Features
There are two ways to carry out the planning run both in the SAP standard and in AFS. You can carry out the planning run for one material (
Single-Item Planning) or for all materials of one or more plants (Total Planning).Due to the specific data structure of AFS materials (grid values and categories), the requirements to stock allocation logic differs in AFS MRP from the SAP standard. Within this logic you can specify a search method for the requirements coverage in the AFS MRP (material master).

Note that the search method for the availability check is separately controlled (Customizing).
AFS MRP is based on a
net requirements calculation. You have two options for carrying this out:
For more information, see
Planning Run Type.
The graphic depicts the logistical processing of the planning execution.


Note that the AFS materials are only planned through the end of the planning horizon. A planning in the entire horizon as in the SAP standard is not possible.
The graphic depicts the planning horizon, in which all AFS materials are planned. All requirements that are within the planning horizon are planned. The requirement beyond the planning horizon is always ignored.

AFS Restrictions