Procedure documentation Editing or Deleting Actions (Oracle) Locate the document in its SAP Library structure

Procedure

This section tells you how to edit or delete actions in the DBA Planning Calendar for Oracle.

Use this procedure to change the scheduled time of an action or the command arguments used to execute it (including the names and number of tapes available for the backup or archiving).

You can also delete individual actions. However, you cannot delete all actions of an action pattern as a unit.

Prerequisites

Be sure that the changes you plan to make do not compromise critical database maintenance activities. For example, be sure that you do not alter or delete backup actions in such a way that you are no longer able to recover the database in the event of an error.

Note

If you started the DBA Planning Calendar using Local Calendar from the Central DBA Planning Calendar, you can edit or delete actions for all remote systems running on the same platform and with the same characteristics. This assumes that you have already defined the remote systems to the Central DBA Planning Calendar.

For example, assume that you call the DBA Planning Calendar from the Central DBA Planning Calendar on system FUD, which runs Oracle version 9. You can then schedule actions for all other Oracle systems running Oracle version 9. If the action you want to schedule also runs on Oracle version 8, then you can also schedule that action for all systems running Oracle version 8.

This only applies if you started the local calendar from the Central DBA Planning Calendar.

Procedure

...

       1.      Choose Administration ® CCMS ® DB Administration ® DBA Planning Calendar ® Local to start the DBA Planning Calendar. Alternatively call transaction DB13.

The system displays the calendar, with a list of actions for each day.

       2.      Select a particular day, for which you want to change or delete an action, by double-clicking the header of the action, or the + hotspot on the header.

Note

Alternatively, select the action you want to change or delete and choose Change action or Delete action.

       3.      Select the action and choose Delete action or Change action

Delete action: The system asks you to confirm the deletion. When you do so, the action is deleted from the DBA Planning Calendar. The corresponding background job is also deleted. Deletion of the job also stops automatic periodic repetition of the action, if scheduled. The procedure is finished.

Change action: The system displays a dialog showing the actions supported by the DBA Planning Calendar. The action you chose is selected. Continue with the rest of this procedure.

       4.      Change the start time or repeat period for the action, as required

       5.      Choose Parameters, if you want to change the attributes for the action. This allows you to change command arguments, profiles, or tablespaces, or add tapes and so on, depending on the selected action.

Note

Are you changing the number of tapes required for a backup? Then you need to make the change only once. The change is automatically activated for all repetitions of the action.

       6.      Choose Continue to finish scheduling the action.

Result

The system checks for conflicts with previously-scheduled activities. If any are found, the conflicts are displayed and the action is not scheduled.

Otherwise the action is changed in the Planning Calendar and the required background job is scheduled.

 

 