PSM: WBS Elements for Cost Center: Plan/Actual
- Situation
Technical name: 0COOM_C02_Q0305
If you want to modify this query, note the special features of the InfoCube 0COOM_C02 CO-OM Costs and Allocations (Delta Extraction).
This query is a regular report for the cost center manager. It provides an overview of the costs in the current period and cumulated to the current period, that are incurred on some WBS elements. These are account assignment objects that are assigned to the cost center via the responsible cost center field in the WBS element. The system determines variances using the actual and planned costs.
For background
information on the concept of queries, see
Queries in
Controlling.
InfoObject |
Description of InfoObject (or Restrictions or Calculation Formula) |
0CO_AREA |
|
0CURTYPE |
|
0FISCVARNT |
|
0COSTCENTER |
|
0IOBJSV |
|
InfoObject |
Description |
0WBS_ELEMT |
|
0FM_AREA |
|
0FUND |
|
0FUNC_AREA |
|
0GRANT_NBR |
InfoObject |
Description of InfoObject (or Restrictions or Calculation Formula) |
0COSTELEMNT |
InfoObject |
Description of InfoObject (or Restrictions or Calculation Formula) |
Previous period and cumulated up to current period (Use of the
|
Values from the previous period and the cumulated values up to the current period |
Plan (restricted key figure) |
Planned costs on an assigned account assignment object (such as a WBS element) |
Actual (restricted key figure) |
Actual costs on an assigned account assignment object (such as a WBS element) |
Variance (%) (restricted key figure)
|
Percentage variance between actual and planned costs (actual - plan)/plan on an assigned account assignment object (such as a WBS element) |
The key figures planned costs, actual costs and variance are displayed for the previous period and cumulated up to the current period.
See also: