysis |
Results Analysis in Dependency on the Sales Order Structure |
Manual Changes to Automatic Results Analysis Data |
Legacy Data Transfer / Manual Entry of Results Analysis Data |
Entering Results Analysis Data Manually |
Manual Entry of the Cost of Sales |
Entering the Cost of Sales Manually |
Deleting Results Analysis Data |
Single-Level Worklists in Product Cost by Sales Order |
Using the Single-Level Worklist of Results Analysis |
User-Defined Error Management in Cost Object Controlling |
Displaying Messages of User-Defined Error Management |
Settlement of Sales Order Items |
Settlement of Results Analysis Data to CO-PA |
Settlement of Results Analysis Data to FI and EC-PCA |
Performing Settlement |
Commitment Carryforward at Year-End Closing |
Carrying a Commitment Forward |
Cost Object Controlling: Information System |
Key Figures in Cost Object Controlling |
Cost Analysis |
Information System for Product Cost by Sales Order |
Key Figures in Product Cost by Sales Order |
Summarized Analysis |
Summarization Hierarchies |
Maintain Summarization Hierarchies |
Function Module Exits for Summarization |
Maintaining Texts for Summarization Objects |
Data Collection for Summarization Hierarchy |
Executing Data Collection for Summarization Hierarchy |
Object Lists |
Sales Order Selection |
Order Selection |
Selection Parameters for Order Selection |
Display Fields in the Results List |
Display of Sales Order Items to Be Costed |
Detailed Reports |
Sales Order with Assigned Orders |
Detailed Reports on Sales Order Items |
Detailed Reports on Sales Order Cost Estimates |
Costed Multilevel BOM |
Cost Components |
Cost Elements |
Itemization |
More Reports: Line Items |
Costs for Intangible Goods and Services |
General Cost Object |
Control Parameters for General Cost Objects |
Creating a General Cost Object |
Cost Object Group |
Creating a Cost Object Group |
Internal Orders |
Creating an Internal Order |
General Cost Objects with Cumulative Time Base: Scenario |
Example for General Cost Object with Cumulative Time Base |
General Cost Objects with a Periodic Time Base: Scenario |
Example for General Cost Object with Periodic Time Base |
Overhead |
Applied Overhead |
Costing Sheet |
Overhead Key |
Process Costs |
Template |
Process Cost Planning |
Cost Planning for General Cost Objects |
Unit Costing |
Cost Planning for General Cost Objects with a Periodic Time Base |
Planning Layout |
Planning Costs with the Planning Layout for Activity Type Planni |
Planning Costs Using Statistical Key Figures |
Example of Planning with Statistical Key Figures |
Creating the Link to the Logistics Information System (LIS) |
Planning Statistical Key Figures By Period |
Transferring Key Figures from the Logistics Information System ( |
Planning |
Manual Planning |
Integrated Planning for Internal Orders |
Integrated Planning Indicator in Versions |
Copying Planning |
Notes on "Copying From Actual to Plan" |
Notes on Copying Planning |
Overall Planning |
Cost Element and Activity Input Planning (Detail Planning) |
Unit Costing |
Planning Primary Costs and Revenues |
Performing Primary Cost Planning and Revenue Planning |
Resource Planning |
Pricing |
Resource Planning |
Revaluating Resource Planning |
Planning Activity Input |
Planning Statistical Key Figures |
Planning Statistical Key Figures |
Executing Manual Planning |
Techniques for Supporting Manual Planning |
Flexible Selection of Planning Screens |
Planning Screen Layout |
Planner Profiles |
Planning Layouts |
Standard Planning Layouts |
Structuring Planning Layouts |
Defining Planning Layouts |
Periodic Allocations in Planning |
Periodic Reposting in Planning |
Planning Overheads |
Planned Settlement for Internal Orders |
Cost Center Allocations (Plan) |
Actual Costs in Cost Object Controlling |
Reposting Costs and Revenues Manually |
Reposting Line Items |
Time Sheets in Cost Object Controlling |
Direct Activity Allocation |
Reposting Internal Activity Allocation |
Entering Sender Activities |
Manual Actual Price |
Manual Cost Allocation |
Entering Statistical Key Figures |
Transfer of External CO Actual Transaction Data to the SAP Syste |
Transferring Data |
Postprocessing The Data Transfer |
Reversing The Data Transfer |
Data Transfer Log |
Period-End Closing for General Cost Objects: Scenario |
Schedule Manager (CA) |
Individual Functions of the Schedule Manager |
Using the Scheduler |
Task List |
Task Types |
Creating a Task List |
Inserting Tasks/Task Groups into the Task List |
Storing Task Documentation |
Scheduling Tasks in the Daily Overview |
Using the Monitor |
Using the Flow Definition |
Creating a Flow Definition |
Flow Step Types |
Multilevel Worklist |
