Consumption-Based Planning (MM-CBP)
Consumption-Based Planning
Overview of the Main Transaction Codes for CBP
MRP Procedures in Consumption-Based Planning
Reorder Point Planning
Reorder Point Planning Procedure
Reorder Point Planning with External Requirements
Forecast-Based Planning
Forecast-Based Planning Procedure
Time-Phased Planning
Time-Phased Planning Procedure
Range of Coverage Profile in Time-Phased Planning
Time-phased Planning Process with Delivery Cycle
Time-phased Planning Process with Reorder Point Planning
Master Data
Planning Calendar
Creating Planning Calendars with Calculation Rule
Creating Planning Calendars without Calculation Rule
Change Planning Calendar
Quota Arrangements
Allocation Quota Arrangement
Example for Allocation Quota Arrangement
Splitting Quota Arrangement
Example for Splitting Quota Arrangement
Lot Size and Rounding Profile in Quota Arrangement
Example for Maximum Lot Size
Priority and Maximum Release Quantity per Period
Example for Priority and Maximum Release Quantity
Maintaining the Quota File
Planning Processes
Checking the Planning File
Individual Customer Planning File Entries
Planning Run Type
Planning Mode
Calculating Low-Level Codes
Displaying the Planning File
Setting Up the Planning File
Creating Entries in the Planning File Manually
Check the Consistency of the Planning File
Net Requirements Calculation
Net Requirements Calculation for Reorder Point Planning
Net Requirements Calculation for Forecast-Based Planning
Lot-Size Calculation
Lot-Sizing Procedures
Static Lot-Sizing Procedures
Lot-for-Lot Order Quantity
Fixed Lot Size
Replenishment up to Maximum Stock Level
Period Lot-Sizing Procedures
Availability Date for Period Lot-Sizing Procedure
Example for Determination of Availability Date
Delivery Date Instead of Availability Date
Example for Delivery Date Instead of Availability Date
Optimum Lot-Sizing Procedures
Part Period Balancing
Least Unit Cost Procedure
Dynamic Lot Size Creation
Groff Reorder Procedure
Lot Sizes with Splitting and Overlapping
Short-Term and Long-Term Lot Size
Lot-for-Lot Remaining Order Quantity
Rounding
Rounding Profile
Scheduling
Backward Scheduling for External Procurement
Example of Backward Scheduling for External Procurement
Forward Scheduling for External Procurement
Example of Forward Scheduling for External Procurement
Determining the Procurement Proposal
Procurement Type and Special Procurement Type
Quota Arrangements
Determining Source of Supply for External Procurement
Shipping Notification
Creation of Exception Messages
Rescheduling Check
Stock Transfer from Plant to Plant
Planned Orders for Stock Transfer
Storage Location MRP
Planning Storage Location Stock Separately
Excluding a Storage Location from MRP
MRP Area
Examples for Planning with MRP Areas
Implementing MRP Areas
Preparing for Material Requirements Planning with MRP Areas
Converting the Planning File Entries
Planning File Entries for MRP Areas
MRP Area Segments in the Material Master
Maintenance of Mass Data
Planning Material Requirements with MRP Areas
Material Requirements Planning with MRP Areas
Determining and Assigning Storage Locations to the MRP Area
Determine Source of Supply for Delivery Schedules for MRP Areas
Stock Transfer from Plant to MRP Area
Example: MRP for Two Storage Locations
Carrying Out the Planning Run (PP-MRP-PR)
Control Parameters for the Planning Run
Planning Run Type in the Initial Screen
Creation Indicator
Creation Indicators in the Initial Screen and the MRP Group
Planning Mode in the Initial Screen
Scheduling Control in the Initial Screen
Total Planning
Carry Out Total Planning Online
Execute Total Planning in Background Mode
User Exit: Material Selection for the Total Planning Run
Parallel Processing
Carrying Out Single-Item, Single-Level Planning
Working with the Planning Result
Evaluating the Planning Result
MRP List and Stock/Requirements List
Material Requirements Planning
Material Information
Use Individual Access for Lists
Using Collective Access for MRP Lists
Using Collective Access for Stock/Requirements Lists
Sorting Material Lists
Creating Worklists
Working with the Lists
Searching for Information
Filtering Information
Working with List Header and Material Tree
Individual Line Display
Individual Line Display
Display of Period Totals
Display of Period Totals
Working with Individual MRP Elements
Working with Whole Lists
Graphical Display
Graphical Display of Lists
Comparing MRP List and Stock/Requirements List
Printing Individual Lists
Printing Several MRP Lists
Navigation Between Information
User-Specific Configuration of the Lists
Settings
Configuring Access to the Lists
Material Tree
Select Fields in the Tree
Sort/Group Fields in the Tree
Flexible Transaction Calls
Define General Transaction Calls
Transaction Calls per MRP Element
Traffic Lights
Define Traffic Lights
Procurement Proposal (PP-MRP-PP)
Planned Order
Display Planned Order
Create Planned Order Manually
Change Planned Order
Conversion of Planned Orders
Converting Planned Orders into Purchase Requisitions
Firming Procurement Proposals
Planning Time Fence for Transmitted Schedule Lines Only
Forecast Parameters
Overview
Forecast Models
Model Selection
Manual Model Selection
Automatic Model Selection
Manual Model Selection with Additional System Chec
Model Initialization
Ex-Post Forecast
Parameter Optimization
Maintaining Forecast Parameters
Forecast Parameters: Independent of the Forecast M
Forecast Parameters: Dependent on the Forecast Mod
Creating Historical Data
Creating Forecast Values
Carrying out the Forecast with Reference to Anothe
Maintaining Parameters Using Profiles
Overview
Creating a Profile
Displaying a Profile
Changing a Profile
Deleting a Profile
Where-Used List for Profiles
Carrying Out the Forecast
Overview
Things to Think About Before Carrying out the Forecast
Forecast Options
Carrying Out the Individual Forecast
Carrying Out the Total Forecast
Carrying Out the Total Forecast in Background Mode
Calculating the Forecast Values
Calculating the Safety Stock and the Reorder Level
Ex-Post Forecast
Monitoring the Selected Forecast Model
How Does the System Optimize the Smoothing Factors
Forecast Result
Overview
Checking the Forecast Result Using a List
Checking the Forecast Result in Online Mode
Changing the Forecast Result
Significance of the Material Forecast for Material
Material Forecast
Reducing Forecast Requirements
Effects on Consumption-Based Planning Procedures
Splitting the Forecast Requirements
Forecast Formulas
Overview
Moving Average Model
Weighted Moving Average Model
Principles of First-Order Exponential Smoothing
Constant Model with First-Order Exponential Smoothing
Trend and Seasonal Models with First-Order Exponential Smoothing
Second-Order Exponential Smoothing
Evaluating Forecast Accuracy
Safety Stock Calculation
Reorder Level Calculation