Show TOC

Procedure documentationCopying and Pasting Between Models Locate this document in the navigation structure

 

You can copy a high-level element – iView, page or package – from one model, and paste it into another model.

Note Note

Be aware that images and global entry lists (both static and dynamic) cannot be included in the copy-paste.

End of the note.

Prerequisites

The model containing the element that you want to copy is open in Storyboard.

Procedure

  1. In your model, select the element that you want to copy.

  2. Choose   Edit   Copy   (or choose Copy from the context menu).

  3. Close the model and open the model into which you want to paste the element.

  4. Choose   Edit   Paste   (or choose Paste from the context menu).