PSM: Cost Center/Activity Type: Analysis -
Target/Actual/Variance
Technical name: 0CCA_C02_Q0304
If you want to modify this query, note the special features of the InfoCube 0CCA_C02 CO-OM-CCA: Costs and Allocations (by Activity Type).
This query is an analysis report for the cost center manager. This query provides an overview of the incurred costs and consumption quantities on a cost center/activity type during the reporting timeframe.
For background
information on the concept of queries, see
Queries in
Controlling.
InfoObject |
Description of InfoObject (or Restrictions or Calculation Formula) |
0CO_AREA |
|
0CURTYPE |
|
0FISCVARNT |
|
0METYPE |
|
InfoObject |
Description of InfoObject |
0FISCPER |
|
0COSTELEMENT |
|
0FM_AREA |
|
0FUND |
|
0FUNC_AREA |
|
0GRANT_NBR |
0COSTCENTER |
|
0ACTTYPE |
InfoObject |
Description of InfoObject (or Restrictions or Calculation Formula) |
Target - split |
Split target costs distributed to the activity type during the reporting time frame (controlling area currency) |
Actual - split |
Split target costs distributed to the activity type during the reporting time frame (controlling area currency) |
Variance (%) |
Percentage variance between split actual and target costs |
Activity quantity -plan |
Plan quantities in the reporting timeframe |
Activity quantity - actual |
Actual quantities in the reporting timeframe |
Variance (%) |
Percentage variance between plan and actual quantities in the reporting timeframe |