Show TOC

Procedure documentationEditing Facilities

 

On the Facility tab page you specify basic settings for the master contract. If you are using the master contract in a facility, the system uses these settings.

Prerequisites

  • You have made the relevant settings for the feature attribute Facilities in Customizing for Master Contract Management (FS-MCM) under Start of the navigation path Product Management Next navigation step Product Definition Next navigation step Master Contract Products End of the navigation path.

  • You have neither deactivated nor locked the Facilities feature in the master contract on the Features tab page.

Procedure

In the Control group box, specify the credit clearing mode and the clearing mode for currency translation.