Start of Content Area

Procedure documentation Displaying a Work Schedule  Locate the document in its SAP Library structure

  1. Select the time period for which you want to display a work schedule.

Note that you can display the work schedule for a maximum of 50 days. If you choose a longer period, the system issues the message Not all the selected days can be displayed.

  1. Choose Display report.
  2. If required, print the work schedule.