Cost Centers (Detail): Target/Actual - Situation
Technical name: 0CCA_C11_Q006
If you want to modify this query, note the special features of the 0CCA_C11
CO-OM-CCA: Costs and Allocations InfoCubeUse
This query is a regular report for the cost center manager. It provides an overview of the following costs incurred on a cost center:

This query is contained in the
For background information on the concept of queries, see
Queries in Controlling.Filters
InfoObject |
Description |
0CO_AREA |
Controlling area (variable 0P_COAR; single value entry, required) |
0CURTYPE |
Currency type (fixed value 10, company code currency) |
0FISCVARNT |
Fiscal year variant (SAP exit variable 0P_FVAEX) |
0COSTCENTER |
Cost center (entry optional, variable 0S_CCTR) |
Rows
InfoObject |
Description |
0COSTELEMNT |
Cost element |
Columns
InfoObject |
Description |
Previous period and cumulated up to current period (Use of the Situation - Current Period structure) |
Values from the previous period and the cumulated values up to the current period |
Actual |
Actual Costs |
Target |
Target Costs |
Variance (%) |
Percentage variance between actual and target costs (actual - target) / target |
The target costs, actual costs and variance key figures are displayed for the previous period and in cumulated form up to the current period.