Procedure documentationScheduling Dimension Member Processing Locate this document in the navigation structure

Prerequisites

The dimension is validated using Administration.

If you have an existing application set, copy this package from the most recent version of ApShell to get the appropriate updates.

Procedure

  1. Add the ADMINTASK_MAKEDIM package.

  2. Run the package. See Running a Package.

  3. Ensure that the correct dimension name is in the Input Dimension name field. Leave the Input Source table name field blank. Choose Next.

  4. In the Schedule the processing of dimension members field, choose Yes, and choose Finish.

  5. Enter data as required.

  6. Enter the following package property. See Package Properties.

    TASK(Admin_Makedim,BSCHEDULEPROCESS,%ScheduleProcess%)

    Ensure that the value of %ScheduleProcess% is 1 (Yes).