CL_ISU_EDM_SETTLSTEP_0002
Final class derived from CL_ISU_EDM_SETTLSTEP
The process method determines the allocated PoDs for each settlement unit in a settlement run. The method determines whether consumption for each PoD is entered via an interval meter or a normal consumption meter (synthetic load profile is allocated at installation level) – see also Data selection.
If a selection document was entered, a new selection is not executed. Instead, the system checks whether valid data already exists for the settlement period.
The selection results are saved in the following tables in the database:
· EEDMSETTLUF for synthetic load profiles including usage factor

The profile number of the synthetic load profile also contains information about the allocation to a customer group (for non-interval customers) in the table.
· EEDMSETTLIN for load shapes (measured using an interval meter)