Show TOC

 Dependent validations Locate this document in the navigation structure

During dependent validations, registers in a relationship are validated together. You can use the following types of dependent validations:

  • Control meter validation (fixed value against relative value)

The system checks whether the total consumption of the settlement registers matches the consumption of the control register.

  • Serial switching validation

The system checks whether the total consumption of secondary installations exceeds the consumption of the primary register.

  • Cosine phi validation

The cosine phi is calculated from reactive/active registers.

In validation 04, the system checks whether values fall below a lower limit defined in Customizing.

In validation 05 (check against cosine phi of previous period), the system compares the cosine phi of the current and previous period(s).

  • Consumption ratio validations (fixed value and previous period)

The system creates a ratio for the consumption of registers in a register relationship. The system then checks whether the ratio matches either the fixed value or the consumption ratio of the previous period.