!--a11y-->
Use
In the SAP standard you can determine the standard price price control S using the
mixed costing. Use this option especially if you
The costing of the individual alternatives would lead to different production costs or purchase prices. When using the mixed costing, the system determines a mixed price to valuate the material stock in your company.
Features
In the AFS system you can use the mixed costing for the valuation of
If a BOM is assigned to an AFS material with split valuation according to valuation types, you can cost individual components using the mixed costing. The components with mixed costing are transferred to the costing of the superior material with the determined mixed price that is based on the mixing ratio and the procurement alternative.

An AFS finished product with split valuation (valuation type