Evaluating the Planning Run (PP-MRP-PE)
MRP List and Stock/Requirements List
Material Requirements Planning
Material Information
Use Individual Access for Lists
Using Collective Access for MRP Lists
Using Collective Access for Stock/Requirements Lists
Sorting Material Lists
Creating Worklists
Working with the Lists
Searching for Information
Filtering Information
Working with List Header and Material Tree
Individual Line Display
Individual Line Display
Display of Period Totals
Display of Period Totals
Working with Individual MRP Elements
Working with Whole Lists
Graphical Display
Graphical Display of Lists
Mail Connection
Set up and Start Mail Connection
Workflow for Mail to MRP Controller
Comparing MRP List and Stock/Requirements List
Checking the Capacity Situation
Printing Individual Lists
Printing Several MRP Lists
Navigation Between Information
User-Specific Configuration of the Lists
Settings
Configuring Access to the Lists
Material Tree
Select Fields in the Tree
Sort/Group Fields in the Tree
Flexible Transaction Calls
Define General Transaction Calls
Transaction Calls per MRP Element
Traffic Lights
Define Traffic Lights
Report RMDMRPLIST: Displaying Planning Data over the Internet
Planning Result and Planning Situation
Using Individual Access for Planning Result/Planning Situation
Planning Situation According to DRP
Compare Planning Result and Planning Situation
Work with Planning Result and Planning Situation
Work with Planning Result and Planning Situation (List-Based)
Using Collective Access for Planning Result
Using Collective Access for Planning Situation
Access Multi-Plant Planning Situation
Cross-System Planning Situation (CA-BFA)
Procedure: Cross-System Planning Situation
Evaluate the Cross-System Planning Situation
Pegged Requirements
Access Pegged Requirements
Example for Pegged Requirements
Order Report
Use Order Report
Planning Table