PSM: Cost Center (Range): Actual Costs -
Situation
Technical name: 0CCA_C11_Q0350
If you want to modify this query, note the special features of the InfoCube 0CCA_C11 CO-OM-CCA: Costs and Allocations.
This query is a regular report for the area manager. It provides an overview of the following costs incurred in a cost center range:
· Actual costs from the previous two periods, with respective cost changes
· Actual costs cumulated up to the current period
· Actual costs projected for the whole year, and the total planned costs with variance between projection and total planned costs.
For background
information on the concept of queries, see
Queries in
Controlling.
InfoObject |
Description of InfoObject (or Restrictions or Calculation Formula) |
0CO_AREA |
|
0CURTYPE |
|
0FISCVARNT |
InfoObject |
Description of the InfoObject |
0COSTELEMNT |
|
0FM_AREA |
|
0FUND |
|
0FUNC_AREA |
|
0GRANT_NBR |
InfoObject |
Description of InfoObject (or Restrictions or Calculation Formula) |
0COSTCENTER |
|
InfoObject |
Description of InfoObject (or Restrictions or Calculation Formula) |
Previous period and cumulated up to current period (Use of the
|
Values from the previous period and the cumulated values up to the current period |
Actual |
Actual costs from the period before the last Not displayed as a column, used to calculate cost change |
Actual |
Actual costs |
Cost change |
Difference between the actual costs of the previous period and the closed period of the current fiscal year (percentage) |
Projection
|
Projection of actual costs for the entire year, based on the actual costs cumulated up to the current period of the current fiscal year |
Plan |
Planned costs Not displayed as a column, used to calculate variance |
Variance (%) |
Percentage variance between the projected actual costs and planned costs (actual - plan) / plan Not displayed as a column |