Start of Navigation Tree
Start Level 1 Node Production Planning and ControlProduction Planning and ControlEnd Level 1 Node Production Planning and Control
   Start Level 2 Node Basic DataBasic DataEnd Level 2 Node Basic Data
      Start Level 3 Node Bills of MaterialBills of MaterialEnd Level 3 Node Bills of Material
         Start Level 4 Node Phantom Assemblies in AFSPhantom Assemblies in AFSEnd Level 4 Node Phantom Assemblies in AFS
         Start Level 4 Node Grid Value AssignmentGrid Value AssignmentEnd Level 4 Node Grid Value Assignment
            Start Level 5 Node Automatic Grid Value AssignmentAutomatic Grid Value AssignmentEnd Level 5 Node Automatic Grid Value Assignment
            Start Level 5 Node Manual Grid Value AssignmentManual Grid Value AssignmentEnd Level 5 Node Manual Grid Value Assignment
            Start Level 5 Node Deviation Quantities and Zero QuantitiesDeviation Quantities and Zero QuantitiesEnd Level 5 Node Deviation Quantities and Zero Quantities
         Start Level 4 Node Quantity distribution profileQuantity distribution profileEnd Level 4 Node Quantity distribution profile
            Start Level 5 Node Check Function for Quantity Distribution ProfileCheck Function for Quantity Distribution ProfileEnd Level 5 Node Check Function for Quantity Distribution Profile
            Start Level 5 Node Mass Data Change of AFS BOMs with Quantity Distribution ProfileMass Data Change of AFS BOMs with Quantity Distribution ProfileEnd Level 5 Node Mass Data Change of AFS BOMs with Quantity Distribution Profile
      Start Level 3 Node RoutingsRoutingsEnd Level 3 Node Routings
   Start Level 2 Node Time-Phased Special Procurement Key (AFS)Time-Phased Special Procurement Key (AFS)End Level 2 Node Time-Phased Special Procurement Key (AFS)
   Start Level 2 Node AFS DiscontinuationAFS DiscontinuationEnd Level 2 Node AFS Discontinuation
   Start Level 2 Node AFS: MRP CockpitAFS: MRP CockpitEnd Level 2 Node AFS: MRP Cockpit
   Start Level 2 Node Sales and Operations PlanningSales and Operations PlanningEnd Level 2 Node Sales and Operations Planning
      Start Level 3 Node AFS Data Transfer from SOP to AFS Demand ManagementAFS Data Transfer from SOP to AFS Demand ManagementEnd Level 3 Node AFS Data Transfer from SOP to AFS Demand Management
      Start Level 3 Node Presizing Period Splitting in the SOP TransferPresizing Period Splitting in the SOP TransferEnd Level 3 Node Presizing Period Splitting in the SOP Transfer
      Start Level 3 Node AFS: Quantity and Distribution CalculationAFS: Quantity and Distribution CalculationEnd Level 3 Node AFS: Quantity and Distribution Calculation
   Start Level 2 Node Requirements PlanningRequirements PlanningEnd Level 2 Node Requirements Planning
      Start Level 3 Node Planning ProcedurePlanning ProcedureEnd Level 3 Node Planning Procedure
         Start Level 4 Node MRP TypeMRP TypeEnd Level 4 Node MRP Type
         Start Level 4 Node MRP IndicatorMRP IndicatorEnd Level 4 Node MRP Indicator
         Start Level 4 Node SKU Horizon Methods 1 and 2SKU Horizon Methods 1 and 2End Level 4 Node SKU Horizon Methods 1 and 2
         Start Level 4 Node An Overview of Lot SizesAn Overview of Lot SizesEnd Level 4 Node An Overview of Lot Sizes
            Start Level 5 Node Lot-Sizes in MRPLot-Sizes in MRPEnd Level 5 Node Lot-Sizes in MRP
            Start Level 5 Node Requirements Distribution RatioRequirements Distribution RatioEnd Level 5 Node Requirements Distribution Ratio
            Start Level 5 Node SKU Group Procedure 1SKU Group Procedure 1End Level 5 Node SKU Group Procedure 1
            Start Level 5 Node SKU Group Procedure 2SKU Group Procedure 2End Level 5 Node SKU Group Procedure 2
            Start Level 5 Node Long-term and Short-term Lot Sizing ProcedureLong-term and Short-term Lot Sizing ProcedureEnd Level 5 Node Long-term and Short-term Lot Sizing Procedure
         Start Level 4 Node Two-Level RoundingTwo-Level RoundingEnd Level 4 Node Two-Level Rounding
         Start Level 4 Node Planned Independent RequirementsPlanned Independent RequirementsEnd Level 4 Node Planned Independent Requirements
            Start Level 5 Node Consumption by Special OrdersConsumption by Special OrdersEnd Level 5 Node Consumption by Special Orders
         Start Level 4 Node Exception MessagesException MessagesEnd Level 4 Node Exception Messages
