With the aid of mass change I and II you can quickly and easily change the vendor capacity quantities and the vendor capacity structure.
- With mass change I you change the capacity quantities (total and overload capacities).
- With mass change II you change the structure of the vendor capacity. You can add new vendor capacity nodes or delete already existing nodes. At the lowest capacity level, the material level, you can add or delete materials and change the base unit of measure. You can carry out the mass change for any number of capacity periods of a vendor at the same time.