Show TOC Start of Content Area

Key figure  Net Present Value  Locate the document in its SAP Library structure

Technical name: 0RPM_NPV

Use

This is the net present value of the project's future cash flows, discounted at the weighted-average cost of capital. Net Present Value is not calculated in the system, but must be manually entered.

Technical Data

Available from Release

3.1C

Unit

0CURRENCY

Aggregation

Summation

Exception Aggregation

Summation

 

End of Content Area