            Start Level 5 Node Exception Messages for AFS MaterialsException Messages for AFS MaterialsEnd Level 5 Node Exception Messages for AFS Materials
            Start Level 5 Node Description of the Exception MessagesDescription of the Exception MessagesEnd Level 5 Node Description of the Exception Messages
      Start Level 3 Node Planning ExecutionPlanning ExecutionEnd Level 3 Node Planning Execution
         Start Level 4 Node Total PlanningTotal PlanningEnd Level 4 Node Total Planning
         Start Level 4 Node Single-Item PlanningSingle-Item PlanningEnd Level 4 Node Single-Item Planning
            Start Level 5 Node AFS MRP in Background ModeAFS MRP in Background ModeEnd Level 5 Node AFS MRP in Background Mode
         Start Level 4 Node User-specific SettingsUser-specific SettingsEnd Level 4 Node User-specific Settings
      Start Level 3 Node ATP against PlanningATP against PlanningEnd Level 3 Node ATP against Planning
      Start Level 3 Node ATP Overview (AFS)ATP Overview (AFS)End Level 3 Node ATP Overview (AFS)
      Start Level 3 Node Evaluation of the Planning ResultEvaluation of the Planning ResultEnd Level 3 Node Evaluation of the Planning Result
         Start Level 4 Node AFS MRP ListAFS MRP ListEnd Level 4 Node AFS MRP List
         Start Level 4 Node AFS Stock/Requirements ListAFS Stock/Requirements ListEnd Level 4 Node AFS Stock/Requirements List
         Start Level 4 Node What the AFS MRP Statuses MeanWhat the AFS MRP Statuses MeanEnd Level 4 Node What the AFS MRP Statuses Mean
         Start Level 4 Node Individual Display of the Standard MRP ListIndividual Display of the Standard MRP ListEnd Level 4 Node Individual Display of the Standard MRP List
         Start Level 4 Node Collective Display of the Standard MRP ListCollective Display of the Standard MRP ListEnd Level 4 Node Collective Display of the Standard MRP List
         Start Level 4 Node Current Standard Stock/Requirements ListCurrent Standard Stock/Requirements ListEnd Level 4 Node Current Standard Stock/Requirements List
         Start Level 4 Node Collective Display of the SAP Standard Stock/ Requirements ListCollective Display of the SAP Standard Stock/ Requirements ListEnd Level 4 Node Collective Display of the SAP Standard Stock/ Requirements List
         Start Level 4 Node Planning SituationPlanning SituationEnd Level 4 Node Planning Situation
         Start Level 4 Node AFS Pegged RequirementsAFS Pegged RequirementsEnd Level 4 Node AFS Pegged Requirements
         Start Level 4 Node AFS Order ReportAFS Order ReportEnd Level 4 Node AFS Order Report
         Start Level 4 Node AFS Missing Parts Information SystemAFS Missing Parts Information SystemEnd Level 4 Node AFS Missing Parts Information System
      Start Level 3 Node Planned ordersPlanned ordersEnd Level 3 Node Planned orders
         Start Level 4 Node Partial Conversion of AFS Planned OrdersPartial Conversion of AFS Planned OrdersEnd Level 4 Node Partial Conversion of AFS Planned Orders
   Start Level 2 Node Production OrdersProduction OrdersEnd Level 2 Node Production Orders
      Start Level 3 Node Fixed Batch Assignment of Components at SKU LevelFixed Batch Assignment of Components at SKU LevelEnd Level 3 Node Fixed Batch Assignment of Components at SKU Level
      Start Level 3 Node Deviation Quantities in the Production OrderDeviation Quantities in the Production OrderEnd Level 3 Node Deviation Quantities in the Production Order
      Start Level 3 Node Availability Check for ComponentsAvailability Check for ComponentsEnd Level 3 Node Availability Check for Components
      Start Level 3 Node Material Staging for ComponentsMaterial Staging for ComponentsEnd Level 3 Node Material Staging for Components
      Start Level 3 Node ConfirmationConfirmationEnd Level 3 Node Confirmation
         Start Level 4 Node Time Ticket Confirmation for the Production OrderTime Ticket Confirmation for the Production OrderEnd Level 4 Node Time Ticket Confirmation for the Production Order
   Start Level 2 Node AFS Order Progress ReportAFS Order Progress ReportEnd Level 2 Node AFS Order Progress Report
   Start Level 2 Node Combined OrdersCombined OrdersEnd Level 2 Node Combined Orders
   Start Level 2 Node AFS Print Programs for Shop Floor PapersAFS Print Programs for Shop Floor PapersEnd Level 2 Node AFS Print Programs for Shop Floor Papers