Show TOC Start of Content Area

Process documentation Creating a Rule-Based Pool Linkage Locate the document in its SAP Library structure

Purpose

You use the rule-based pool linkage

    If you want to link your single contract with a pool contract, but the start date of the single contract is unknown or not defined yet

    If you can only describe start date of the single contract with a date rule

The system creates the rule-based linkage during contract inception. If the contract is already active, you cannot create a rule-based pool linkage.

If the system cannot activate the pool linkage, an error message is displayed.

Prerequisites

    You have not activated the single contract yet.

    You have created a pool contract.

    The organizational data and currency are identical in both the contract item and the pool contract item.

Process Flow

The following figure shows the process flow for the rule-based pool linkage:

This graphic is explained in the accompanying text

 

 

End of Content Area