Procedure documentationUsing the Central Calendar Locate this document in the navigation structure

Procedure

  1. Start Central Calendar from DBA Cockpit.

    Choose   Jobs   Central Calendar  .

    If you have already run or planned actions, you see entries for each day, one for each system.

    Here is an example of entries for Thursday February 8 affecting two systems, FUD and FIB:

    3

    FUD

    2

    4

    FIB

    1

    On system FUD for Thursday February 8, there were three actions scheduled, two of which had the highest status severity. For example, the highest status severity for FUD might be “Finished with warning”, in which case the entry for FUD is displayed with a yellow background. This means that two actions ended with a warning.

    On system FIB for the same day, there were four actions planned, one of which ended with the highest severity. For example, the highest severity for FIB might be “Finished with error”, in which case the entry for FIB is displayed with a red background. This means that one action ended with an error.

    The following table shows the color-coded statuses in Central Calendar, which you can also see by choosing Legend:

    Color

    Status

    Light blue

    Planned

    Dark blue

    Running

    Green

    Finished successfully

    Yellow

    Finished with warning

    Red

    Finished with error

    Dark yellow

    No longer available

    Dark red

    Scheduling failed

  2. To display a summary of the actions for a day, double-click the day header.

    The system displays a summary of the actions and status for each system on the day you selected, as in the following example:

    System

    Total

    No longer available

    Scheduled

    Running

    Finished

    Warning

    Error

    Overdue

    FUD

    3

    1

    2

    FIB

    4

    3

    1

  3. To display the actions for a particular system, double-click the entry for the system for a particular day.

    You see the relevant day in DBA Planning Calendar. You can schedule jobs using DBA Planning Calendar.

  4. To refresh the display for the system from which you called Central Calendar, choose Refresh.

  5. To refresh the display for all systems, choose Remote Refresh.

    You can remotely refresh the display as follows:

    Method

    How the Refresh Runs

    Run in Dialog

    Runs in dialog mode, which can take a long time, so not normally recommended

    Start immediately

    Runs immediately in the background as a job

    Schedule at

    Runs in the background at the time that you specify

    Note Note

    We recommend that you schedule the Central Calendar Log Collector to run regularly.

    End of the note.
  6. If required, you can customize the calendar display as follows:

    • Specify a factory calendar in Calendar ID.

      Holidays are displayed with the same background color as weekend days. This in no way restricts the planning of actions in DBA Planning Calendar.

    • To switch to day, week, or month view, choose   Administration   View Day   Administration   View Week   or View Month.

    • Choose Save Settings and change Number of Weeks or Entries per Day in the display