Repetitive Manufacturing: Planning
Technical name: SAP_PP_REM_PLANNING
Tasks
The planner converts the planning specifications from the higher-level Supply Chain into a feasible plan. The planner also assigns the planned
doers to the production lines, creates new planned orders and checks the capacity load. The aim is to create an optimal order sequence taking lower-level production areas into account. It may also be necessary for the planner to coordinate his planning with lower-level production areas.Activities in the SAP System
MiniApps
This MiniApp displays a list of all the planned orders to be produced on a production line in the current shift or on the current day.
Integration
The following graphic illustrates the integration between the Repetitive Manufacturing: Planning role and other roles.