PSM: Cost Center (Range): Plan/Actual -
Situation
Technical name: 0CCA_C11_Q0360
If you want to modify this query, note the special features of the InfoCube 0CCA_C11 CO-OM-CCA: Costs and Allocations.
This query is a regular report for the area manager. It provides an overview of the following costs incurred in a cost center range:
· Actual and planned costs for each of the previous periods with respective variances
· Actual and planned costs cumulated up to the current period with respective variances
· Actual costs projected for the whole year, and the total planned costs with respective variance
For background
information on the concept of queries, see
Queries in
Controlling.
InfoObject |
Description of InfoObject (or Restrictions or Calculation Formula) |
0CO_AREA |
|
0CURTYPE |
|
0FISCVARNT |
InfoObject |
Description of InfoObject |
0COSTELEMNT |
|
0FM_AREA |
|
0FUND |
|
0FUNC_AREA |
|
0GRANT_NBR |
InfoObject |
Description of InfoObject (or Restrictions or Calculation Formula) |
0COSTCENTER |
|
InfoObject |
Description of InfoObject (or Restrictions or Calculation Formula) |
Previous period and cumulated up to current period (Use of the
|
Values from the previous period and the cumulated values up to the current period |
Actual |
Actual costs in current fiscal year |
Plan |
Planned costs in current fiscal year |
Variance (%) |
Percentage variance between actual and planned costs in the current fiscal year (actual - plan) / plan |
Actual projection |
Projection of actual costs for the entire year, based on the actual costs cumulated up to the current period of the current fiscal year |
Planned costs |
Planned costs from all periods in the current fiscal year |
Variance (%) |
Percentage variance between projected actual costs and planned costs (actual - plan) / plan |
The Planned costs, actual costs and variance key figures are always displayed for the previous period and displayed as cumulated up to the current period of the current fiscal year.
See also: