Prerequisites for the OLTP Scheduling Agreement If you work with purchase scheduling agreements, you should note the following prerequisites in the SAP R/3 system:
The
OLTP scheduling agreement
in the SAP R/3 system is usually a scheduling agreement with the document type
LPA
, for which the
Release Docu.
indicator has been set under
in Customizing for
Purchasing
.
As a rule, the APO scheduling agreement in the SAP R/3 system is a scheduling agreement with the document type LP.
You should assign the MPR type
X0
(
W/o MRP with BOM Explosion
) to the materials used. You do this in the material master, on the
MRP 1
tab page.
Create an integration model containing the material masters, plants, scheduling agreements, vendors and storage location stocks. To transfer OLTP schedule lines as well as confirmations and shipping notifications against scheduling agreements to the SAP APO system select
POs and PReqs
.
Activate the model.
In the SAP R/3 system, choose
The delivery schedule lines for and releases against OLTP scheduling agreements are generated in the OLTP system.
To do this, the following conditions must be satisfied in the OLTP system (that is, the R/3 system):
In the additional data for the scheduling agreement item, choose the setting
Generate and output SA release in R/3
for the
External Planning
indicator.
The OLTP scheduling agreement in the SAP R/3 system is usually a scheduling agreement with the document type
LPA
, for which the
Release Docu.
indicator has been set under
in Customizing for
Purchasing
.
Note
You should note that you must not have any items with different
External Planning
settings in a scheduling agreement because this leads to problems in the message determination process. In other words,
all
items of a scheduling agreement must be planned either in the SAP APO system or in the OLTP system.
Note
If delivery schedule lines already exist for an SA item, the setting for the
External Planning
indicator can no longer be changed.
Transfer the SA item to the SAP APO system over the
APO Core Interface (CIF).
If you want to send unconverted purchase requisitions in the OLTP scheduling agreement release you must use the Customer Exit MEETA001 (EXIT _SAPLEINL_001). For more information and for example coding see SAP Note 409394.
You define the release creation profile in Customizing for
Purchasing
under
.
You assign this release creation profile to the SA item in the detail data.
For APO scheduling agreements, you must create a separate release creation profile in the SAP APO system and assign it to the APO scheduling agreement in the external procurement relationship (in the SAP APO system).
This function is only available if you are using an SAP R/3 system (Automotive).
Prerequisites for the function are that:
You are using GR-based invoice verification (
GR-Based IV
indicator in the SA item), or
You are working with a confirmation control key that provides for
GR assignment
(Customizing for
Purchasing
under Confirmations -> Set Up Confirmation Control -> Confirmation Sequenceand ConfContrKindicator in the SA item).
Furthermore, you must use a release creation profile for which you have specified determination of the last goods receipts in the OLTP scheduling agreement.(
on the
Last Goods Receipts
tab page
.)
You can view the last deliveries when maintaining delivery schedule lines. Display the schedule lines for an SA release and choose
to display the last deliveries.
If you delete a procurement scheduling agreement in the OLTP system then the corresponding external procurement relationship is deleted in the SAP APO system.
For more information see Process External Procurement Relationship .
In SAP APO you can use the authorization object C_APO_EXPR to define which activities a user is allowed to carry out. For example, you can control whether a user is allowed to change master data.
Numerous Enhancementsand Business Add Ins(BAdIs) are available for external procurement.
For more information on customer-specific enhancements for the
APO Core Interface
(CIF)
see
Customer-specific CIF Enhancements for the Procurement Process (SAP APO and SAP R/3)
.
For more information on the CIF, see the SAP Library for
Advanced Planning and Optimization (SAP APO)
under
Integration of SAP APO and SAP R/3
.
For more information about Business Add-Ins see Business Add-Ins for External Procurement .