Multilevel Worklist: Process Flow |
Monitor - Working with the Object List |
Processing Worklists |
Processing Status of Objects |
Scenarios for the Schedule Manager |
Starting Transactions/Reports Online, Scheduling/ Monitoring Job |
Starting Transactions/Reports Online, Scheduling Jobs/Job Chains |
Starting Transactions/Reports Online, Scheduling Jobs and Job Ch |
Importing Statistical Key Figures from the LIS (Actuals) |
Template Allocation in Actual |
Template-Allocation for Cost Objects |
Template for Cost Objects and Costing |
Assigning Templates for Cost Objects and Calculations |
Performing Template Allocation |
Revaluation at Actual Prices |
Revaluating at Actual Prices |
Actual Overhead in Cost Object Controlling |
Calculating Overhead |
Settlement of General Cost Objects |
Control Parameters for Settling General Cost Objects |
Creating a Settlement Rule for a General Cost Object |
Performing Settlement |
Period-End Closing in Internal Orders |
Schedule Manager (CA) |
Variables in Schedule Manager |
Defining Global Variables for the Task List and Flow Definition |
Defining Selection Variables |
Specifying Selection Variables in the Program Variants |
Specifying Selection Variables for Flow Definitions With Paralle |
Individual Functions of the Schedule Manager |
Using the Scheduler |
Task List |
Task Types |
Creating a Task List |
Inserting Tasks/Task Groups into the Task List |
Inserting Your Own Programs as Tasks |
Inserting Your Own Programs as Tasks |
Storing Task Documentation |
Scheduling Tasks in the Daily Overview |
Scheduling a Complete Task List in the Daily Overview |
Relative Start Time |
Runtime Analysis for Jobs |
Controlling Whether Jobs Are Started |
Using the Monitor |
Monitor - Monitoring Active and Completed Jobs |
Monitor - Working with the Object List |
Using the Flow Definition |
Flow Step Types |
Creating a Flow Definition |
Specifying Selection Variables for Flow Definitions With Paralle |
Choosing Objects for Processing |
Defining Processing Options, Output Options and Execution Types |
Error Handling |
Error: A Job Stops |
Error: A Job Becomes "Stuck" |
Error: An Executed Report Found an Error |
Error: Job Scheduling Was Unsuccessful |
Error: The Workflow Stops |
Error: The Workflow Becomes "Stuck" |
Multilevel Worklist |
Multilevel Worklist: Process Flow |
Monitor - Working with the Object List |
Processing Worklists |
Choosing Objects for Processing |
Processing Status of Objects |
Scenarios for the Schedule Manager |
Starting Transactions/Reports Online, Scheduling/ Monitoring Job |
Starting Transactions/Reports Online, Scheduling Jobs/Job Chains |
Starting Transactions/Reports Online, Scheduling Jobs and Job Ch |
Template Allocation in Actual |
Executing Template Allocations |
Revaluation at Actual Prices |
Revaluating at Actual Prices |
Worklist for Revaluation at Actual Prices |
Actual Overhead in Cost Object Controlling |
Calculating Overhead |
Results Analysis |
Results Analysis Methods |
Assignment of Results Analysis Methods to Objects |
(01) Revenue-Based Method with Profit Realization |
(02) Revenue-Based Method Without Profit Realization |
(03) Cost-Based POC Method |
(04) Quantity-Based Method |
(05) Quantity-Based POC Method |
(06) POC Method on Basis of Revenue Planned by Period |
(08) COS from “Old” Resource-Related Billing |
(10) Inventory Determination, Without Planned Costs, Without Mil |
(11) Inventory Determination, Without Planned Costs, With Milest |
(12) Inventory Determination, Reserves for Follow-Up Costs, With |
(13) Inventory Determination “WIP at Actual Costs” |
(14) COS from Resource-Related Billing of Dynamic Items |
(15) Revenue from Resource-Related Billing and Simulation of Dyn |
Internal Order Settlement |
Internal Order Settlement to One Receiver |
 Settlement (CO) |
Archiving of General Cost Objects |
Cost Object Controlling: Information System |
Key Figures in Cost Object Controlling |
Cost Analysis |
Information System for Costs for Intangible Goods and Services |
Key Figures in Costs for Intangible Goods and Services |
Summarized Analysis |
Summarization Hierarchies |
Maintain Summarization Hierarchies |
Function Module Exits for Summarization |
Maintaining Texts for Summarization Objects |
Data Collection for Summarization Hierarchy |
Executing Data Collection for Summarization Hierarchy |
Object Lists |
Order Selection |
Selection Parameters for Order Selection |
Display Fields in the Results List |
Overview of Summarization Hierarchies |
Detailed Reports |
Detailed Reports for Orders |
Object Comparisons |
Order vs. Order Plan/Actual Comparison |
Summarization Hierarchies: Plan / Actual Comparison |
More Reports: Line Items |