!--a11y-->
Creating the Pool Linkage 
If you want to bill usage with an aggregate contract from a certain, valid point in time, or perform a recalculation with a single pool contract, link a single contract with a pool contract. You define the linkage in the single contract. The linkage is initially valid indefinitely, which means it has no defined end date.
· You have created a pool contract.
· You have specified a valid linkage date – that is, the date lies within the period of the service contract/pool contract.
· The linkage date coincides with the start date of a service period.
· The usage billing periods are synchronized with the service billing periods – that is, the end date of a usage billing period coincides with the end date of a service billing period.
· The organizational data and currency are identical in both the contract item and the pool contract item.
You can use the Business Add-In (BAdI) CRM Doc Flow: Check Document Linkages / Fill Customer Fields to perform additional checks.
· No active link to another pool contract exists within the proposed linkage period.
· No billing document has been created for the proposed linkage period of the single contract.
· You have neither prebilled nor prebilled the pool period for the proposed linkage period of the pool contract.
The following figure shows the process flow for creating the pool linkage:
