Creating a Planning JobFrom the SAP Easy Access menu, choose .
Enter a name and a short description for the planning job.
Choose .
The inital
Create Planning Job
screen appears.
Enter the planning book and the data view you specified in the activity, as well as the name of the planning version for which you want to run the job.
Choose .
The second
Create Planning Job
screen appears.
Enter the activity you want to carry out in this job.
Specify whether the system should generate a job log.
In this field ¼ |
Enter ¼ |
One |
If you want to use just one selection, set this indicator. In the field beside it, choose the selection ID using F4 Help. To display it, use the
|
Several |
If you want to use more than one selection, set this indicator. Use the
|
Select all |
If you want to process data for all the plannable characteristic value combinations in the tree structure, set this indicator. |
Aggregation level |
Define the aggregation level as follows: 1. Click on Aggregation level. 2. Select the characteristic which, in your planning area, represents products. 3. If your planning area contains a characteristic that represents locations, select also this characteristic. 4. Choose Enter. |
The planning level at which the mass processing job is executed is determined by the aggregation level.
The system determines which plannable characteristic value combinations are defined in the selection. For example:
Region |
Division |
Brand |
Product |
Plant (location) |
North |
Beverages |
GO |
A |
LOC1 |
North |
Food |
POWER |
B |
LOC1 |
South |
Ceramics |
FRAGILE |
D |
LOC2 |
South |
Beverages |
GO |
A |
LOC2 |
South |
Food |
BEAUTY |
C |
LOC2 |
The system determines which characteristics are defined as the aggregation level. For example, if you define Product and Location as your aggregation level, the system transfers data for:
Product |
Plant (location) |
A |
LOC1 |
A |
LOC2 |
B |
LOC1 |
C |
LOC2 |
D |
LOC2 |
Choose .