!--a11y-->
Use
AFS single-item planning plans the requirements as well as their characteristic values for an AFS material.
Features
AFS has developed a separate planning run for the single-item planning of AFS materials. It can be carried out at a single-level or multi-level basis.
Using the AFS single-item planning you can only carry out a regenerative planning for AFS materials, if you choose the planning mode reset planning data.
After the planning run, you get complex planning data due to the AFS-specific material structure. For better clarity, you can control the display of the MRP list so that only some of this data is displayed. Using the AFS filter you can select AFS-specific data, such as stock category, requirements category and grid value, according to certain data combinations.

For example, you want the system to only display all blue T-shirts in quality 001A after the planning run.
With the function sort and compress you can compress the MRP list display according to the following criteria:

For example, you compress the display of the planning result monthly by stock type, stock category and period. The MRP list displays all data, except the stock type and the stock category. In addition, only the monthly planning runs will be displayed.
For further information, see
AFS MRP List and AFS Stock / Requirements List.
You can use the function sort for future applications.
AFS Restrictions
AFS does not support multi-level single-item planning in simulation mode.