Show TOC

Procedure documentationViewing the Status of a Package Schedule Locate this document in the navigation structure

 

Use this procedure to do the following:

  • View the status of a package schedule

  • Edit package schedules

  • View a history of when a package was run against a schedule

  • Edit package parameters

  • Delete schedules

Prerequisites

A package is scheduled.

Procedure

Choose   eData   Packages Schedule Status  .

More Information

Running a Package