Set up Test Data for Availability Check 
Check that the plant is set up in SAP ECC:
In Customizing choose .
Check that the plant is assigned to the organizational unit in SAP ECC:
In Customizing choose .
R/3 System |
Client |
Plant |
Sales Org |
Distr Ch |
Division |
|---|---|---|---|---|---|
R38 |
800 |
0001 |
0001 |
01 |
01 |
Check that the material master is set up in SAP ECC.
In the SAP Easy Access menu choose .
Mat.no. |
Description |
Plant |
Stor. Loc |
Sales Org. |
Distr. Ch. |
Division |
|---|---|---|---|---|---|---|
M100 |
Product with availability check |
0001 |
0001 |
0001 |
01 |
01 |
Note
If you use numeric material numbers, you have to make sure that either the length of the material number fields in SAP CRM and in SAP APO is the same or that leading zeros are turned off in both systems.
Check the settings for the material master.
Choose Select view(s) to check the field entries in the views as follows:
Caution
The fields that are marked as mandatory must have entries in them. Otherwise the material master will not be relevant for availability check in SAP APO, even if it is included in the integration model of the APO Core Interface (APO-CIF).
View |
Field |
Mandatory |
Example Data |
|---|---|---|---|
Basic data1 |
Base Unit |
PC |
|
Division |
01 |
||
GenItemCatGroup |
NORM |
||
Gross weight |
2 kg |
||
Net weight |
1.5 kg |
||
Sales: sales org. 1 |
Conditions (prices) |
USD 1 per piece |
|
Delivering plant |
0001 |
||
Sales: general/plant |
Availability check |
yes |
02 (individual rqmt) Collective requirements are not supported. |
MRP 1 |
MRP Type |
yes |
PD (MRP) |
Reorder point |
0 |
||
Planning time fence |
10 |
||
MRP Controller |
yes |
010 |
|
Lot size |
yes |
EX |
|
MRP 2 |
Procurement type |
F (external procurement) |
|
Plnd dely time |
10 days |
||
GR processing time |
0 days |
||
SchedMargin key |
001 |
||
MRP 3 |
Strategy group |
PP (general planning strategy group) In this example, the strategy group is set up so that the system determines the requirements class 030. The requirements class in SAP ECC is equivalent to the check mode in SAP APO. The check mode 030 is used in Set up Customizing for Availability Check under the section In the SAP APO System, Step 4 Maintain Check Mode. For more information, see the SAP Library for SAP ECC under IMG in SAP ECC under and Planning Strategy. |
|
Availability check |
yes |
02 (individual rqmt) Collective requirements are not supported. |
Caution
For information on transferring changes to the product master data in the SAP ECC, see the SAP Library for SAP Supply Chain Management under .
Mat.no. |
Description |
Plant |
Storage Location |
|---|---|---|---|
M328 |
Acme X Organizer |
0001 |
0001 |
Check the stock in SAP ECC:
The easiest way to test the availability check is to create stock to cover requirements. You can create stock in SAP ECC by posting goods receipt.
In the SAP Easy Access menu choose .
In the Movement type field enter 561.
Check that the business partner is set up in SAP ECC.
In the SAP Easy Access menu choose .
Customer No. |
CRM Business Partner No. |
Name |
Sales Area |
|---|---|---|---|
1000 |
100 |
Acme International Technology |
0001/01/01 |