Show TOC

 Correction of Plausible Meter Reading Results Locate this document in the navigation structure

Use

This function allows you to correct plausible meter reading results. You can use this function if, for example, you originally estimated the customer’s meter reading and the customer provides you with the actual meter reading later.

Prerequisites

The meter reading must not have been billed already. A meter reading that has been billed cannot be changed until the billing has been reversed. This function can only used to correct plausible meter reading results.

Features

After you change meter reading result, it is validated again.

Activities

Initial Screen

All meter reading results are displayed by device and meter reading date. You use an indicator to select the meter readings to be processed.

Entry Screen

If you have selected several entries, they are processed sequentially. You choose Save or Forward to branch to the next entry. If the entry was saved, it is removed from the processing sequence.

You can specify the following meter reading data during correction of plausible meter reading results:

  • Meter reading

  • Meter reading date

  • Note from meter reader

  • Actual meter reading type

  • Meter reader

  • Time of day of meter reading

  • Actual meter reading date

  • Actual time of day of meter reading

  • Date of maximum meter reading

  • Time of day of maximum meter reading

  • Relevance to billing/extrapolation

Correction

For further information, refer to the function Fast Entry with/without Correction .