!--a11y-->
Example 1: Rules-Based ATP Check - Subitems 
The rules-based ATP check in this example came up with two results (that is, two subitems).
In each subitem, the date in the 1st Requested Date field comes from the request schedule line belonging to the subitem.
In the higher-level item, the date in the Last Conf. Dlv. Date field is taken from the subitem with the last confirmed delivery date.
